
-/XnyivAn L fcA v^ local environment agency plan NORTH NORFOLK CONSULTATION REPORT SUMMARY JUNE 1996 INTRODUCTION Local Environment Agency Planning aims to create a consistent framework within which all the Agency's functions and responsibilities can be applied in a co-ordinated and sustainable manner within a particular catchment area. The current state of the environment is systematically analysed and compared with appropriate standards. Where these standards are not being met or are likely to be affected in the future, the shortfalls, together with options for actions to resolve them, are presented as issues in a table at the end of this brochure. WHAT IS LOCAL ENVIRONMENT AGENCY PLANNING? River catchments are subject to increasing use by a wide variety of activities, many of which interact giving rise to some conflicts. The many competing demands on the water, land, and air environments and the interests of users and beneficiaries must be balanced. Catchment management involves the Agency working with many people and organisations and using its authority to ensure that the natural environment is protected, and where possible improved, for the benefit of present and future users. The process is open and integrated to optimise the overall future well-being of people and ecosystems through the pro-active management of the environment. It is evolving from the former water based National Rivers Authority Catchment Management Planning process and embraces the wider Agency remits to regulate waste and industrial air pollution. This Local Environment Agency Letheringsett Mill - a restored water mill on the Plan is one of the Agency's first River Claven 2 opportunities to bring together the policies, objectives and options for North Norfolk for overall environmental improvement. It must be emphasised that this plan is not an end in itself. Its purpose is to provide a comprehensive local guide to the present status and vision for the catchment. It is the essential first step in providing the basis for drawing up a plan of action. YOUR VIEWS Formulation of this plan involves consulting and working with many public bodies and individuals. Your views on the issues identified are welcomed. You may also wish to comment on other matters affecting the land, air, or water environments in the catchment area which you think should be examined by the Agency. Please write with your comments to the following address, from which a full copy of the Consultation Report may also be obtained:- Dr Jonathan Wortley, Planning & Customer Services Manager, Environment Agency, Anglian Region - Eastern Area, Cobham Road, IPSWICH, Suffolk IP3 9JE. Comments in writing, must be received by 1 st October 1996. THE ENVIRONMENT AGENCY The Environment Agency is one of the most powerful environmental regulators in the world. It provides a comprehensive approach to the protection and management of the environment by combining the regulation of waste to land, water, and industrial releases to air. Its creation on 1st April 1996 was a major and positive step, merging the expertise of the National Rivers Authority, Her Majesty's Inspectorate of Pollution, the Waste Regulation Authorities and several smaller units from the Department of the Environment. The Agency takes a much wider view of environmental regulation than was possible for its predecessors, though remaining an independent, impartial and firm regulator in their best traditions. Nationally, the Agency has responsibilities for: • Regulating over 2000 industrial processes with the greatest polluting potential, using the best available techniques not entailing excessive cost to prevent or minimise pollution. • Advising the Environment Secretary on the Government's National Air Strategy, and providing guidance to Local Authorities on their Air Qualitv Manaaement DI^ ENVIRONMENT AGENCY 089879 • Regulating the disposal of radioactive waste at more than 8000 sites, including nuclear sites, the keeping and use of radioactive material and the accumulation of radioactive waste at non-nuclear sites. • Regulating the treatment and disposal of controlled waste, involving 8000 waste management sites and some 70,000 carriers so as to prevent pollution or harm to human health. • Implementing the Government's National Waste Management Strategy for England and Wales in its Waste Regulation work. • Preserving and improving the quality of rivers, estuaries and coastal waters through its pollution control powers, including 100,000 water discharge consents and regulation of more than 60,000 sewage works. • Action to conserve and secure proper use of water resources, including 50,000 licensed water abstractions. # • Supervising all flood defence matters, involving over 43,000 kilometres of defence works. • Maintenance and improvement of salmon, trout, freshwater and eel fisheries, including the issue of some 1,000,000 angling licences. • Conserving the water environment, including areas of outstanding natural beauty or environmental sensitivity extending to nearly four million hectares, and promoting their use for recreation where appropriate. • Maintaining and improving non-marine navigation, including licensing of some 40,000 boats. • Regulating the management and remediation of contaminated land designated as special sites. • Providing independent and authoritative views on a wide range of environmental issues which may involve analysis and comment beyond the Agency's specific regulatory remit. • Liaison with international counterparts and governments, particularly within the European Union, to help develop consistent environmental policies and action worldwide. THE CATCHMENT The North Norfolk Local Environment Agency Plan area comprises a relatively narrow strip along the North Norfolk coast, together with its adjacent waters in the Wash and the North Sea. The freshwater rivers are the Hun, Burn, Stiffkey, Glaven and Mun, together with their tributaries. The Plan lies wholly with the County of Norfolk, and embraces parts of the Local Authority areas of North Norfolk District Council and the Borough of King's Lynn and West Norfolk. 4 CATCHMENT FACTS GENERAL Land Area 522 Km* Population 24,967 (mid 1993) WATER Public Water Supply Abstractions RESOURCES There are four licensed Public Water Supply abstractions at: Wighton, Houghton St Giles, Glandford, Sheringham and Mundesley (the latter two sites being under one licence). WATER Length (km) of River in General Quality Assessment QUALITY classifications (1992-1994) CLASS A 14 CLASS B 47.5 CLASS C 3.5 CLASS D 0 CLASS E 8.5 CLASS F 0 Length (km) of Estuary in Coastal and Estuarine Working Party Grades CLASS A 10.5 CLASS B 0 CLASS C 0 CLASS D 0 INDUSTRIAL There are three Integrated Pollution Control authorizations for POLLUTION the gas terminals at Bacton. PREVENTION WASTE One major landfill site at Edgefield (34,000 tonnes per MANAGEMENT annum). FLOOD Length of Designated Main River: Fluvial 75 km DEFENCE Tidal 18 km Length of Environment Agency maintained tidal defences 38.5 km CONSERVATION Numbers of: Sites of Special Scientific Interest 24 National Nature Reserves 3 Ramsar Sites 1 Special Protection Areas 2 Candidate Special Areas of Conservation 3 County Wildlife Sites 87 NAVIGATION The Anglian Region of the Environment Agency has no statutory Navigation responsibility within this plan area. 5 LAND USE AND DEVELOPMENT Land use is predominantly agricultural. Approximately 80% of the 43,000 hectares of agricultural land in the plan area is of Grades 1, 2 or 3a, which is considered to be of the best and most versatile quality. No major growth is envisaged in either housing provision or industry. Tourism plays a major role in the catchment, and servicing this need employs a significant proportion of the local population. WATER QUALITY The supply of good quality water for public water supply is of major importance. Abstractions of water are undertaken by Anglian Water Services at Wighton, Houghton St Giles, Glandford, Sheringham and Mundesley. The national chemical General Quality Assessment survey (1994) showed that chemical water quality in the plan area was generally very good. This showed improvements on the 1990 survey with significant upgrades in classes on the upper River Burn, the lower Burn, and the River Glaven between Letheringsett Mill and Glandford Ford. Coastal surveys have revealed elevated nutrient levels around the North Norfolk coast. In addition, summer algal blooms occur. Coastal water quality models suggest that the coastal water quality is strongly influenced by the Wash and Humber estuaries. 6 INDUSTRIAL POLLUTION PREVENTION The following two sub-sections outline the responsibilities for environmental regulation, incorporated into the Agency from the former duties of Her Majesty's Inspectorate of Pollution: INTEGRATED POLLUTION CONTROL Within the plan area, there are only three Integrated Pollution Control processes authorised by the Agency under part 1 of the Environmental Protection Act 1990. These are the gas terminals at Bacton and represent the only significant industrial releases to the environment within the area. The processes release quantities of volatile organic compounds (mainly methane), oxides of nitrogen and oxides of carbon (from combustion) to air. In the case of Phillips Petroleum UK Co Ltd there is also a release of sulphur dioxide and a small quantity of hydrogen sulphide to air (usually only in the winter months). Each process discharges effluent to coastal waters, containing small quantities of glycol and methanol with even smaller
Details
-
File Typepdf
-
Upload Time-
-
Content LanguagesEnglish
-
Upload UserAnonymous/Not logged-in
-
File Pages41 Page
-
File Size-