Patuxent River and Patapsco River Watershed Assessments Howard County, Maryland

Patuxent River and Patapsco River Watershed Assessments Howard County, Maryland

HOWARD COUNTY STORMWATER MANAGEMENT DIVISION Patuxent River and Patapsco River Watershed Assessments Howard County, Maryland Thorough watershed assessment helps Howard County, Maryland chart the course toward county-wide water quality improvement. conducted stream assessments For the second phase of of the County’s two water- each watershed assessment, sheds: the Southern Middle Biohabitats developed con- Patuxent, and the Patapsco cepts for the highest priority River South Branch. The goal proposed retrofit and res- of the assessments was to toration opportunities. The identify and prioritize oppor- concepts, which included tunities to improve water qual- approaches such as channel ity through stream restoration, stabilization, Regenerative outfall stabilization, new Stormwater Conveyance stormwater Best Management (RSC), bioretention facili- Practices (BMP), tree planting, ties, and tree plantings, were and BMP conversion projects. designed to provide eco- The assessments integrated ele- logical habitat and stormwater from top: Watershed assessment of Howard County’s ments of the Stream Corridor filtration while also helping natural resources; Severly eroded initial conditions Assessment (SCA), Rapid the County estimate imple- Bioassessment Protocol (RBP), mentation costs and meet oward County’s Storm Sewer System (MS4) Permit Bank Assessment for Non- Total Maximum Daily Load H Water Management requirement. To tackle the point source Consequences (TMDL) targets established Division set an ambitious daunting task that encom- of Sediment (BANCS), and for phosphorus and sediment goal of performing compre- passed a 253-square-mile Retrofit Reconnaissance in the local watersheds. hensive assessments of the study area, Howard County Inventory (RRI) with other County’s watersheds over a turned to their team of on- qualitative site data on the SERVICES two-year period to satisfy their call consultants. Working feasibility of a project including Management National Pollutant Discharge closely with the County and land ownership, constraints, Public Outreach Elimination System (NPDES) their other on-call engineer- and ease of access. Policy Municipal Separate Storm ing consultants, Biohabitats conservation planning ecological restoration regenerative design Physiographic Province Piedmont Bioregion Chesapeake/Delaware Bays Watershed Middle & Little Patuxent River & Patapsco River 1.

View Full Text

Details

  • File Type
    pdf
  • Upload Time
    -
  • Content Languages
    English
  • Upload User
    Anonymous/Not logged-in
  • File Pages
    1 Page
  • File Size
    -

Download

Channel Download Status
Express Download Enable

Copyright

We respect the copyrights and intellectual property rights of all users. All uploaded documents are either original works of the uploader or authorized works of the rightful owners.

  • Not to be reproduced or distributed without explicit permission.
  • Not used for commercial purposes outside of approved use cases.
  • Not used to infringe on the rights of the original creators.
  • If you believe any content infringes your copyright, please contact us immediately.

Support

For help with questions, suggestions, or problems, please contact us