Queensland Road Safety Program—Tranche 1

Queensland Road Safety Program—Tranche 1

Queensland Road Safety Program – Tranche 1 Project List Queensland Road Safety Program Tranche 1 Road Start End District Indicative Project Name Scope Description Indicative Number Chainage Chainage Cost ($M) Upgrades for flag and route lighting at seven intersections: Hibiscus Maryborough-Hervey Bay Road, seven locations: Wide Bay/Burnett Road, Janet Road, Churchill Mine Road, Prawle Road, Noble Road, 163 12.02 33.00 Tranche 1 1.10 Intersection lighting upgrades Stockman Way and Chapel Road. Maryborough-Hervey Bay Road (Boat Harbour Wide Bay/Burnett Drive)/Denmans Camp Road intersection: Pedestrian Install a mid-block pedestrian refuge. 163 41.04 41.10 Tranche 1 0.24 improvements Safety works – widening shoulder to allow traffic to pass right turning Goodwood Road, three locations in Bundaberg: Basic Right Wide Bay/Burnett vehicles, treatment of hazards and Audio Tactile Line Markings 171 27.25 27.65 Tranche 1 1.27 Turn Treatment (BAR) widening (ATLM). Bundaberg-Bargara Road and Bunda Street intersection: Upgrade signalised intersection to remove through and right turning Wide Bay/Burnett 174 4.07 Tranche 1 0.11 Remove right turn filtering at intersection traffic movement conflict. Bundaberg-Port Road and Pyefinch Boulevard and Faldt Upgrade signalised intersection to remove through and right turning Wide Bay/Burnett 175 1.66 Tranche 1 0.11 Street: Remove right turn filtering at intersection traffic movement conflict. Bundaberg-Miriam Vale Road: Creation of traversable Creation of traversable roadsides through earthworks to flatten Wide Bay/Burnett roadsides through earthworks, extension of minor culverts, batters, extension of narrow culverts, removal of large hazards and 179 3.20 46.46 Tranche 1 1.43 clear zone clearing and installation of guardrail installation of guardrail. Bundaberg-Miriam Vale Road, Monduran Road and Upgrade existing four way sign controlled intersection to a staggered Wide Bay/Burnett 179 25.74 26.13 Tranche 1 1.21 Yandaran Road: Intersection upgrade T-Intersection. Upgrade existing culvert where traffic is constrained to one lane to Wondai-Proston Road: Upgrade existing culvert (25442 Wide Bay/Burnett provide two lane operation consistent with remaining road section 436 12.09 12.10 Tranche 1 1.65 3/2100x2100 RCC) and mitigate interactions between Heavy Vehicles and tourists. Widen existing narrow seal width to achieve a 9m wide sealed Wide Bay/Burnett Booral Road: Widen shoulders, hazard removal, and ATLM 1632 2.00 3.20 Tranche 1 1.02 surface to address head-on risk. Moore Park Road, Bundaberg: Creation of traversable Creation of traversable roadsides through earthworks to flatten Wide Bay/Burnett roadsides through earthworks, extension of minor culverts, batters, extension of narrow culverts, removal of large hazards and 1761 10.00 11.00 Tranche 1 2.09 clear zone clearing and installation of guardrail installation of guardrail. Upgrade signalised intersection to remove through and right turning Isis Highway and Enterprise Street intersection: Upgrade traffic movement conflict and improve pedestrian safety by Wide Bay/Burnett 19A 4.24 Tranche 1 0.11 intersection implementing one of three slip lane options: removal, signalise or install wombat crossing on slip lanes. Upgrade guardrail approaches to concrete bridge to meet current Wide Bay/Burnett Isis Highway, Degilbo Creek: Guardrail upgrades 19B 42.75 42.82 Tranche 1 0.44 standards and install end treatments. D'Aguilar Highway and Burnett Highway and Drayton Street: Upgrade signalised intersection to remove through and right turning Wide Bay/Burnett 40C 20.88 Tranche 1 0.11 Upgrade intersection traffic movement conflict. Burnett Highway (Nanango – Goomeri): Creation of Creation of traversable roadsides through earthworks to flatten traversable roadsides through earthworks, extension of Wide Bay/Burnett batters, extension of narrow culverts, removal of large hazards and 41A 0.00 59.74 Tranche 1 1.98 minor culverts, clear zone clearing and installation of installation of guardrail. guardrail Burnett Highway (Goomeri – Gayndah): Creation of Creation of traversable roadsides through earthworks to flatten traversable roadsides through earthworks, extension of Wide Bay/Burnett batters, extension of narrow culverts, removal of large hazards and 41B 0.00 100.66 Tranche 1 3.30 minor culverts, clear zone clearing and installation of installation of guardrail. guardrail Queensland Road Safety Program Tranche 1 Road Start End District Indicative Project Name Scope Description Indicative Number Chainage Chainage Cost ($M) Warrego Highway, Blyth Creek: Curve widen and safer Widen seal width through curve, correct surface to reinstate South West 18D 123.80 124.80 Tranche 1 0.55 roadsides superelevation, line marking, ATLM and safety signage. Upgrade guardrail on narrow bridge approach including installation Carnarvon Highway, Moonie River Bridge: Guardrail and South West of signage, line marking and ATLM to provide/guide safe traffic 24A 74.20 75.17 Tranche 1 0.55 delineation upgrade movements. Scope includes construction of a left turn slip lane on the Carnarvon Highway and acceleration lane on the westbound leg of the Warrego Warrego Highway and Carnarvon Highway: Upgrade South West Highway to improve safety for merging traffic, construct left turn slip 24C 0.00 Tranche 1 8.65 intersection lane on the eastern leg of the Warrego Highway to provide southbound traffic safe turning onto the Carnarvon Highway. Carnarvon Highway and Miscamble Street intersections: Upgrade intersections to provide auxiliary turning lanes, cycle lanes, South West 24D 1.06 1.42 Tranche 1 0.83 Upgrade intersection improved line marking, barrier kerbs and channelisation. Upgrade existing culvert where traffic is constrained to one lane to Carnarvon Highway (Roma to Injune): Upgrade existing South West provide two lane operation consistent with remaining road section 24D Various Tranche 1 1.65 culverts and mitigate interactions between Heavy Vehicles and tourists. Upgrade existing culvert where traffic is constrained to one lane to South West Diamantina Developmental Road: Upgrade existing culverts provide two lane operation consistent with remaining road section 93A 87.95 Tranche 1 1.10 and mitigate interactions between Heavy Vehicles and tourists. Upgrade existing culvert where traffic is constrained to one lane to South West Bulloo Developmental Road: Upgrade existing culverts provide two lane operation consistent with remaining road section 94A 126.36 Tranche 1 1.65 and mitigate interactions between Heavy Vehicles and tourists. Construction of seal widening and barrier installation, flattening of South West Mass Action – Replace sub-standard guardrail – South West Various Tranche 1 0.55 batters and widening of narrow culverts as necessary. Provision of safety signage and line marking to make motorists South West Mass Action – Delineation of road narrowing – South West aware of road narrow sections and mitigate interactions between Various Tranche 1 0.22 Heavy vehicles and tourists. Town Entry Treatments – mass action to reduce speed limits on South West Mass Action – Town Entry Treatments – South West Various Tranche 1 0.66 approach to lower speed environments in South West District. Waterford-Tamborine Road between North Street/Quinzeh Install 1.5m cycle lanes for the entire length along both northbound South Coast 207 10.67 11.34 Tranche 1 0.83 Creek Road and Anzac Avenue: Install cycle lanes and southbound carriageways. Pavement rehabilitation works to reinstate cross fall and Cunningham Highway, Ipswich – Warwick: Improve road South Coast superelevation as required. To be delivered in association with 17B 72.00 73.00 Tranche 1 2.20 surface adjacent road safety project. Ross River Road and Burdekin Street intersection: Install Installation of pedestrian crossing and upgraded pedestrian facilities Northern 612 0.90 1.09 Tranche 1 2.20 pedestrian crossing at existing signalised intersection. Widen existing narrow width to achieve a 8m wide sealed surface to Northern Ayr-Ravenswood Road: Widening (In sections) 5472 10.80 56.50 Tranche 1 0.55 allow safe overtaking opportunities. Bruce Highway (Ayr – Townsville), Alligator Creek Road Northern Construct channelised left turn. 10L 63.90 64.30 Tranche 1 1.65 intersection upgrade Queensland Road Safety Program Tranche 1 Road Start End District Indicative Project Name Scope Description Indicative Number Chainage Chainage Cost ($M) Flinders Highway – Installation of Wide Centre Line Widen shoulders and safer roadsides (WCLT, hazard removal and Northern 14A 23.00 25.74 Tranche 1 8.80 Treatment (WCLT) ATLM). Replace aged/install blue and green guide signage along road to Northern Gregory Developmental Road – Signage Upgrade highlight upcoming stopping bays and facilities to mitigate driver 98B 0.50 189.66 Tranche 1 0.55 fatigue. Upgrade signalised intersection to remove through and right turning Various Traffic Signalised Intersections – Removal of Right traffic movement conflict and improve pedestrian safety by Northern Various Tranche 1 0.55 Turn Filters – Northern District implementing one of three slip lane options: removal, signalise or install wombat crossing on slip lanes. Upgrade to pedestrian crossings to comply with Disability Northern Pedestrian Facilities Upgrade – Northern District Various Tranche 1 0.55 Discrimination Act (DDA) compliance. Mass Action – Open level crossing hazard zone delineation Upgrade warning signage at open level crossings across Northern Northern Various Tranche 1 0.83 – Northern District Queensland to

View Full Text

Details

  • File Type
    pdf
  • Upload Time
    -
  • Content Languages
    English
  • Upload User
    Anonymous/Not logged-in
  • File Pages
    7 Page
  • File Size
    -

Download

Channel Download Status
Express Download Enable

Copyright

We respect the copyrights and intellectual property rights of all users. All uploaded documents are either original works of the uploader or authorized works of the rightful owners.

  • Not to be reproduced or distributed without explicit permission.
  • Not used for commercial purposes outside of approved use cases.
  • Not used to infringe on the rights of the original creators.
  • If you believe any content infringes your copyright, please contact us immediately.

Support

For help with questions, suggestions, or problems, please contact us