Western Cape Library Service

Western Cape Library Service

WESTERN CAPE LIBRARY SERVICE LIASA 2019 CONDITIONAL GRANT OVERVIEW: 2018/19 PIETER HUGO 2 OCTOBER 2019 OVERVIEW OF 2018/19 • WC spent the total grant of R176 624 000 No underspending No rollover • WC Library Service supports 376 libraries with funding, library material, free internet, training and supporting services. OVERVIEW OF 2018/19 (2) • Progress with addressing the underfunded mandate: o The 15 B3 municipalities: 97% funded (CG and WC specific MRF) o All 24 B municipalities: 75% funded (CG and MRF) o All 25 municipalities (Metro included): 29% funded (CG and WC specific MRF and MLG) CG ALLOCATION 2018/19 Total CG WC allocation for 2018/19: R176 624 000 Total transfers to 25 municipalities = 95% of the provincial allocation (R167 631 000) for municipal library staff, building/upgrading of library facilities, furniture & equipment and library operational costs. Centrally managed projects: establishment of Mini Libraries for the Blind, purchasing of library material, internet services and Grant management – (R9.9million, 5%, balance of the funding). FINANCIAL BREAKDOWN OF THE ALLOCATION ALLOCATION PER PROJECT: • R146 730 000: Staff (municipal)appointed with conditional grant funding in public libraries (83% of total grant) • R15.5 million: New library facilities established and libraries upgraded (9% of total grant) • R2.7 million: Library material bought for libraries FINANCIAL BREAKDOWN OF THE ALLOCATION (2) • R6.3 million: Grant Management, including consultations with municipalities (3.6% of total grant) • R4.5 million: Operational costs for libraries, transferred to municipalities • R900 000: Mini libraries for the Blind 2018/19 OUTPUTS AND ACHIEVEMENTS • New libraries completed: Du Noon(City of Cape Town Municipality) Groendal(Stellenbosch Municipality) • New library projects in progress: Groenheuwel (Drakenstein Municipality) Khayalethu (Knysna Municipality) Rose Valley (Oudtshoorn Municipality) Swellendam (Swellendam Municipality) Brandwag Modular (Kannaland Muns) Elim Modular (Cape Agulhas Muns) Koekenaap Modular (Matzikama Muns) 2018/19 OUTPUTS AND ACHIEVEMENTS (2) • Library upgrade projects completed: Hawston (Overstrand Municipality) • Library upgrade projects in progress: Waterloo (Breede Valley Municipality) Bergsig (Kannaland Municipality) Noordhoek (Bergrivier Municipality) Harald Krumm (Saldanha Municipality) Grabouw (Theewaterskloof Municipality) Gansbaai (Overstrand Municipality) Eluxolweni (Overstrand Municipality) DU NOON LIBRARY – CITY OF CAPE TOWN MUNICIPALITY DU NOON LIBRARY- CAPE TOWN MUNICIPALITY KHAYALETHU LIBRARY– KNYSNA MUNICIPALITY GROENHEUWEL LIBRARY- DRAKENSTEIN MUNICIPALITY KOEKENAAP LIBRARY- MATZIKAMA MUNICIPALITY KOEKENAAP LIBRARY- MATZIKAMA MUNICIPALITY ELIM LIBRARY- CAPE AGULHAS MUNICIPALITY GANSBAAI LIBRARY & ELUXOLWENI UPGRADES- OVERSTRAND MUNICIPALITY WATERLOO (WORCESTER): BREEDE VALLEY MUNICIPALITY WATERLOO (WORCESTER): BREEDE VALLEY MUNICIPALITY 2018/19 OUTPUTS AND ACHIEVEMENTS (3) • Funded 670 library posts in public libraries. • Rural ICT extended with 3 new libraries to total of 226 libraries already connected. • 15 274 items of library material procured with CG funds. • 22 mini libraries for the blind already established. • 80 monitoring visits to municipalities to ensure efficient grant spending. • 2 new libraries built • 1 library upgraded SALB: 5 New mini libraries in Western Cape 1. Idas Valley 2. Stellenbosch 3. Genadendal 4. Tesselaarsdal 5. Hopefield South African Library for the Blind for 2018/2019 Idas Valley Library South African Library for the Blind for 2018/2019 Stellenbosch Library South African Library for the Blind for 2018/2019 Genadendal Library South African Library for the Blind for 2018/2019 Tesselaarsdal Library South African Library for the Blind Hopefield Library SUMMARY • CG provides a huge contribution towards keeping the WC’s extensive network of libraries effective, assisting in addressing the underfunded mandate and building and upgrading of libraries. • The library network is ever expanding, but not keeping up with the rapidly growing Western Cape population. SUMMARY (2) • Funding (national and provincial) is not keeping up with inflation, much less progressing towards full funding. • Increasing budget constraints necessitate reprioritising towards keeping the current network of 376 libraries effectively operational with staff, books and services. Thank You.

View Full Text

Details

  • File Type
    pdf
  • Upload Time
    -
  • Content Languages
    English
  • Upload User
    Anonymous/Not logged-in
  • File Pages
    29 Page
  • File Size
    -

Download

Channel Download Status
Express Download Enable

Copyright

We respect the copyrights and intellectual property rights of all users. All uploaded documents are either original works of the uploader or authorized works of the rightful owners.

  • Not to be reproduced or distributed without explicit permission.
  • Not used for commercial purposes outside of approved use cases.
  • Not used to infringe on the rights of the original creators.
  • If you believe any content infringes your copyright, please contact us immediately.

Support

For help with questions, suggestions, or problems, please contact us