Land Use and Socio- Economic Impact Assessment Report

Land Use and Socio- Economic Impact Assessment Report

GO Rail Network Electrification Project Final Environmental Project Report Addendum APPENDIX E: Land Use and Socio- Economic Impact Assessment Report GO Rail Network Electrification Addendum Land Use & Socio-Economic Impact Assessment Report 18-Dec-2020 Prepared by: Contract: QBS-2014-IEP-002 Revision 00 Authorization X X Nick Crockford, Morrison Hershfield Amber Saltarelli Author Task Lead X Andrew Gillespie Program Manager REVISION HISTORY Revision No. Date Purpose of Submittal Comments 00 18-Dec-2020 Final Submission to Metrolinx N/A This submission was completed and reviewed in accordance with the Quality Assurance Process for this project. Revision 00 18-Dec-2020 Table of Contents Executive Summary ................................................................................................................................... i 1 Introduction ....................................................................................................................................... 1 1.1 Purpose ......................................................................................................................................... 1 1.2 Project Scope ................................................................................................................................ 2 Hydro One Project Components ......................................................................................... 3 Metrolinx Project Components ............................................................................................ 3 Overhead Contact System (OCS) ................................................................................ 3 Study Area .......................................................................................................................... 4 2 Methodology ..................................................................................................................................... 6 2.1 Report Organization ...................................................................................................................... 7 2.2 Approach ....................................................................................................................................... 7 Review of Background Information ..................................................................................... 7 Gap Analysis ...................................................................................................................... 8 3 Land Use Impact Assessment ........................................................................................................ 11 3.1 Footprint Impacts – Union Station Rail Corridor ........................................................................... 11 OCS: Section USRC 1 – UP Express Union Station to Don Yard Layover ........................ 11 3.2 Footprint Impacts – Lakeshore West Corridor ............................................................................. 11 OCS: Section LSW-1 – West of Bathurst Street (Mile 1.20) to Mimico Station .................. 11 OCS: Section LSW-2 – Mimico Station to Long Branch Station ........................................ 11 Potential Effects and Mitigation Measures ................................................................. 11 OCS: Section LSW-3 – Long Branch Station to Port Credit Station................................... 11 OCS: Section LSW-4 – Port Credit Station to Clarkson Station ......................................... 11 OCS: Section LSW-5 – Clarkson Station to Oakville Station ............................................. 11 OCS: Section LSW-6 – Oakville Station to Bronte Station ................................................ 11 OCS: Section LSW-7 – Bronte Station to Appleby Station ................................................ 11 OCS/New Layover Facility – Walkers Line Layover: Section LSW-8 – Appleby Station to Burlington Station (MP 31.5) ........................................................................................................... 12 Potential Effects and Mitigation Measures ................................................................. 12 3.3 Footprint Impacts – Kitchener Corridor ........................................................................................ 12 OCS: Section KT-1 – Up Express Spur (At Highway 427) to Malton Station ..................... 12 Potential Effects and Mitigation Measures ................................................................. 12 OCS: Section KT-2 – Malton Station to Bramalea Station ................................................. 12 Potential Effects and Mitigation Measures ................................................................. 12 3.4 Footprint Impacts – Barrie Corridor ............................................................................................. 13 i Revision 00 18-Dec-2020 TABLE OF CONTENTS CONTINUED OCS: Section BR-1 – Parkdale Junction to Caledonia Station .......................................... 13 OCS: Section BR-2 – Caledonia Station to Downsview Park Station ................................ 13 OCS: Section BR-3 – Downsview Park Station to Rutherford Station ............................... 13 Potential Effects and Mitigation Measures ................................................................. 13 OCS: Section BR-4 – Rutherford Station to King City Station ........................................... 13 OCS: Section BR-5 – King City Station to Bathurst Street ................................................ 13 OCS: Section BR-6 – Bathurst Street to Aurora Station .................................................... 13 Potential Effects and Mitigation Measures ................................................................. 13 OCS: Section BR-7 – Aurora Station to East Gwillimbury Station ..................................... 14 Potential Effects and Mitigation Measures ................................................................. 14 OCS: Section BR-8 – East Gwillimbury Station to Bradford Station .................................. 14 OCS: Section BR-9 – Bradford Station to 13th Line ........................................................... 14 OCS: Section BR-10 – 13th Line to 6th Line Section .......................................................... 14 OCS: Section BR-11 – 6th Line Section to Barrie South Station ........................................ 14 OCS: Section BR-12 – Barrie South Station to Allandale Waterfront Station ..................... 14 Potential Effects and Mitigation Measures ................................................................. 14 3.5 Footprint Impacts – Stouffville Corridor ........................................................................................ 14 OCS: Section SV-1 – Scarborough Junction to Agincourt Station ..................................... 14 OCS: Section SV-2 – Agincourt Station to Milliken Station ................................................ 15 OCS: Section SV-3 – Milliken Station to Unionville Station ............................................... 15 Potential Effects and Mitigation Measures ................................................................. 15 OCS/New Storage Facility – Unionville Storage Yard: Section SV-4 – Unionville Station to Markham Station ............................................................................................................................. 15 Potential Effects and Mitigation Measures ................................................................. 15 OCS: Section SV-5 – Markham Station to Mount Joy Station ........................................... 16 Potential Effects and Mitigation Measures ................................................................. 16 OCS: Section SV-6 – Mount Joy Station to Stouffville Station ........................................... 16 OCS: Section SV-7 – Stouffville Station to Lincolnville Station .......................................... 17 3.6 Footprint Impacts – Lakeshore East Corridor .............................................................................. 17 OCS: Section LSE-1 – Don Yard Layover to Danforth Station .......................................... 17 OCS: Section LSE-2 – Danforth Station to Scarborough Station ....................................... 17 OCS: Section LSE-3 – Scarborough Station to Guildwood Station ................................... 17 OCS: Section LSE-4 – Guildwood Station to Rouge Hill Station ....................................... 17 OCS: Section LSE-5 – Rouge Hill Station to Pickering Station .......................................... 17 OCS: Section LSE-6 – Pickering Station to Ajax Station ................................................... 17 OCS: Section LSE-7 – Ajax Station to Whitby Station ....................................................... 17 OCS: Section LSE-8 – Whitby Station to Oshawa Station ................................................. 17 ii Revision 00 18-Dec-2020 TABLE OF CONTENTS CONTINUED Potential Effects and Mitigation Measures ................................................................. 17 3.7 Operations and Maintenance Impacts ......................................................................................... 18 3.8 Construction Impacts ................................................................................................................... 18 4 Socio-Economic Impact Assessment .............................................................................................. 19 4.1 Provincial and Regional Planning Effects ...................................................................................

View Full Text

Details

  • File Type
    pdf
  • Upload Time
    -
  • Content Languages
    English
  • Upload User
    Anonymous/Not logged-in
  • File Pages
    84 Page
  • File Size
    -

Download

Channel Download Status
Express Download Enable

Copyright

We respect the copyrights and intellectual property rights of all users. All uploaded documents are either original works of the uploader or authorized works of the rightful owners.

  • Not to be reproduced or distributed without explicit permission.
  • Not used for commercial purposes outside of approved use cases.
  • Not used to infringe on the rights of the original creators.
  • If you believe any content infringes your copyright, please contact us immediately.

Support

For help with questions, suggestions, or problems, please contact us