CHAPTER 4 Waterfronts and Open Spaces

CHAPTER 4 Waterfronts and Open Spaces

CHAPTER 4 Waterfronts and Open Spaces STREET FURNITURE In locations where street and sidewalk widths do not allow for planters or landscaped medians, street furnishings can be used to “green” the streets. Streetlights with banners or planters add color and festivity to the pedestrian experience. Keeping street furniture, such as newspaper stands, orderly and compact helps to increase the amount of space for pedestrian movement, especially on narrow sidewalks. Signage, special paving and other details further enhance the pedestrian experience. Maintaining consistent standards for the design and placement of these furniture elements in the various districts of the Central Area will also help to define their identity. Figure 4.3.47 Hanging planters add greenery and keep sidewalks open Figure 4.3.46 Dearborn Street Figure 4.3.48 Randolph Street Figure 4.3.49 Street signage explains local Lights and landscaping in the Loop Consolidated newspaper rack points of interest Final Report June 2003 DRAFT 104 CHAPTER 4 Waterfronts and Open Spaces Figure 4.3.50 Michigan Avenue, looking south from Roosevelt Road, in 2020. South Michigan Avenue will be a landscaped street connecting the Near South Figure 4.3.51 Michigan Avenue today. district to the Loop. It will be a major pedestrian, bicycle and transit corridor. Final Report CHICAGO CENTRAL AREA PLAN DRAFT June 2003 105 CHAPTER 4 Waterfronts and Open Spaces 10 The Open Space Framework 12 The lakefront, the riverfront, city parks and plazas will be strengthened and expanded. Streets will be landscaped to 28 connect the open spaces and create attractive, healthy Figure 4.3.52 environments. Expressway corridors will be landscaped and The Open Space Framework 8 new civic gateways will be created at key intersections. 11 9 13 30 31 29 50 33 32 16 17 15 14 36 18 34 52 19 3 35 37 1 5 51 39 20 21 38 22 43 40 2 4 25 23 7 42 44 53 24 45 41 6 Existing Open Space 46 Planned Open Space Open Space Vision Vision for Wetlands along River Landscaped Freeways Landscaped Riverbanks 49 Plazas and Riverwalk 47 26 27 48 0 1/4 1/2 1 Mile Final Report June 2003 DRAFT 106 CHAPTER 4 Waterfronts and Open Spaces Summary of Open Space Recommendations Key Lakefront Recommendations Key City Park and Plaza Recommendations 1. Complete Millennium Park. NEAR NORTH 2. Implement the Grant Park master plan to create new active and passive open spaces. 28. Implement plans for Walter Payton Academy Campus Park. 3. Create Wacker Pier and a new public institution or museum. Renovate the Coast Guard Station. 29. Develop new park in the Near Northwest Neighborhood as new residential 4. Continue decking over the railroad in Grant Park to create new open spaces and minimize barriers. development occurs. 5. Expand and complete Monroe Street Harbor. 30. Develop a new park at the Fort Dearborn Post Office site at Dearborn and Ohio Streets. 6. Increase wetland plantings at the perimeter of Meigs Field. 31. Create a new park at the northeast corner of Chicago Avenue and State Street. 7. Create new parkland over the railroad at Central Station. 32. Create Kinzie Park at Kinzie and DesPlaines Streets. 8. Widen the lakefront path from North Avenue beach to Olive Park by 100 feet and create a 33. Develop Kraft Park to serve the Streeterville Neighborhood. new landscaped embankment. 9. Integrate park lands with the Jardine Water Filtration Plant. THE EXPANDED LOOP 34. Create a new park to serve the Lakeshore East neighborhood. 35. Develop Jefferson Plaza at Lake Street and Jefferson Street. Key Chicago River Recommendations 36. Develop new parks over the Hubbard Street Tunnel. 37. Create a new park over the Kennedy Expressway between Monroe and Madison NEAR NORTH Streets to connect the West Loop with Greek Town. 10. Add a new boat house, pedestrian bridge and river edge landscape at the 38. Reconfigure Pritzker Park at State and Van Buren Streets. North Avenue turning basin 39. Create Old St. Pat’s Park at Adams and Des Plaines Streets. 11. Enhance landscaping along the west side of Goose Island 12. Create a new recreational and environmental resource along the east side of Goose Island THE SOUTH LOOP AND NEAR SOUTH 13. Ensure continuous river access through the Montgomery Ward site to connect with parks 40. Complete a new park at Taylor and Wells Streets. at Hobbie and Erie Streets. 41. Complete Mark Twain Park at 15th Place and Indiana Avenue. 14. Create Du Sable Park at the mouth of the Chicago River 42. Complete University Village neighborhood parks 15. Create an active riverwalk with commercial uses along the north side of the Main Branch 43. Complete the Jones High School Campus Park. from the lake to Wolf Point. 44. Develop new riverfront parks as new neighborhoods will develop on the east 16. Create new public space at the Sun Times-Trump Tower Chicago site. bank of the South Branch of the Chicago River. 17. Create a new public park at Wolf Point. 45. Expand the Jefferson Playlot in Pilsen at 17th and Jefferson Streets. 46. Improve park at the South Loop Annex School site. THE EXPANDED LOOP 47 Complete park at 24th and Federal Streets 18. Create a continuous pedestrian riverwalk along Wacker Drive on the Main Branch 48. Create a new park at Stearns Quarry in Bridgeport from Lake Street to the lakefront as part of the Wacker Drive improvements. 19. Develop a riverfront plaza on the west bank of the South Branch between Randolph and Lake Streets. Key Greenway Recommendations 20. Develop a public riverfront plaza at 310 South Wacker Drive. 21. Create new riverfront open space at the Old Main Post Office along with its redevelopment. 49. Improve landscaping along expressway corridors and intersections throughout the Central Area. SOUTH LOOP AND NEAR SOUTH 50. Create a “green” intersection at the Ohio Street feeder from the Kennedy Expressway. 22. Create a new riverfront park at Franklin Point. 51. Create a “green” intersection and a gateway feature at the intersection of the 23. Create a continuous public river park on the east side of the Chicago River to Eisenhower and Kennedy Expressways provide public access from Harrison Street to Ping Tom Park. 52. Expand sidewalks and landscaping over the Kennedy Expressway connecting the 24. Expand Ping Tom Park. West Loop with Greektown. 25. Achieve a continuous open space corridor along the west side of the Chicago River. 53. Develop a new greenway along the St. Charles Airline 26. Implement Origins Park plan at the South Turning Basin. 27. Expand Origins Park to serve the Bridgeport neighborhood. Final Report CHICAGO CENTRAL AREA PLAN DRAFT June 2003 107.

View Full Text

Details

  • File Type
    pdf
  • Upload Time
    -
  • Content Languages
    English
  • Upload User
    Anonymous/Not logged-in
  • File Pages
    4 Page
  • File Size
    -

Download

Channel Download Status
Express Download Enable

Copyright

We respect the copyrights and intellectual property rights of all users. All uploaded documents are either original works of the uploader or authorized works of the rightful owners.

  • Not to be reproduced or distributed without explicit permission.
  • Not used for commercial purposes outside of approved use cases.
  • Not used to infringe on the rights of the original creators.
  • If you believe any content infringes your copyright, please contact us immediately.

Support

For help with questions, suggestions, or problems, please contact us