Habitat Conservation Plan (NCCP/HCP)

Habitat Conservation Plan (NCCP/HCP)

San Diego County Water Authority Subregional Natural Community Conservation Plan/ Habitat Conservation Plan (NCCP/HCP) 2018 ANNUAL REPORT Prepared April 2019 SAN DIEGO COUNTY WATER AUTHORITY SUBREGIONAL NATURAL COMMUNITY CONSERVATION PLAN/ HABITAT CONSERVATION PLAN (NCCP/HCP) 2018 ANNUAL REPORT Prepared for: U.S. Fish and Wildlife Service and California Department of Fish and Wildlife Prepared by: San Diego County Water Authority and AECOM April 2019 TABLE OF CONTENTS Section Page ACRONYMS AND DEFINITIONS .............................................................................................. v CHAPTER 1.0 – INTRODUCTION .............................................................................................. 1 1.1 NCCP/HCP Background ......................................................................................... 1 1.1.1 Elements of the Plan and Implementing Agreement ...................................2 1.1.2 Plan Area Monitoring and Reporting ...........................................................3 1.2 Previous Revisions and Amendments to the Plan................................................... 5 1.3 Annual Report Summary ........................................................................................ 5 CHAPTER 2.0 – COVERED ACTIVITIES AND COMPLIANCE MONITORING ................... 9 2.1 CIP Covered Activities ........................................................................................... 9 2.1.1 Completed CIP Covered Activities ............................................................14 2.1.2 Ongoing CIP Covered Activities ...............................................................29 2.1.3 CIP Covered Activities Initiated during Reporting Period ........................29 2.2 Operation and Maintenance Covered Activities ................................................... 33 2.2.1 North County Distribution Pipeline Cathodic Protection (Q0206) ...........35 2.2.2 March 2018 Draindown (N0521/Q0207) ...................................................35 2.2.3 Tri-Agency Pipeline Blowoff Structure (Q0212) ......................................36 2.2.4 August 2018 Draindown (N0521) .............................................................36 2.2.5 ROW Tree Trimming and Removal ..........................................................36 2.3 Near-Term Planned Covered Activities and Other CIP Projects .......................... 36 2.3.1 Northern First Aqueduct Structures and Lining Rehabilitation (Q0204) ......................................................................................................38 2.3.2 Hauck Mesa Storage Tank Replacement (N0504) .....................................39 2.3.3 Mission Trails Flow Regulatory System II (C0603) (Existing Project) .......................................................................................................39 2.3.4 Emergency Water Storage Project North County Pump Stations and Associated Improvements (G1801, G1803, and G1804) (Existing Projects) ......................................................................................40 2.3.5 Future Planned CIP Covered Activities .....................................................40 CHAPTER 3.0 – MITIGATION AND EFFECTIVENESS/VALIDATION MONITORING ................................................................................................................. 43 3.1 Crestridge HMA.................................................................................................... 47 3.1.1 PAMP Development and Objectives .........................................................52 3.1.2 Management and Monitoring Activities ....................................................52 San Diego County Water Authority 2018 NCCP/HCP Annual Report Page i NCCP_Rpt_2018_65013.docx 4/5/2019 3.2 Rancho Cañada HMA ........................................................................................... 53 3.2.1 PAMP Development and Objectives .........................................................54 3.2.2 Management and Monitoring Activities ....................................................55 3.3 San Miguel HMA (Conservation Bank) ............................................................... 55 3.3.1 PAMP Development and Objectives .........................................................56 3.3.2 Management and Monitoring Activities ....................................................56 3.4 Manchester HMA.................................................................................................. 57 3.5 San Luis Rey River HMA ..................................................................................... 57 3.6 Tijuana River Valley HMA .................................................................................. 58 3.7 Funding ................................................................................................................. 58 CHAPTER 4.0 – PLAN UPDATES ............................................................................................. 61 4.1 General Plan Implementation Updates ................................................................. 61 4.2 Current Year Revisions and Amendments to the Plan ......................................... 62 4.3 Changed Circumstances ........................................................................................ 62 4.4 Unforeseen Circumstances.................................................................................... 62 4.5 Agency coordination and Clarifications ............................................................... 62 4.6 Funding Updates ................................................................................................... 63 CHAPTER 5.0 – COMPLIANCE WITH PREEXISTING BIOLOGICAL OPINIONS ............. 65 5.1 Emergency Water Storage Project (B.O. 1-6-97-F-13) ........................................ 65 5.2 Flow Regulatory Structure and Pipeline Tunnel at Mission Trails (B.O. 2007-B-14/2007-F-22) .......................................................................................... 66 5.3 Carryover Storage Project (B.O. 2008B0061-2008F0732) .................................. 67 CHAPTER 6.0 – REFERENCES ................................................................................................. 69 Page ii San Diego County Water Authority 2018 NCCP/HCP Annual Report NCCP_Rpt_2018_65013.docx 4/5/2019 APPENDICES A HMA Credit Ledger Sheets B Summary of Previous NCCP/HCP Revisions, Amendments, and Clarifications C Impacts to Covered Wildlife Species Resulting from CIP Covered Activities D Impacts to Covered Plant Species Resulting from CIP Covered Activities E Measures Implemented for Capital Improvement Program (CIP) Covered Activities F Measures Implemented for Operation and Maintenance (O&M) Covered Activities G Vegetation Communities / Land Cover Types and Tier Levels H Covered Species Status by HMA LIST OF FIGURES Figure Page 2-1 Location of Covered Activities ..........................................................................................11 3-1 Location of Habitat Management Areas (HMAs) and Mitigation Management Areas (MMAs) ...................................................................................................................44 San Diego County Water Authority 2018 NCCP/HCP Annual Report Page iii NCCP_Rpt_2018_65013.docx 4/5/2019 LIST OF TABLES Table Page 1-1 Summary of Vegetation Community/Land Cover Impacts – CIP and O&M Covered Activities ...............................................................................................................6 2-1 CIP Covered Activities – Active Construction Phase January 1 through December 31, 2018 ............................................................................................................10 2-2 Summary of Projected Impacts and Mitigation Requirements for CIP Covered Activities Initiated during Reporting Period ......................................................................13 2-3 Pipeline 3 Relining Project Lake Murray to Sweetwater Reservoir Vegetation Community/Land Cover As-Built Impacts ........................................................................17 2-4 Pipeline 3 Relining Project Lake Murray to Sweetwater Reservoir Off-site Mitigation ...........................................................................................................................18 2-5 Helix 2 FCF Decommissioning and Repurposing Project Vegetation Community/Land Cover As-Built Impacts ........................................................................19 2-6 Helix 2 FCF Demolition and Repurposing Project Off-site Mitigation ............................20 2-7 Moosa Canyon Erosion Control Project Vegetation Community/Land Cover As-Built Impacts ................................................................................................................24 2-8 Moosa Canyon Erosion Control Project Jurisdictional Waters of the U.S. and State As-Built Impacts .......................................................................................................25 2-9 Moosa Canyon Erosion Control Project Jurisdictional Wetlands/Riparian Impacts Permit Comparison ............................................................................................................26 2-10 Moosa Canyon Erosion Control Project Off-site Mitigation .............................................28 2-11 Pipeline 5 Relining from Delivery Point to Sage Road Projected Impact Summary ........31 2-12 O&M Covered Activities Implemented January 1 through December 31, 2018 ..............33 2-13

View Full Text

Details

  • File Type
    pdf
  • Upload Time
    -
  • Content Languages
    English
  • Upload User
    Anonymous/Not logged-in
  • File Pages
    120 Page
  • File Size
    -

Download

Channel Download Status
Express Download Enable

Copyright

We respect the copyrights and intellectual property rights of all users. All uploaded documents are either original works of the uploader or authorized works of the rightful owners.

  • Not to be reproduced or distributed without explicit permission.
  • Not used for commercial purposes outside of approved use cases.
  • Not used to infringe on the rights of the original creators.
  • If you believe any content infringes your copyright, please contact us immediately.

Support

For help with questions, suggestions, or problems, please contact us