Building Stone Khanda, Gitty / Boulders Project at Gata No.- 2451

Building Stone Khanda, Gitty / Boulders Project at Gata No.- 2451

FORM 1 i. Basic Information Sl. Item Details 1. Name of the project/s Building stone Khanda, Gitty / Boulders Environmental Clearance for Proposed 2.75 ha (6.80 acres) Jarar ProjectNarain at Gatai No.- 2451(Khand no.-5) , 2. S.No. In the schedule Area: Village- , Tehsil District- ,Banda, U.P. 3. Proposed capacity/area/length/tonnage to be 1(a), Category- B (B1) 27500 handled/command area/lease area/number of 2.75 ha (6.80 acres) 3 wells to be drilled Proposed Production: m /annum 4. New/Expansion/Modernization Area 5. Existing Capacity/Area etc. New Quarry (LoI) 3 6. Category of Project i.e. ‘A’ or ‘B’ Proposed Production: 27500 m annum Area 2.75 ha(6.80) acres Category- B (B1) (as per EIA notification SO. 7. Does it attract the general condition? If yes, please specify. 141(E) 15 Jan 2016) 8. Does it attract the specific condition? If yes, No please specify. No 9. Location Plot/Survey/Khasra No. Building stone Proposed Environmental Clearance for Proposed Area: Khanda,2.75 ha(6.80acres)Gitty/Boulders, Project at Gata No.- 2451(khand no.5), Village-jarar , Tehsil NarainiPillar DistrictLat. -, Banda , U.PLong. A 25°19'5.54"N 80°21'48.83"E B 25°19'5.39"N 80°21'51.08"E C 25°19'3.47"N 80°21'51.45"E D 25°18'57.70"N 80°21'51.28"E E 25°18'54.32"N 80°21'49.27"E F 25°18'55.88"N 80°21'47.61"E G 25°19'0.66"N 80°21'48.20"E Village Tehsil Jarar District Naraini State Banda 10. Nearest railway station/airport along with UttarRailway Pradesh Station: distance in kms. Page 1 of 1 Sl. Item Details Airport: Banda Railway station- 20.0km (N) Khajuraho Airport – 75.0* km (SE) 11. Nearest town, city, district headquarters along Nearest Town: /Nearest City: with distance in kms. Banda- 18.57* km (N) District headquarters: Banda- 18.57* km (N) 12. Village Panchayats, Zilla Parishad, Muncipal corporation, Local body (complete postal Village-Jarar , Tehsil - Naraini ,District- addresses with telephone nos. to be given) ,Banda, U.P 13. Name of the applicant Shri Indrason Maurya S/o Shri Brigunath 14. Registered address Village-Jarar , Tehsil & District-Naraini , 15. Address for correspondence Banda, U.P Name M/s Maa Gaytri Traders, Porp. Shri IndrasonMaurya S/o Shri Brigunath Designation (Owner/Partner/CEO) Address Owner631/29 Mulayam Nager Ismileganj Thana Gazipur, District Lucknow, UP R/o Pin Code . E-mail 226016 Telephone No. [email protected] Fax no. 9335881715 16. Details of Alternative sites examined, if any. - Location of these sites should be shown on a Toposheet. No site alternatives have been proposed. 17. Interlinked projects 18. Whether separate application of interlinked None project has been submitted? 19. If yes, date of submission NA 20. If no, reason NA 21. Whether the proposal involves NA approval/clearance under: If yes, details of the same and their status to be given. (a) Not required. (a) The forest (conservation) Act, 1980? (b) Not required (b) The wildlife (protection) Act, 1972? (c) Not required. (c) The C.R.Z. Notification, 1991? Page 2 of 2 Sl. Item Details 22. Whether there is any Government order/Policy Lease has been Allotted by DM Banda ( relevant/relating to the site? Mining Section ) vide letter no. 4113/Khanij-30-banda , dated 08.March, 2018 23. Forest land involved (hectares) 24. Whether there is any litigation pending against No forest land is involved in the project. the project and/or land in which the project is propose to be set up? None (a) Name of the court (b) Case No. (c) Orders/directions of the court, if any and its relevance with the proposed project. I. ACTIVITY 1. Construction, operation or decommissioning of the Project involving actions, which will cause physical changes in the locality (topography, land use, changes in water bodies, etc.) S.No. Information/Checklist confirmation Yes/ No It is proposed to mine the building Stone i.e. Gitti/Boulder from mine lease area. 1.1 Permanent or temporary change in land use, Yes Mining will be carried out strictly as per land cover or topography including increase UPMMCR- 1963 and will be restricted to in intensity of land use (with respect to local the Mining Lease Area only keeping the land use plan) adjoining area unaffected. Under reclamation the mined pit will be filled with the over burden and other mine waste and plantation will be carried out on it. Thus the change in land course of proposed mining lease area will be positive. 1.2 Clearance of existing land, vegetation and Yes The proposed mining lease area is buildings. barren wasteland free from any building but there is some bushes/ shrubs Afterrequire the clearance completion certificate of the projectof exis tingthe presentland. land use of the proposed mining 1.3 Creation of new land uses? Yes lease area will be changed from the present waste barren upland to plain land scape with plantation work under the reclamation. 1.4 Preconstruction investigations No NA e.g. bore holes, soil testing? 1.5 Construction works? No NA 1.6 Demolition works? Page 3 of 3No NA S.No. Information/Checklist confirmation Yes/ No Mining is confined in day time only, and laborers from local area will be hired, thus 1.7 Temporary sites used for construction works No no housing of construction workers is or housing of construction workers? required. 1.8 Above ground buildings, structures or No No civil work is required in the mine earthworks including linear structures, cut lease area and fill or excavations 1.9 Underground tunneling? works including No ReclamationNA work shall be done by filling mining or the mined pit with over burden and 1.10 Reclamation works? Yes plantation on it. Not Applicable 1.11 Dredging? No Not Applicable 1.12 Offshore structures? No Not Applicable After drilling and blasting mined material 1.13 Production and manufacturing processes? No will be loaded and transported directly 1.14 Facilities for storage of goods or materials? No through the trucks or trolleys; hence only temporary storage will be required. There would be no laborers inhabitation at site thus any generation of solid waste or a 1.15 Facilities for treatment of disposal of solid No liquid effluent is not anticipated. waste or liquid effluents? Mining activities is confined to day time only, thus do not involve long term 1.16 Facilities for long term housing of operational No housing of operational workers. Workers? 1.17 New road, rail or sea traffic during No haulage road- 0.30(Km) construction or operation? 1.18 New road, rail, air waterborne or other No haulage road- 0.30 (Km) transport infrastructure including new or altered routes and stations, ports, airports No closure or diversion of existing etc? transport routes is anticipated due to the 1.19 Closure or diversion of existing transport No proposed project activities. routes or infrastructure leading to changes in traffic movements? 1.20 New or diverted transmission lines or No Neither any transmission line/ pipeline pipelines? exist at site nor diversion of any Bouldertransmission mining line/ will pipeline be carried is outproposed as per UPMMCRunder the proposed- 1963 and project. will be restricted to 1.21 Impoundment, damming, culverting, No Mining Lease Area only unaffecting the realignment or other changes to the adjoining area; hence no change to the hydrology of watercourses or aquifers? hydrology of watercourse or aquifers is anticipated. 1.22 Stream crossings? No NA 1.23 Abstraction or transfers of water from ground No The water requirement of 4.0 KLD for or surface waters? Page 4 of 4 the operational workers will be met S.No. Information/Checklist confirmation Yes/ No through nearby existing borewells and water from these sources will be made available at site by private water tankers. It has been proposed that not Proposedmore than 42mininglocal laborswill willbe be hireddone systematicallyfrom nearby villages. & scientifically, as per the 1.24 Changes in water bodies or the land surface Yes mining laws prescribed in the UPMMCR- affecting drainage or run-off? 1963. 1.25 Transport of personnel or materials for No NA construction, operation or decommissioning? 1.26 Long-term dismantling or decommissioning No NA or restoration works? 1.27 Ongoing activity during decommissioning No NA which could have an impact on the environment? 1.28 Influx of people to an area in either Yes It has been proposed that not more than temporarily or permanently? 42 laborers will be employed locally from nearby villages. The influx of the people will be temporary and positive (in terms of employment). 1.29 Introduction of alien species? No NA 1.30 Loss of native species or genetic diversity? No NA No 1.312. UseAny of other Natural actions? resources for construction or operationNA of the Project (such as land, water, materials or energy, especially any resources which are non-renewable or in short supply): S.No. Information/checklist Yes/No Details thereof (with approximate quantities confirmation /rates, wherever possible) with source of information data Proposed mining lease area (2.75 ha) is undeveloped barren upland. 2.1 Land especially undeveloped or No agricultural land (ha) 2.2 Water (expected source & Yes It is estimated that approx. 0.42 KLD water will be competing users) unit: required for a maximum of 42site workers (@ 10 lpcd). Apart from this 4.0 KLD water will be required for sprinkling on roads & For plantation water use near about 0.095 KLD. The total water requirement of water for the proposed project has been estimated to be 4.515 KLD.

View Full Text

Details

  • File Type
    pdf
  • Upload Time
    -
  • Content Languages
    English
  • Upload User
    Anonymous/Not logged-in
  • File Pages
    27 Page
  • File Size
    -

Download

Channel Download Status
Express Download Enable

Copyright

We respect the copyrights and intellectual property rights of all users. All uploaded documents are either original works of the uploader or authorized works of the rightful owners.

  • Not to be reproduced or distributed without explicit permission.
  • Not used for commercial purposes outside of approved use cases.
  • Not used to infringe on the rights of the original creators.
  • If you believe any content infringes your copyright, please contact us immediately.

Support

For help with questions, suggestions, or problems, please contact us