Deploying Powerha Solution with AIX Hyperswap

Deploying Powerha Solution with AIX Hyperswap

Front cover Deploying PowerHA Solution with AIX HyperSwap Uses in-band storage replication management with PowerHA Describes AIX and storage configuration for HyperSwap Shows Active-Active and Active-Standby clusters Octavian Lascu Yuying Feng Bing He Peter YH Lee Bao Jun Qin Theeraphong Thitayanun Marian Tomescu Xu Dong Zhang ibm.com/redbooks Redpaper International Technical Support Organization Deploying PowerHA Solution with AIX HyperSwap September 2014 REDP-4954-00 Note: Before using this information and the product it supports, read the information in “Notices” on page vii. First Edition (September 2014) This edition applies to Version 7, Release 1, Modification 2 of IBM PowerHA Enterprise Edition (product number 5765-H24). © Copyright International Business Machines Corporation 2014. All rights reserved. Note to U.S. Government Users Restricted Rights -- Use, duplication or disclosure restricted by GSA ADP Schedule Contract with IBM Corp. Contents Notices . vii Trademarks . viii Preface . ix Authors. ix Now you can become a published author, too! . .x Comments welcome. xi Stay connected to IBM Redbooks . xi Chapter 1. Introduction to PowerHA HyperSwap with the IBM DS8800. 1 1.1 Overview and short history . 2 1.2 Concepts and objectives . 3 1.2.1 Basic configuration using PowerHA with HyperSwap. 3 1.2.2 Basic workflow of PowerHA with HyperSwap . 4 1.2.3 Typical solution for PowerHA with HyperSwap. 4 1.2.4 The HyperSwap concept. 5 1.3 Terminology and considerations . 7 1.3.1 Planned/unplanned HyperSwap . 7 1.3.2 Out-of-band versus in-band . 8 1.3.3 Consistency Groups . 9 1.3.4 PowerHA cross-site cluster. 9 1.3.5 WAN considerations . 9 1.3.6 Distance considerations . 10 Chapter 2. PowerHA HyperSwap cluster planning. 11 2.1 Introduction . 12 2.2 HyperSwap architecture . 13 2.3 Prerequisites . 15 2.3.1 Hardware . 15 2.3.2 Software requirements . 15 2.4 HyperSwap for database applications. 16 2.5 Testing environment description . 17 2.6 Typical HyperSwap scenarios . 18 2.6.1 Planned HyperSwap behavior details . 19 2.6.2 Unplanned HyperSwap: Primary storage failure. 20 2.6.3 Unplanned HyperSwap: All links to primary storage fail . 21 2.6.4 Unplanned HyperSwap: Site down . 22 2.6.5 Unplanned HyperSwap: Site partition . 22 Chapter 3. PowerHA cluster with AIX HyperSwap Active-Standby for applications using a shared file system . 25 3.1 Cluster description and diagrams . 26 3.2 Installing a new configuration . 28 3.2.1 Identifying the storage. 28 3.2.2 Identifying the systems’ HBA configurations. 30 3.2.3 Zoning configuration . 31 3.2.4 Configuring the storage. 36 3.2.5 Enabling HyperSwap: Storage level . 42 3.2.6 AIX configuration. 43 © Copyright IBM Corp. 2014. All rights reserved. iii 3.2.7 PowerHA cluster configuration . 50 3.2.8 Planned tests: Storage maintenance . 64 3.2.9 Planned tests: Site maintenance . 72 3.3 Migrating PowerHA cluster to HyperSwap enabled storage . 74 3.3.1 Planning the cluster . 75 3.3.2 Identifying the nodes and sites . 75 3.3.3 Identifying and configuring the storage . 75 3.3.4 Enabling HyperSwap in AIX . 75 3.3.5 Reconfiguring the cluster for HyperSwap . 76 3.4 Two-node cluster to four-node cluster with HyperSwap . 83 Chapter 4. PowerHA HyperSwap cluster, Oracle stand-alone database, and ASM . 103 4.1 Cluster description and diagrams . 104 4.2 Storage configuration . 105 4.2.1 LUN and mapping configuration . 106 4.2.2 Zoning configuration . 109 4.2.3 AIX disks information . 110 4.3 Node configuration . 113 4.3.1 AIX disk device driver and HBA attributes . 113 4.3.2 Disk configuration . 115 4.3.3 Time synchronization . 117 4.4 Oracle installation and configuration on cluster nodes . 119 4.4.1 Environment checking and configuration . 119 4.4.2 Installing grid (Oracle Cluster Ready Services) and database software. 123 4.4.3 Create a database instance on PS5n01base . 124 4.4.4 Register the database instance on other nodes . 125 4.4.5 Change the ASM disk group to the spfile . 127 4.4.6 Test the database start-up and shutdown scripts . 128 4.5 PowerHA configuration . 130 4.5.1 Cluster topology . 130 4.5.2 Cluster resources . 133 4.5.3 Resource group configuration. 135 4.6 Test scenarios. 136 4.6.1 Node.

View Full Text

Details

  • File Type
    pdf
  • Upload Time
    -
  • Content Languages
    English
  • Upload User
    Anonymous/Not logged-in
  • File Pages
    220 Page
  • File Size
    -

Download

Channel Download Status
Express Download Enable

Copyright

We respect the copyrights and intellectual property rights of all users. All uploaded documents are either original works of the uploader or authorized works of the rightful owners.

  • Not to be reproduced or distributed without explicit permission.
  • Not used for commercial purposes outside of approved use cases.
  • Not used to infringe on the rights of the original creators.
  • If you believe any content infringes your copyright, please contact us immediately.

Support

For help with questions, suggestions, or problems, please contact us