1.0 Titlepage Vol 1 4-22-13.Lwp

1.0 Titlepage Vol 1 4-22-13.Lwp

DRAFT SUPPLEMENTAL ENVIRONMENTAL IMPACT STATEMENT Type I Action HIGHGATE-WOODLANDS AT NORTH SALEM Reed Road TOWN OF NORTH SALEM, WESTCHESTER COUNTY, NEW YORK Volume I Tax Lot Numbers Sheet 2, Block 1734, Lots 15, 16, 19 Lead Agency: TOWN OF NORTH SALEM TOWN BOARD Town of North Salem 266 Titicus Road North Salem, New York, 10560 Contact: Veronica Howley, Town Clerk Telephone: (914) 669-5577 Fax: (914) 669-8670 Owner of Subject Property: Project Owner/Applicant: JoFlo of North Salem Box 20720 Cherokee Station New York, NY 10021-0074 (212) 988-8253 Lead Agency Acceptance Date:_April 23, 2013__ SEQR Public Hearing Date:__June 25, 2013____ Deadline for comments to be submitted to Lead Agency__July 25, 2013_ April 22, 2013 Consultants, Organizations, and Individual Contributors to the DSEIS Prepared By: TIM MILLER ASSOCIATES, INC. 10 North Street Cold Spring, New York, 10516 Attention: Jon Dahlgren (845) 265-4400 Fax: (845) 265-4418 email: [email protected] Project Engineer: Keane Coppelman Gregory Engineers, P.C. 113 Smith Avenue Mount Kisco, New York, 10549 Attn: Peter Gregory (914) 241-2235 Fax: (914) 241-6787 email: [email protected] Project Hydrogeologist: SSEC 4 Deer Trail Cornwall, New York, 12518 Attn: Sergio Smiriglio (845) 534-3816 Fax: (886) 334-1883 email: [email protected] Hydrogeologic Engineer: Leggette, Brashears & Graham, Inc. Research Drive, Suite 301 Shelton, CT 06484 Contact: Kenneth Taylor, CPG www.lbgweb.com Tel. (203) 929-8555 Fax. (203) 926-9140 Project Consulting Engineer: Insite Engineering, Surveying & Landscape Architecture, PC 3 Garrett Place Carmel, NY 10512 Contact: Rich Williams, P.E. www.insite-eng.com Tel. (845) 225-9690 Fax. (845) 225-9717 Cultural Resource Consultant: STRATA Cultural Resource Management, LLC P.O. Box 145 Craigmoore, NY 12420 Contact: Jim Turner [email protected] Tel. (845) 647-1390 Highgate-Woodlands at North Salem Draft Supplemental Environmental Impact Statement Town of North Salem, Westchester County, New York Volume I Page 2.1 EXECUTIVE SUMMARY 2-1 3.0 DESCRIPTION OF THE PROPOSED ACTION 3.100 Project Purpose, Need, and Benefits 3.110 History and Background 3-1 3.120 Relationship of the Project to the County and Town Plans and Zoning Objectives 3-3 3.130 Revised Objectives of the Project Sponsors 3-7 3.200 Location 3.210 Geographic Boundaries 3-10 3.220 Description of Site Access 3-11 3.300 Design and Layout 3.310 General Site Description 3-11 3.320 Proposed Uses and Project Site Layout; Area and Setback Design Standards 3-17 3.330 Sewage Treatment 3-22 3.340 Water Supply 3-26 03.350 Structures 3-28 3.360 Roads 3-29 3.370 Parking 3-33 3.380 Other Amenities and Improvements for Highgate-Woodlands Site 3-35 3.400 Construction and Operation 3.410 Construction 3-38 3.420 HOA Operation and Maintenance of Water and Sewer Facilities, Roads, and Open Space 3-41 3.500 Approvals and Permits 3.510 All Approvals Necessary in Order to Begin Site Construction 3-43 Highgate-Woodlands at North Salem DSEIS TOC-1 Table of Contents April 22, 2013 4.0 ENVIRONMENTAL SETTING, IMPACTS AND MITIGATION 4.100 Geology, Soils, and Topography 4.110 Subsurface 4.1-1 4.120 Surface 4.1-2 4.130 Topography 4.1-12 Impacts and Mitigation 4.1-13 4.200 Water Resources 4.210 Groundwater 4.2-1 4.220 Surface Water 4.2-7 Impacts and Mitigation 4.2-11 4.300 Air Resources 4.310 Air Quality 4.3-1 Air Quality Impacts and Mitigation 4.3-5 4.320 Noise Levels 4.3-7 Noise Level Impacts and Mitigation 4.3-8 4.400 Terrestrial and Aquatic Equality 4.410 Vegetation 4.4-1 4.420 Fish and Wildlife 4.4-7 4.430 Wetlands 4.4-20 Impacts and Mitigation 4.4-28 4.500 Transportation 4.510 Existing Conditions 4.5-1 4.520 Future Traffic Volumes 4.5-9 Impacts and Mitigation 4.5-9 4.600 Land Use and Zoning 4.610 Existing Land Use and Zoning 4.6-3 4.620 Conformance with County and Local Land Use Plans 4.6-10 4.630 Development Trends 4.6-23 Impacts and Mitigation 4.6-25 4.700 Demography 4.710 Population Characteristics 4.7-1 Impacts and Mitigation 4.7-2 Highgate-Woodlands at North Salem DSEIS TOC-2 Table of Contents April 22, 2013 4.800 Community Services 4.810 Educational Facilities 4.8-1 4.820 Police Protection 4.8-2 4.830 Fire Protection/Emergency Services 4.8-3 4.840 Utilities 4.8-7 4.841 Water 4.8-7 4.842 Sewer 4.8-8 4.843 Electric, Telephone, and Lighting 4.8-13 4.850 Solid Waste Disposal 4.8-13 4.860 Fiscal Impact Analysis 4.8-14 4.870 Recreational Facilities 4.8-19 4.900 Cultural Resources 4.910 Visual Resources 4.9-1 4.920 Historic Resources 4.9-1 4.930 Community Character 4.9-4 5.0 ADVERSE ENVIRONMENTAL EFFECTS THAT CANNOT BE AVOIDED OR ADEQUATELY MITIGATED IF THE PROJECT IS IMPLEMENTED 5-1 6.0 ALTERNATIVES 6.100 Alternative Design/Layouts 6-3 6.200 Alternative Central Sewage Treatment Connection 6-7 6.300 Alternative Size/Density 6-8 6.400 Alternative Uses 6-10 6.500 Alternative Access 6-15 6.600 Alternative Drainage Plan 6-16 6.700 Alternative Construction Plan 6-16 6.800 Previous Proposed Action 6-18 6.900 All Active Adult 6-18 6.10 No Action 6-19 7.0 IRREVERSIBLE AND IRRETRIEVABLE COMMITMENT OF RESOURCES 7-1 8.0 APPENDICES Appendix 1 SEQR Documentation (includes EAF and Wetlands Application) Appendix 2 Correspondence Appendix 3 Stipulation of Settlement; Amendment #1 to Stipulation Appendix 4 Draft Homeowner Association Agreement Appendix 5 Wastewater Treatment Report/Water Facilities Report Appendix 6 Soil Testing Report Appendix 7 Highgate-Woodlands at North Salem Water Supply Report Appendix 8 Blasting Protocol Appendix 9 The Woodlands Pesticide Soil Sampling Investigation Results Appendix 10 Phase IA/IB and Phase II Cultural Resources Report Highgate-Woodlands at North Salem DSEIS TOC-3 Table of Contents April 22, 2013 Appendix 11 Draft R/AMF-2 Zoning Appendix 12 Traffic Impact Study Appendix 13 Stormwater Pollution Prevention Plan Appendix 14 Septic System Mounding Analysis Appendix 15 Surface Water Sampling Results List of Tables Page Table 2-1: Proposed Parcels in Highgate-Woodlands Development 2.1-4 Table 2-2: Summary of Required Permits and Approvals - Highgate Woodlands 2.1-5 Table 2-3: Summary of Required Permits and Approvals - Moderate Income Housing Property 2.1-6 Table 2-4: Alternative Comparison Chart 2.1-43 Table 3-1: Proposed R-1 (Medium Density Residential) Zoning District Bulk and Area Requirements for Single-Family Detached Dwellings 3-5 Table 3-2: Proposed R-AMF/2 (Residential-Adult Multi-Family/Medium Density Zoning District Bulk and Area Requirements for Multi-Family Dwellings 3-6 Table 3-3: Bulk Requirements for GB - General Business (Use group “o”) 3-7 Table 3-4: Proposed Parcels in Highgate-Woodlands Development 3-9 Table 3.5: Development Impacts -- Highgate-Woodlands 3-15 Table 3.6: Lot Area Calculations Special Bulk Requirements - 250-16A Minimal Lot Area Requirement: 1 Acre 3-19 Table 3-7: Bulk and Area Data for Individual Single Family Lots 3-20 Table 3-8: Effluent Standards 3-23 Table 3-9: Town of North Salem Roadway Standards and Specifications 3-30 Table 3-10: Construction Phasing Plan 3-40 Table 3-11: Annual Budget Estimate Highgate-Woodlands Water Works Corporation 3-42 Table 3-12: Annual Budget Estimate Highgate-Woodlands Sewage Works Corporation 3-43 Table 3-13: Summary of Required Permits and Approvals - Highgate-Woodlands 3-44 Table 3-14: Summary of Required Permits and Approvals - Moderate Income Housing Property 3-46 Table 4.1-1: Soil Acreage 4.1-2 Table 4.1-2: Soil Characteristics 4.1-6 Table 4.1-3: Soil Limitations for Selected Uses 4.1-7 Table 4.1-4: Pesticide Sampling Result 4.1-11 Table 4.1-5: Slope Distribution 4.1-10 Table 4.1-6: Proposed Slope Impacts 4.1-15 Table 4.1-7: Erosion Control Measures 4.1-22 Table 4.2-1: Highgate-Woodlands Well Summary 4.2-2 Table 4.2-2: Highgate-Woodlands Property Soils Recharge Rates 4.2-4 Table 4.2-3: On-site Aquifer Recharge Calculations 4.2-4 Table 4.2-4: Summary of Pre-Development Peak Discharge Rates 4.2-8 Table 4.2-5 Highgate-Woodlands Surface Water Sampling Results 4.2-10 Table 4.2-6 Surface Water Quality Standards 4.2-11 Table 4.2-7: Wastewater Discharge Limitations Prior to Subsurface Discharge 4.2-12 Table 4.2.8: Summary of Post-Development Peak Discharge Rates 4.2-18 Table 4.2-9: Comparison of Pre- and Post-development Peak Discharge Rates 4.2-19 Highgate-Woodlands at North Salem DSEIS TOC-4 Table of Contents April 22, 2013 Table 4.2-10: Summary of Water Quality Volumes 4.2-22 Table 4.3-1: Principal Sources of Community Air Pollutants 4.3-1 Table 4.3-2: Federal and State Air Quality Standards 4.3-3 Table 4.3-3: 2008 Regional Air Quality Summary 4.3-4 Table 4.3-4: Construction Noise Impacts 4.3-10 Table 4.4-1: Upland Vegetative Plots 4.4-3 Table 4.4-2: Successional Northern Hardwood Forest Community Observed On-site 4.4-4 Table 4.4-3: Trees to be Removed 4.4-7 Table 4.4-4: Wildlife Having Potential to Occur On-site 4.4-10 Table 4.4-5: Wetland Summary 4.4-24 Table 4.4-6: Summary of Wetland Functions 4.4-26 Table 4.4-7: Summary of Wetland Impacts and Mitigation 4.4-29 Table 4.4-8: Red Maple Hardwood Swamp Wetland Community Vegetation Observed On-site 4.4-34 Table 4.4-9: Emergent Marsh Wetland Community Vegetation Observed On-site 4.4-37 Table 4.5-1: Unsignalized Intersections Level of Service Criteria 4.5-3 Table 4.5-2: Signalized Intersections Level of Service Criteria 4.5-4 Table 4.5-3: Collision Frequency - Hardscrabble Road and Reed Intersection 4.5-7 Table 4.5-4: Recommended Sight Distance Standards 4.5-8 Table 4.5-5: Traffic Volume Comparisons, 1994 and 2004 4.5-9 Table 4.5-6: Traffic Volume Comparison of Baseline to 2009/2010 Counts 4.5-10 Table 4.5-7: Arrival and Departure Traffic Distribution Projected Trips Generated by the Proposed Project 4.5-11 Table 4.5-8: Baseline Condition Level of Service Summary 4.5-12 Table 4.5-9: No Build Condition Level of Service Summary 4.5-13 Table 4.5-10: Build Condition Level of Service Summary 4.5-14 Table 4.5-11: Build Condition with Improvements Level of Service Summary 4.5-15 Table 4.6-1: Proposed Parcels in Highgate-Woodlands Development 4.6-2 Table 4.6-2: Easements and Rights for the Property Owned by JOFLO of North Salem Inc.

View Full Text

Details

  • File Type
    pdf
  • Upload Time
    -
  • Content Languages
    English
  • Upload User
    Anonymous/Not logged-in
  • File Pages
    317 Page
  • File Size
    -

Download

Channel Download Status
Express Download Enable

Copyright

We respect the copyrights and intellectual property rights of all users. All uploaded documents are either original works of the uploader or authorized works of the rightful owners.

  • Not to be reproduced or distributed without explicit permission.
  • Not used for commercial purposes outside of approved use cases.
  • Not used to infringe on the rights of the original creators.
  • If you believe any content infringes your copyright, please contact us immediately.

Support

For help with questions, suggestions, or problems, please contact us