![Proby's Quay | at St. Finbarr's Street](https://data.docslib.org/img/3a60ab92a6e30910dab9bd827208bcff-1.webp)
3.14 + + 3.09 HANOVER SINGER HOUSE GARMENT 3.18 + SURFACE EXISTING PADDY- ELECTRIC TO BE RETAINED COSTCUTTER CAFE CAFE ALTERATIONS BARBARA HUBERT TUCKER'S WEST CORK SABOR SOUL WAGON GUSTO TORINO CENTRE BOOK BINDERY REBEL BURGER NORDESTINO TATOOS SUBWAY EDISON TAILORING TOURS PLATINUM PRIMETIME SERVICE AMIGOS COMPANY ADDITION OF PLANTERS FOR + 3.14 POSSIBLE LOCATION FOR STREET GREENING 2.50 + COMMISSIONED MURAL 3.00 + K2 + 3.12 + 2.34 SUSAN RYAN B1 + 2.50 GRAND PARADE BEAUTY B1 A1 + 3.00 SOHO + 2.50 3.53 + TOBIN STREET 3.46 + + 3.12 3.24 + + 3.29 EXISTING SURFACE TO BE RETAINED 1.8m CATENARY LIGHTING PART OF SEPARATE PLANNING APPLICATION HANOVER STREET K2 TRISKEL ARTS CENTRE + 3.53 + K2 2.8m A5 VACANT + 3.32 + K2 K2 1.5m + 3.72 + + 3.58 + A + 3.51 + + 3.49 + 3.40 + A1 CHRISTIAN A3 A1 SCIENCE SOCIETY B1 THAI 3.40 + WELLNESS CENTRE + 3.56 WIDENED FOOTPATH 3.38 + 3.64 + A3 UNINEST SCV STUDENT RESIDENCES 3.42 + K3 K3 K1 FUTURE B DEVELOPMENT OF A1 BISHOP LUCEY MEMORIES B2 B1 PARK MASON BRIDAL SOMA COFFEE FREEMASON'S HALL BOUTIQUE COMPANY POWER BOLLARDS AND IN BOWERY | TIP TOPCONVENT PLACE BUILDING MOUNTED LIGHTING LINE OF HISTORIC CITY WALL MARKED GROUND POWER UNITS TO BE TO MATCH EXISTING ON WITH CONTRAST PAVING STONE AND AT TUCKEY ST ENTRANCE TUCKEY AT 2.74 + RETENTION SOCKET FOR 2.78 + NORTH MAIN STREET ELECTRONIC BOLLARDS ELECTRONIC DISTRIBUTED THROUGHOUT INGROUND BRASS PLAQUE PARKLET SEATING AREAS TO ACT 2.91 + EXTERNAL CANOPY STREET WHERE APPLICABLE 2.87 + AS LOADING ZONE DURING 3.03 + 2.68 + DESIGNATED HOURS K2 BICYCLE PARKING EXISTING PAVEMENT 3.21 + 2.5m 3.37 + THE OVAL 3.33 + BAR GRAND PARADE 3.47 + PLANTING AREA HISTORIC 3.48+ 3.54 + WITH TURF FOR 2.5m UNRESTRICTED CANON BOLLARD 3.47 + 3.43 + 1:60 EXISTING CAR PARK + 2.68 1:80 BOAT ACCESS 3.5m ENTRANCE TO BE RELOCATED TOW Pc 2.39 + BERWICK FOUNTAIN PROBY’S QUAY | AT ST. FINBARR’S+ 3.40 STREET Pc + 2.15 +3.66 Pc Pc 6m Pc 2.5m Pc 3.7 2.21 + 3.45 Pc HOPKINS Pc 1 m HIGH HANDRAIL ON TUCKEY STREET HALL DEAN'S Pc COMMUNICATIONS 1:14 K2 TOP OF WALL WITH 2.02 2.2m UNDERLIGHTING B1 B1 B1 B2 Barrier K2 + 2.02 STEPS TO CROSSE'S GREEN 2 2.4 0.9 SLIPWAY + 2.18 + 3.33 + 2.77 2.01 + 2.74 3.46 + 3.39 + + 2.88 2.27 + + 2.70 Ramp + 3.06 + 3.04 TOW + 3.25 + 3.14 Pc + 2.37 + + 2.49 +3.48 + 3.32 + 3.53 + 3.45 + 3.35 CATENARY LIGHTING THROUGHOUT + 3.36 + 2.90 V LENGTH OF STREETV - REFER TO + 2.78 1:40 V SLOT DRAIN V Gate 5.49 + 3.38 LIGHTING PLANS FL DIANE +2.28 2.28 2 ACLAI PERSONAL VACANT -0.14 IL TRAINING HALLAHAN EXISTING PAVEMENT -0.93 FAMILY CARERS SPEEDO INKOHOLICS RUKHI BROWS SOLICITOR HILLBILLY'S ZIGGY'S BAR LILLIE SOCIETY OF ST. DEJA VU IRELAND PIZZA & KEBAB TATTOO STUDIO HAIR DESIGN BY JULIE C 5.40 B -0.15 VINCENT DE PAUL C 1:14 WLVL TELESCOPIC -0.16 F BOLLARDS A1 5.83 2.50 + BY OTHERS A2 A1 + 3.34 SOFF 7.03 1:80 6.65 AN SPAILPIN 2 FANAC FUTURE EVENTS Steps GET TECH + 3.37 TOW 2 + 3.60 FORDE'S +6.06 FUNERAL HOME + 3.60CENTRE ACCESS BRIDGE + 3.33 PARKING Gate FLUSH IN-GROUND LED LIGHTS PLAQUE & CONTRAST PLAQUE COLOUR PAVING TO PAVING COLOUR 2.68 HISTORIC LANE INSET BRONZE INSET B1 LA DOLCE RELOCATED FUNERAL 1:50 CRAWFORD HOME ENTRANCE 0.8m TIRAMISU VITA 3.51 + BUSINESS CENTRE F 4.5 E 2.7m 1.5m 3.5m 3m OVERHEAD UTILITIES TO G PROPOSED + 3.26 BE BURIED AND POLES RETAINING TO BE REMOVED WALL AROUND Pole EXISTING TELEPHONE BUILDING/YARD 3.14 + BOX TO BE REMOVED 3.17 3.58 + BEVELED KERB AT CYCLE PEDESTRIAN CROSSING 2 CORK ENGLISH LANE TO ALLOW FOR 1:20 HEARSE EXIT WORLD + 3.24 + 3.10 + 3.48 8 LEGEND 3.53 + ESTIMATED CULVERT + 3.38 LOCATION BELOW 3.55 + 3.50 + SURFACE 3.55 + Proposed Street Tree - Fastigiate habit 2.2m + 3.24 3.82 + Xx3.75 + Paving Type D Paving Type L TACTILE PAVING Proposed Raised Access Pedestrian Crossing K2 Cb Red Granite - TBC to match Bishop Lucey Par 1.5m 600 x 450-900mm varied lengths, blue grey limestone, bush hammered (TBC) 2.6m Existing Tree to be removed k Red Blister at controlled crossing + 3.18 Stone Seatwall 200x133x65mm clay bricks K2 EXISTING FOOTPATH 3.37Paving Type E Paving Type M 1.5m Existing Kerb Line 3m Typical granite aggregate paving Permeable Resin Bound aggregate Bench/Individual Seat Blue BlisterPROBY'S at uncontrolled QUAY crossing E EXISTING CONTRA-FLOW CYCLE TRACK 200x133x65mm clay bricks 2m HARDSCAPE: 2 Paving Type F 2m Cafe Tables & Chairs PAVING Alternating Dark and Light granite pavers at controlled Crossing KERBS 1 Corduroy Hazard at uncontrolled crossing Cb 3m 2m Proposed Bollard and retention socket EXISTING STREET Paving Type A - Dark Granite Cb CARRIAGEWAY K1: Dark Stone Kerb 200x100x65mm clay bricks Paving Type G + 3.12 + 3.14 + 3.18 COACH + 3.26 + 3.15 A1: Picked Finish, 150COACH x 150 x 150mm paving K1 COACH Standard Cycle Lane - Red chip asphalt 300x300x914mm dark granite, picked finish Existing Light Column to be removed 2.6m A2: Flamed Finish, 150 x 150 x 150mm paving Cycleway controlled slabs A3: Picked Finish, 150 x 150 x 100mm paving at building threshold Paving+ 3.38 Type H K2: Flush Kerb - Stone Banding 400x400x50mm precast concrete tactile flags 4 K2 Proposed Light Column location Cb 2.2m A4: Picked Finish, 150 x 150 x 150mm paving at Historic Laneway with artwork Standard chip asphalt HELM 300x300x914mm dark granite, picked finish EXISTING FOOTPATH A5: Granite Cobbles, 100 x 100 x 100mm setts at building access and Hanover St. GLOBAL D. FORDE GROUP Proposed push button crossing signal + 3.42 SITE FEATURES/FURNISHINGS: & SON'S + 3.79 Paving Type I K3: Chamfered Stone Kerb at Cycle Lane A4 K3 Paving Type B - Light Granite Street print Asphalt/Concrete 300x300x914mm dark granite with chamfered edge, picked finish Planting Area Proposed slot drain location B1: Picked Finish, 150 x 150 x 150mm paving B2: Flamed Finish, 150 x 150 x 150mm paving Paving Type J K4: Light Stone Kerb RELOCATED K4 Proposed SUDS Tree Pit System with Tree Grille Proposed cycle stand location INFORMATION 100 x 100 x 100mm, blue grey limestone setts, fan-tail pattern (TBC 200x200x914mm light granite, picked finish SIGNAGE Ls ) Paving Type C + 3.71 Planter Box Relocated bike share terminal C1: 600 x 300 x 80mm granite paving Paving Type K K5: Standard Kerb Standard PC/Cast in Situ Kerb *Mood images shown are meant to reflect the character C2: 100 x 100 x 100mm3 granite sett at driving apron 100 x 100 x 100mm porphyry fan-tail paving (TBC) Proposed Raised Access Pedestrian Crossing of the site and may not depict exact features COPYRIGHT © ALL RIGHTS RESERVED. Notes KEYSER'S HILL THIS WORK IS COPYRIGHT AND CANNOT BE REPRODUCED OR COPIED IN ANY FORM WITHOUT THE WRITTEN Project Project No. PERMISSION OF THE ORIGINATOR. DO NOT SCALE FROM THIS DRAWING. WORK ONLY FROM FIGURED DIMENSIONS. North BEAMISH & CRAWFORD QUARTER THIS DRAWING TO BE READ IN CONJUNCTION WITH RELEVANT CONSULTANT'S DRAWINGS. INFRASTRUCTURE 6813 Drg. Drawing No. Rev. + 4.19 SITE PLAN 5.22 + 302 ELIZABETH FORT Scales Status Date 1:200 @ A1 Planning 12/07/2021 Drn. Chd. Passed Ordnance Survey Ireland Licence No AR 0001319 Penrose Wharf Business Centre, Penrose Wharf, Cork [email protected] Description + 4.31 Rev Date Drawn Checked © Ordnance Survey Ireland/Government of Ireland Tel: +353(0) 21 242 5620 www.bradyshipmanmartin.com EG DB EXISTING FOOTPATH/STEPS ST. FINBARR'S STREET FINBARR'S ST. SCALE 1:200 G LEGEND 7.48 + Public Realm Improvements 1 On street parking to remian LEGEND Proposed Street Tree - Fastigiate habit • Provide seatingXx pockets or ‘pocket park’ area for rest and reflection with a Traffic Table - to slow vehicles in Paving Type D Paving Type L TACTILE PAVING Proposed Raised Access Pedestrian Crossing 2 Red Granite - TBC to match Bishop Lucey Par 600 x 450-900mm varied lengths, blue grey limestone, bush hammered (TBC) beautiful protectedExisting Tree to view be removed to St. Fin Barre’s Cathedral k Red Blister at controlled crossing high traffic pedestrian area Stone Seatwall 200x133x65mm clay bricks Existing Kerb Line Paving Type E Paving Type M • Install planters and trees for street greening and a more vibrantTypical granite quality aggregate paving of life Bench/Individual Seat Enhanced plaza at with planters Permeable Resin Bound aggregate Blue Blister at uncontrolled crossing 3 HARDSCAPE: 200x133x65mm clay bricks an seating areas. • Widen narrow footpaths while still allowing for adequate trafficPaving Type flow F at this Cafe Tables & Chairs PAVING Alternating Dark and Light granite pavers at controlled Crossing KERBS busy intersection Corduroy Hazard at uncontrolled crossing Proposed Bollard and retention socket 4 Coach Drop off zone and Paving Type A - Dark Granite Paving Type G K1: Dark Stone Kerb 200x100x65mm clay bricks A1: Picked Finish, 150 x 150 x 150mm paving K1 improved loading bay Standard Cycle Lane - Red chip asphalt 300x300x914mm dark granite, picked finish Existing Light Column to be removed • Install traffic table A2: Flamed at Finish, uncontrolled 150 x 150 x 150mm paving pedestrian crossing to slow vehicles and Cycleway controlled slabs A3: Picked Finish, 150 x 150 x 100mm paving at building threshold Paving Type H K2: Flush Kerb - Stone Banding 400x400x50mm precast concrete tactile flags K2 Proposed Light Column location Proposed Street Tree warn both of A4:the Picked potential Finish, 150 x 150 x 150mm hazard.
Details
-
File Typepdf
-
Upload Time-
-
Content LanguagesEnglish
-
Upload UserAnonymous/Not logged-in
-
File Pages17 Page
-
File Size-