
(See paragraph-6) Form 1 (a) For item (I) relating to the Basic Information, the following shall be substituted, namely:- S.N. Item Details 1 Name of the project Project by GK Associates Promoters and Builders 2 S. no in the scheduled 8 (a) Area of Plot : 13,808.00 m2 Proposed capacity / Area/ length/ tonnage FSI area: 24,238.06 m2 3 to be handled/command area/lease Free of FSI Area: 24,848.70 m2 area/No. of wells to be drilled Total Built up area: 49,086.76 m2 4 New / Expansion / Modernization Expansion 5 Existing Capacity/Area etc Not Applicable Project category B2; Activity under Item 8 (a) of the EIA Notification dated 14th September 2006 6 Category of the project i.e. ‘A’ or ‘B’ as amended on 1st December, 2009 does not require scoping and public consultation Does it attract the general condition? If 7 Not Applicable yes, please specify Does it attract the Specific conditions? If 8 Not Applicable yes, please specify 9 Location Survey No. 63/2 , 64/7 Ravet, Tq: Haveli, Dist: Plot/Survey /Khasra No. Pune Village Ravet Tehasil Haveli District Pune State Maharashtra RAILWAY: Chinchwad railway station is at a distance of about 8 km. Nearest railway station /Airport along with AIRWAY: Lohgaon, Airport at about 20 km from 10 distance in Km site ROADWAY: Pune Mumbai Highway is about 0.5 km away. Nearest town/city/district/Headquarters PCMC (Pune Chinchwad Municipal Corporation) 11 with distance in Km : 10 Km Village pachayats, zilla parishad, Municipal 12 corporation, Local body (complete postal PCMC addresses with telephone no. to be given Appendix I- GK. Associates 63,64 Ravet 1 S.N. Item Details 13 Name of the Applicant GK Associates Promoters and Builders G.K.Associates ,S.No.120/2A, 14 Registered address Opposite Shivar Garden, Pimple Saudagar, Pune-411027 G.K.Associates ,S.No.120/2A, 15 Address for correspondence Opposite Shivar Garden, Pimple Saudagar, Pune-411027 Name Mr. V.P Chandwani Designation (Owner/Partner/CEO) Director Address Same as the point 14 Pin Code Pune 411027 E-mail [email protected] Telephone no. 020 – 27201414 Fax No. -- Details of alternatives sites examined, if 16 any. Location of these site should be Not Applicable shown on toposheet 17 Interlinked Projects Not Applicable Whether separate application of interlinked 18 Not Applicable project has been submitted? 19 If yes, date of submission Not Applicable 20 If no, reason -- Whether the proposal involves approval/clearance ; Under if yes details of No, Since the proposal under reference is in the same and their status to be given 21 developing part of the Pune Chinchwad Municipal 1. Forest (Conservation) Act, 1980? Corporation 2. Wildlife (Protection) Act, 1972? 3. C.R.Z. Notification, 1991? Whether there is any government 22 No order/policy relevant relating to the site 23 Forest land involved (hectors ) No forest land involved Whether there is any litigation pending against the project and/or land in which the project is proposed to be set up? (a) Name of the court 24 No, Not Applicable (b) Case no. (c) Orders/Directions of the court , if any and its relevance with the proposed project Appendix I- GK. Associates 63,64 Ravet 2 (II) ACTIVITY 1. Construction, Operation or decommissioning of the Project Involving actions, which will cause physical changes in the locality (Topography, land use, changes in water bodies, etc.) Sr. No Information/Checklist Yes/No Details thereof (with approximate confirmation quantities /rates, wherever possible) with source of information data 1.1 Permanent or temporary change Yes Please Refer in land use, land cover or Annexure I : Location Map topography including increase in Annexure II : Layout plan intensity of land use (with respect Annexure III : Contour map to local land use plan) 1.2 Clearance of existing Land, No No clearance of existing trees is required. vegetation and building? No existing building or trees present on site land is completely unutilized and barren land. 1.3 Creation of new land uses? Yes As stated in Point 1.1 1.4 Pre-construction investigation e.g. Yes Soil testing is done on the project site. borehole, soil testing? 1.5 Construction works Yes The proposal pertains to construction of Residential complex. Please refer Annexure IV: Area statement 1.6 Demolition work No Land is lying unutilized and no demolition is involved. 1.7 Temporary sites used for No No housing at site. The workers from construction works or housing of nearby areas will be engaged in construction workers? construction activity. 1.8 Above ground buildings, Yes Excavation for foundation is prominent structures or earthworks including activity. The debris and rubble removed linear structures, cut and fill or would be used as filling material for excavations leveling and for road construction. Top Appendix I- GK. Associates 63,64 Ravet 3 soil will be stored for landscaping 1.9 Underground works including No Not Applicable as the proposal pertains to mining or tunneling? construction of Residential Complex only. 1.10 Reclamation works? No Not Applicable 1.11 Dredging? No Not Applicable 1.12 Offshore structures? No Not Applicable 1.13 Production and manufacturing No Not Applicable as the proposal pertains to processes? construction of Residential complex. 1.14 Facilities for storage of goods or No Temporary storage Go down will be materials? provided for storage of construction material on site. 1.15 Facilities for treatment or disposal Yes Please refer of solid waste or liquid effluents? Annexure V: Details of STP. Annexure VI: Details of Solid Waste Generation and Disposal 1.16 Facilities for long term housing of No Not Applicable since project under operational workers? reference is residential construction project. 1.17 New road, rail or sea traffic Yes The development will not have major during construction or operation? impact on traffic pattern. Internal roads will be well constructed to manage traffic. 1.18 New road, rail, air waterborne or Yes RAILWAY: Chinchwad railway station is at a distance of about 8 km. other transport infrastructure AIRWAY: Lohgaon, Airport at about 20 including new or altered routes km from site ROADWAY: Pune Mumbai Highway is and stations, ports, airports etc? about 0.5 km away. 1.20 New or diverted transmission No Not Applicable lines or pipelines? 1.21 Impoundment, damming, No Not Applicable. culverting, realignment or other Appendix I- GK. Associates 63,64 Ravet 4 changes to the hydrology of watercourses or aquifers? 1.22 Stream crossing? No Not Applicable 1.23 Abstraction or transfers of water No Not Applicable from ground or surface waters? 1.24 Changes in water bodies or the No Not Applicable. land surface affecting drainage or run-off? 1.25 Transport of personnel or Yes Transport of raw material to the site for materials for construction, construction by Truck / Dumper. operation or decommissioning? 1.26 Long-term dismantling or No Not Applicable since there is no decommissioning or restoration dismantling involved in the project. works? 1.27 Ongoing activity during No Not Applicable since there is no decommissioning which could Decommissioning. have an impact on the environment. 1.28 Influx of people to an area in Yes Proposed project will influx of population either temporarily or for residential purpose. permanently? 1.29 Introduction of alien species? No No, Project proponent have proposed all the indigenous species 1.30 Loss of native species or genetic No Not Applicable. diversity? 1.31 Any other actions? No No other action with reference to construction Appendix I- GK. Associates 63,64 Ravet 5 2. Use of Natural resources for construction or operation of the Project (such as land, water, materials or energy, especially any resources which are non-renewable or in short supply): Sr. No. Information/checklist Yes/N Details thereof (with approximate confirmation o quantities /rates, wherever possible) with source of information data 2.1 Land especially undeveloped or No Not Applicable as land is vacant unutilized agricultural land (ha) and Barren. 2.2 Water (expected source & Yes Construction phase: Water supply competing users) unit: KLD required during construction will be fulfilled by tanker.. Operation Phase: source of water during operation is Grampanchayat Ravet (PMC) Please Refer Annexure V: Water demand & Water Balance. 2.3 Minerals (MT) No Since this is a construction project there will be no use of major minerals for construction. 2.4 Construction material – stone, Yes Materials will be procured from authorized aggregates, sand / soil (expected Dealer source – MT) 2.5 Forests and timber (source – MT) No No wood or timber will be used at greater extent during construction phase by project proponent. 2.6 Energy including electricity and fuels Yes Please Refer (source, competing users) Unit: fuel Annexure VII: Details of Energy (MT), energy (MW) requirement 2.7 Any other natural resources (use No No use of other natural resource appropriate standard units) Appendix I- GK. Associates 63,64 Ravet 6 3. Use, storage, transport, handling or production of substances or materials which could be harmful to human health or the environment or raise concerns about actual or perceived risks to human health. Sr. Information/Checklist Yes/No Details thereof (with approximate No. confirmation quantities/rates, wherever possible) with source of information data 3.1 Use of substances or materials, No No use of hazardous substances. which are hazardous (as per MSIHC rules) to human health or the environment (flora, fauna, and water supplies) 3.2 Changes in occurrence of disease No No such activity will be carried out which or affect disease vectors (e.g. will change or affect vectors to born. insect or water borne diseases) 3.3 Affect the welfare of people e.g.
Details
-
File Typepdf
-
Upload Time-
-
Content LanguagesEnglish
-
Upload UserAnonymous/Not logged-in
-
File Pages14 Page
-
File Size-