Major Rehabilitation Evaluation Report (MRER)

Major Rehabilitation Evaluation Report (MRER)

Major Rehabilitation Evaluation Report And Environmental Assessment DRAFT Cape Cod Canal Highway Bridges Bourne, Massachusetts US ARMY CORPS OF ENGINEERS New England District October 2019 This Page Intentionally Left Blank Reverse of Front Cover Front Cover Photograph: Looking Southwest through the Bourne Bridge to the Railroad Bridge at Buzzards Bay Cape Cod Canal Federal Navigation Project Bourne, Massachusetts Draft Major Rehabilitation Evaluation Report Cape Cod Canal Highway Bridges October 2019 This Page Intentionally Left Blank Reverse of Front Title Sheet Cape Cod Canal Highway Bridges Major Rehabilitation Evaluation Study Executive Summary The Major Rehabilitation Evaluation Report (MRER) presents the results of a study examining the relative merits of rehabilitating or replacing the two high-level highway bridges, the Bourne and Sagamore, which cross the Cape Cod Canal, and are part of the Cape Cod Canal Federal Navigation Project (FNP) operated and maintained by the U.S. Army Corps of Engineers (USACE), New England District (NAE). The USACE completes a MRER whenever infrastructure maintenance construction costs are expected to exceed $20 million and take more than two years of construction to complete. The MRER is a four-part evaluation: a structural engineering risk and reliability analysis of the current structures, cost engineering, economic analysis, and environmental evaluation of all feasible alternatives. The MRER is intended only as a means of determining the likely future course of action relative to rehabilitation or replacement. While conceptual plans were developed in order to facilitate the analysis no final determination has been made as to the final location or type of any new Canal crossings. Those would be determined in the next phase of the study and design effort. Project Purpose and History The Cape Cod Canal was constructed to provide coastwise shipping traffic with a more direct and safer route from northern New England ports to other areas on the U.S. eastern seaboard. The Canal allows vessels capable of navigating its 32-foot deep channel to avoid the much longer route around Cape Cod, or the even longer route around the islands and Nantucket Shoals. The Canal was originally constructed by the Boston, Cape Cod, and New York Canal Company (Canal Company) under a Charter issued by the Commonwealth of Massachusetts. The Charter required the Canal Company to build and operate two highway bridges and a railroad bridge over the Canal, which were built as low-level draw spans. Construction began in 1909 and the Canal was opened to marine traffic in 1914 and deepened to Cape Cod Canal Highway Bridges, MA Draft Executive Summary Major Rehabilitation Evaluation Report ES-1 October 2019 25 feet in 1916. The Federal government took control of the Canal during World War I, along with other national transportation infrastructure, and operated the Canal through the 1920s. The Canal was acquired by the Federal Government in 1928, and the USACE immediately began a program to re-establish the 25-foot channel depth. Under the authority of the National Industrial Recovery Act of June 1933 the Public Works Administration authorized the construction of three bridges over the canal, two highway and one railroad, in keeping with the terms of the original state charter. Work began to widen the channel through the land cut, clearing seaward approaches of obstructions, and provide bank stabilization, lighting and other improvements to navigation. The original plans for Canal deepening called for construction of locks, however this was abandoned in favor of a larger sea level canal after severe icing showed that locks would be impractical. Work on the two new highway bridges and the railroad bridge began in December 1933, and the two highway bridges were completed in 1935. The Rivers and Harbors Act of August 30, 1935 authorized the USACE to assume maintenance of the three bridges. The 1935 Act also authorized further deepening and widening of the Canal to 32 feet MLW and 17.4 miles long, approach channels in Buzzards Bay 500 to 700 feet wide, with a bottom width of 540 feet in the land cut. That work was completed in 1940. Since that time the USACE has maintained the Canal, its channels, small boat basins, the railroad bridge and the two highway bridges at Federal expense. The bridge locations are shown in Figure ES-2. The two highway Sagamore bridges are now 84 Bridge years old. Both bridges completed their first program of major rehabilitation in the early 1980s. As the bridges and their components continue to age, the cost of operation and Bourne maintenance and Bridge periodic rehabilitation Federal Lands slowly escalates. Both Shown in Red bridges are now scheduled to undergo Figure 2 their second major Bridge Locations rehabilitation in 2025- 2027 (Sagamore - $185 million) and 2029-2031 (Bourne - $210 million). These actions are expected to have impacts on transportation on and off the Cape and the Islands. Most passenger and vehicle traffic to the Islands must cross the Canal bridges to access the ferry terminals on the south shore of the Cape. Lengthy lane closures and full bridge closures would be necessary during the 3 to 7 years of major rehabilitation efforts. Closures of the Canal to marine traffic would also be necessary during some bridge work for the superstructure and deck. These closures would Cape Cod Canal Highway Bridges, MA Draft Executive Summary Major Rehabilitation Evaluation Report ES-2 October 2019 result in costs due to traffic delays, congestion and re-routing, in addition to the costs for bridge rehabilitation itself. Further another major rehabilitation of both bridges would be expected in the 2065-2069 timeframe. Given the high cost of major rehabilitation, the impacts expected to result from such actions, and the fact that major rehabilitation would not address the issues with current and anticipated traffic volumes, modern day highway and bridge design standards, and the escalating costs of normal maintenance and repairs, the USACE is conducting this MRER. The MRER will examine Major Rehabilitation and alternatives for constructing new Canal crossings. Rehabilitation and the alternatives will be measured against a common Base Condition of continued maintenance and repair of the bridges without major rehabilitation to determine the most cost-effective, safe and reliable means of providing vehicular crossing of the Canal. The location of the Canal and its sea routes are shown in Figure ES-1. The Report The documents provided include this MRER, and an accompanying Environmental Assessment (EA), necessary to make a risk informed decision, and several appendices providing greater detail on certain topics. A number of additional technical supporting documents (TSD), while not a part of the report, are included in the record as reference material. All studies and reports were prepared to the level of analysis required for identifying and evaluating conceptual alternatives with the goal of determining whether major rehabilitation or bridge replacement would provide the most cost effective, safe, efficient, and reliable means of providing long-term vehicular crossings of the Canal. Sponsor and Jurisdiction There is no non-Federal sponsor for the Cape Cod Canal Federal Navigation Project as a whole or for the two highway bridges. The Canal and its appurtenant features were purchased from a private corporation by the Federal government. The modified deep draft portions of the present Canal, the bridges and appurtenant structures were constructed at full Federal expense without any non-Federal cost-sharing or partnership/cooperation agreements. Federal ownership of the two existing highway bridges covers the area between the shoreward abutments of both bridges as shown in Figure ES-3. Landward of the bridge abutments the Commonwealth (MassDOT) is the land owner and operates and maintains the highway approaches to the bridges. Figure ES-3 Cape Cod Canal Highway Bridges, MA Draft Executive Summary Major Rehabilitation Evaluation Report ES-3 October 2019 Alternatives The future of the Canal highway bridges has been the subject of public debate for several decades with a variety of solutions proposed at public meetings and in the press. Beyond the Base Condition limited to continued maintenance and repair of the bridges as needs arise, a number of alternatives were initially examined and screened to yield a final set of plans for detailed analysis. The state and many local stakeholders have sought replacement of the bridges with more modern spans designed in accordance with current highway bridge standards for several decades. With a series of major maintenance and rehabilitation actions projected as necessary in the next ten years to assure safety and performance of the bridges it was decided to examine longer term bridge performance, benefits, costs, and impacts in the context of continued rehabilitation v. replacement. USACE regulation and policy require such projects be evaluated over a 50 year period of analysis. Major rehabilitation of both bridges followed by additional maintenance, repair, and the next rehabilitation cycle was examined as an alternative. Additionally various methods for new crossings included new bridges, tunnels, causeways, low level v. high level bridges, and closure of the Canal and restoration of the pre-Canal road system. A list of these initial alternatives is provided below. Table ES-1 – List of Alternatives Description Special Considerations Base Continued Maintenance

View Full Text

Details

  • File Type
    pdf
  • Upload Time
    -
  • Content Languages
    English
  • Upload User
    Anonymous/Not logged-in
  • File Pages
    178 Page
  • File Size
    -

Download

Channel Download Status
Express Download Enable

Copyright

We respect the copyrights and intellectual property rights of all users. All uploaded documents are either original works of the uploader or authorized works of the rightful owners.

  • Not to be reproduced or distributed without explicit permission.
  • Not used for commercial purposes outside of approved use cases.
  • Not used to infringe on the rights of the original creators.
  • If you believe any content infringes your copyright, please contact us immediately.

Support

For help with questions, suggestions, or problems, please contact us