Section 3: Km 10.5 to 17.1 Tbilisi-Phonichala

Section 3: Km 10.5 to 17.1 Tbilisi-Phonichala

Initial Environmental Examination Initial Environmental Examination 2 Document Stage: Final Project Number: 42414 GEO: Sustainable Urban Transport Investment Program, Tranche 2 (Section-3: km 10.5 to 17.1 Tbilisi – Phonichala) Prepared by Ministry of Regional Development and Infrastructure under the Municipal Development Fund for the Asian Development Bank. Municipal Development Fund of Georgia Initial Environmental Examination Section-3: Phonichala - Rustavi Voolume-1 Engineering, Procurement, Construction Management and Supervision of the Modernization of Tbilisi-Rustavi Section of the Tbilisi-Red Bridge (Azerbaijani Border) Road Contract No: SUTIP/C/QCBS-3 Funded by Asian Development Bank Loan: 2655-GEO Prepared by: Foundation WEG Prepared for: DOHWA Ltd / TRANSPROJECT Ltd Ministry of Regional Development and Infrastructure GEORGIA 2012 Korea Georgia Georgia TABLE OF CONTENTS pp 1. INTRODUCTION . .. 1 1.1 Background . .. .. 1 1.2 Objectives . .. .. .. 1 1.3 Methodology for IEE . .. .. 1 2. DESCRIPTION OF THE PROJECT . .. 2 2.1 Overview . .. 2 2.2 Type and Category of Project . .. 3 2.3 Need for Project . .. 3 2.4 Location . .. 4 2.5 Proposed Schedule for Implementation . .. 6 2.6 Design Criteria and Parameters . .. 6 2.7 Road Pavement Structure . .. 8 2.8 Engineering Structures . .. 9 2.9 Utility Relocation. .. 17 2.10 Equipment Use During Construction . .. 21 2.11 A complex of auxiliary building objects . .. 22 2.12 Quarries . .. 22 2.13 Traffic Management During Construction . 24 3. GOVERNMENT POLICY LEGAL AND ADMINISTRATIVE FRAMEWORK . 26 3.1 Introduction . .. 26 3.2 Georgian Legislation Related to Environmental Permitting . 26 3.3 ADB Environmental and Social Safeguards Requirements (SPS 2009) . 30 3.4 EIA Requirements under Georgian and ADB Procedures . 31 3.5 Environmental Screening for Current Project . 32 3.6 Administrative Framework . 32 3.6.1 The Roads Department (RD or RDMRDI) . 32 3.6.2 Ministry of Environmental Protection (MOE) . 33 3.6.3 Ministry of Economy and Sustainable Development (MoESD) . 33 3.6.4 Other Responsible Governmental Institutions . 33 3.7 International Treaties and Conventions . 34 3.7.1 The Convention on Biological Diversity, 1994 . 34 3.7.2 The Convention on the Conservation of Migratory Species of Wild Animals . 34 3.7.3 Convention on Wetlands of International Importance . 34 3.7.4 Convention on International Trade in Endangered Species of Wild Fauna and Flora (CITES) . 35 4. DESCRIPTION OF THE ENVIRONMENT . 36 4.1 Physical Resources in Project Area . 36 4.1.1 Climate . 36 4.1.2 Air Quality . 39 4.1.3 Background noise . 42 4.1.4 Background radiation . 43 4.1.5 Information about the surface watercourses and ground pollution . 44 4.1.6 Topography and Relief . 47 4.1.7 Geological conditions of the study area . 48 4.1.8 Assessment of the Design Corridor Engineering-Geological Conditions by pickets (kilometers) . 54 4.1.9 Water Resources . 59 4.2 Ecological Resources – Landscape and Flora . 62 4.2.1 Landscape and Soils . 62 4.2.2 Vegetation . 63 4.2.3 Ecologically Sensitive Sites . 67 4.3 Ecological Receptors – Fauna . 68 4.3.1 General description of fauna . 68 4.3.2 Description of Biotops in Project Area . 72 5. SOCIO-ECONOMIC CONDITIONS . 74 5.1 Demography . 74 5.2 Socio-Economic Characteristics . 76 5.3 Expected social impact of the Project . 83 5.3.1 General social impact of the Project . 83 5.3.2 Construction-related social impacts . 83 5.4 Land Acquisition and Resettlement . 84 5.5 Socio-Cultural Environment . 87 5.5.1 Historical Context . 87 5.5.2 Cultural Heritage in Project Area . 88 6. ANALYSIS OF ALTERNATIVES . 89 7. ENVIRONMENTAL IMPACTS . 94 7.1 Summary of Activities and Anticipated Impacts . 94 7.2 Specific Environmental Impacts. 99 7.2.1 Air Emissions Related to Construction Activities and Operation of Highway . 99 7.2.2 Noise Factor Related to Construction and Operation of the Road . 121 7.3 Potential Impacts Related To the Construction Activities . 123 7.3.1 Pollution and Waste . 123 7.3.2 Impacts on Flora . 125 7.3.3 Impact on Fauna . 125 7.3.4 Protected Areas . 126 7.3.5 Landscape . 126 7.3.6 Water Use . 126 7.3.7 Impacts on Archaeological Sites . 126 7.3.8 Transport related impacts . 126 7.3.9 Traffic Disruption . 126 7.3.10 Quarry-related Impact . 127 7.3.11 Construction Camp-related Impacts . 127 7.3.12 Construction Related Impacts at the Concrete Plant and Gravel Crushing Facilities . ..

View Full Text

Details

  • File Type
    pdf
  • Upload Time
    -
  • Content Languages
    English
  • Upload User
    Anonymous/Not logged-in
  • File Pages
    330 Page
  • File Size
    -

Download

Channel Download Status
Express Download Enable

Copyright

We respect the copyrights and intellectual property rights of all users. All uploaded documents are either original works of the uploader or authorized works of the rightful owners.

  • Not to be reproduced or distributed without explicit permission.
  • Not used for commercial purposes outside of approved use cases.
  • Not used to infringe on the rights of the original creators.
  • If you believe any content infringes your copyright, please contact us immediately.

Support

For help with questions, suggestions, or problems, please contact us