Draft Environmental Assessment

Draft Environmental Assessment

Draft Environmental Assessment For the Sandpoint Airport Runway and Taxiway Improvements Sandpoint, Idaho PREPARED BY J-U-B ENGINEERS, INC. April 2019 422 W. Riverside Spokane, Washington 99201 (509) 458-3727 www.jub.com DRAFT Environmental Assessment For the Sandpoint Airport Runway and Taxiway Improvements at the Sandpoint Airport Sandpoint, Idaho April 2019 This Environmental Assessment becomes a Federal document when evaluated and signed by the responsible FAA official. ___________________________________ _____________________________ Responsible FAA Official Date Sandpoint Airport 2019 Environmental Assessment i Table of Contents 1.1 Introduction .............................................................................................................................1 1.2 Background and Existing Facilities .............................................................................................1 1.3 Existing Operations ...................................................................................................................5 1.4 Airport Forecasts ......................................................................................................................5 1.5 Proposed Action .......................................................................................................................7 2.1 Purpose of the Proposed Action .............................................................................................. 17 2.2 Need for the Proposed Action ................................................................................................. 17 2.3 Requested Federal Actions ...................................................................................................... 22 3.1 Overview ................................................................................................................................ 23 3.2 Preliminary Alternatives Considered ....................................................................................... 25 3.3 Alternatives Carried Forward for Analysis within this EA .......................................................... 50 4.1 Introduction ........................................................................................................................... 52 4.2 Air Quality .............................................................................................................................. 54 4.3 Biological Resources ............................................................................................................... 58 4.5 Department of Transportation Act, Section 4(f) Resources ....................................................... 63 4.6 Farmlands .............................................................................................................................. 66 4.7 Hazardous Materials, Solid Waste, and Pollution Prevention ................................................... 68 4.8 Historical, Architectural, Archaeological, and Cultural Resources ............................................. 71 4.9 Land Use ................................................................................................................................ 74 4.10 Natural Resources and Energy Supply .................................................................................... 76 4.11 Noise and Compatible Land Use ............................................................................................ 77 4.12 Socioeconomics, Environmental Justice, and Children’s Health and Safety Risks ..................... 81 4.14 Water Resources (including Wetlands, Floodplains, Surface Waters, Groundwater, and Wild and Scenic Rivers) ........................................................................................................................ 87 4.15 Cumulative Impacts ............................................................................................................ 103 4.15.1 Past, Current, and Future Project Listing ....................................................................... 103 4.15.2 Environmental Impact Category Analysis ...................................................................... 104 4.16 Public Involvement ............................................................................................................. 108 Sandpoint Airport 2019 Environmental Assessment ii 4.17 Conclusion .......................................................................................................................... 108 List of Figures Figure 1.1. Airport Location Map. .......................................................................................................2 Figure 1.2. Vicinity Map. .....................................................................................................................3 Figure 1.3. Existing Conditions Exhibit. ................................................................................................6 Figure 1.4. Runway Shift Exhibit. ........................................................................................................7 Figure 1.5. Wind Cone Location Exhibit. ..............................................................................................7 Figure 1.6. Taxiway Construction Exhibit. ............................................................................................8 Figure 1.7. Land Acquisitions Exhibit. ..................................................................................................9 Figure 1.8. Relocation of North Boyer Avenue Exhibit. ...................................................................... 11 Figure 1.9. New Apron Space and Taxilane Exhibit. ........................................................................... 12 Figure 1.10. Hangar Build-Out Exhibit. .............................................................................................. 13 Figure 1.11. Snow Removal Equipment Building Exhibit. ................................................................... 14 Figure 1.12. Parking Areas and Access Roads Exhibit. ........................................................................ 15 Figure 1.13. Project Action Summary Exhibit. .................................................................................... 16 Figure 3.1. Illustration of MPU Timeline. ........................................................................................... 24 Figure 3.2. Alternative D1 ................................................................................................................. 34 Figure 3.3. Alternative D2 ................................................................................................................. 35 Figure 3.4. Alternative D3 ................................................................................................................. 36 Figure 3.5. Alternative D4 ................................................................................................................. 37 Figure 3.6. Alternative D5 ................................................................................................................. 38 Figure 3.7. Alternative A1 ................................................................................................................. 39 Figure 3.8. Alternative A2 ................................................................................................................. 40 Figure 3.9. Alternative A3 ................................................................................................................. 41 Figure 3.10. Alternative A4 ............................................................................................................... 42 Figure 3.11. Revised Preferred Alternative as reflected on the May 2015 ALP. ................................... 44 Figure 3.12. Landside Development Areas. ....................................................................................... 47 Figure 3.13. Proposed Signage Improvements Exhibit. ...................................................................... 48 Figure 3.14. Proposed Action Alternative .......................................................................................... 49 Figure 4.1. Proposed Action Study Area. ........................................................................................... 53 Figure 4.2. Hangars scheduled for removal at the Airport. ................................................................. 73 Figure 4.3. The existing hangar on Lot 26. ......................................................................................... 73 Figure 4.4. Noise Contour Exhibit. ..................................................................................................... 79 Figure 4.5. Bonner County Employment Breakdown (2016). .............................................................. 82 Figure 4.6. Sandpoint Airport Wetlands Exhibit. ................................................................................ 90 Sandpoint Airport 2019 Environmental Assessment iii List of Tables Table 1.1. Proposed property acquisitions. ....................................................................................... 10 Table 2.1. Comparison of FAA B-II design standards and existing airport conditions. .......................... 18 Table 3.1. Alternative Summary Table .............................................................................................. 28 Table 4.1. Emissions levels associated with primary construction equipment....................................

View Full Text

Details

  • File Type
    pdf
  • Upload Time
    -
  • Content Languages
    English
  • Upload User
    Anonymous/Not logged-in
  • File Pages
    120 Page
  • File Size
    -

Download

Channel Download Status
Express Download Enable

Copyright

We respect the copyrights and intellectual property rights of all users. All uploaded documents are either original works of the uploader or authorized works of the rightful owners.

  • Not to be reproduced or distributed without explicit permission.
  • Not used for commercial purposes outside of approved use cases.
  • Not used to infringe on the rights of the original creators.
  • If you believe any content infringes your copyright, please contact us immediately.

Support

For help with questions, suggestions, or problems, please contact us