Pbh00005860 0001 Drawing List - Preliminary Design Phase Issue to Cec 11 July 2006

Pbh00005860 0001 Drawing List - Preliminary Design Phase Issue to Cec 11 July 2006

DRAWING LIST - PRELIMINARY DESIGN PHASE ISSUE TO CEC 11 JULY 2006 DRAWING NUMBER DRAWING TITLE Gogar Depot Proposed Maintenance and Stabling Layout Site Plan General ULE90130-06-DEP-00001 Arrangement Depot and Office Building Location Gogar Depot Depot and Office Building Ground Floor Depot Plan and Road ULE90130-06-DEP-00002 Arrangement Gogar Depot Depot and Office Building Ground Floor Depot Plan and Workshop ULE90130-06-DEP-00003 Arrangement ULE90130-06-DEP-00004 Gogar Depot Depot and Office Building Ground Floor Plan Layout ULE90130-06-DEP-00005 Gogar Depot Depot and Office Building First Floor Layout Plan Gogar Depot Power Energy Centre and Substation Buildings Section, Floor and ULE90130-06-DEP-00006 Roof Plan Layouts Gogar Depot Section 6 Depot Depot and Office Building South and West Facing ULE90130-06-DEP-00007 Elevations ULE90130-06-DEP-00008 Gogar Depot Depot and Office Building North and East Facing Elevations ULE90130-06-DEP-00009 Gogar Depot Depot and Office Building Sections A-A, B-B and C-C ULE90130-06-DEP-00010 Gogar Depot Depot and Office Building Sections D-D and E-E Gogar Depot Proposed Maintenance and Stabling Layout Site Profile Showing ULE90130-06-DEP-00012 Flightpath from Airport Gogar Depot Proposed Maintenance and Stabling Layout Site Plan General ULE90130-06-DEP-00013 Arrangement Showing External Works (1 of 2) Gogar Depot Proposed Maintenance and Stabling Layout Site Plan General ULE90130-06-DEP-00014 Arrangement Showing External Works (2 of 2) ULE90130-06-DEP-00017 Gogar Depot Depot and Office Building Roof Plan Layout ULE90130-06-DEP-00101 Gogar Depot Foundations Layout (Sheet 1 of 2) ULE90130-06-DEP-00102 Gogar Depot Foundations Layout (Sheet 2 of 2) ULE90130-06-DEP-00103 Gogar Depot Ground Floor Slab Layout (Sheet 1 of 2) ULE90130-06-DEP-00104 Gogar Depot Ground Floor Slab Layout (Sheet 2 of 2) ULE90130-06-DEP-00105 Gogar Depot Ground Floor Steel and Blockwork Layout (Sheet 1 of 2) ULE90130-06-DEP-00106 Gogar Depot Ground Floor Steel and Blockwork Layout (Sheet 2 of 2 ULE90130-06-DEP-00107 Gogar Depot First Floor Steel Layout (Sheet 1 of 2) ULE90130-06-DEP-00108 Gogar Depot First Floor Steel Layout (Sheet 2 of 2) ULE90130-06-DEP-00110 Gogar Depot Roof Level Steel Layout (Sheet 1 of 2) ULE90130-06-DEP-00111 Gogar Depot Roof Level Steel Layout (Sheet 2 of 2) ULE90130-06-DEP-00201 Gogar Depot Depot and Office Building Electrical Symbols Gogar Depot Depot and Office Building External Lighting and Electrical Services ULE90130-06-DEP-00202 Layout Gogar Depot Depot and Office Building Electrical Lighting Ground Floor ULE90130-06-DEP-00203 ULE90130-06-DEP-00204 Gogar Depot Depot and Office Building Electrical Lighting First Floor Gogar Depot Depot and Office Building Electrical and Small Power Layout Ground ULE90130-06-DEP-00205 Floor Gogar Depot Depot and Office Building Electrical and Small Power Layout First ULE90130-06-DEP-00206 Floor Gogar Depot Depot and Office Building Fire Alarm and Security Layout Ground ULE90130-06-DEP-00207 Floor Gogar Depot Depot and Office Building Fire Alarm and Security Layout First Floor ULE90130-06-DEP-00208 Gogar Depot Depot and Office Building Electrical Containment Layout Ground Floor ULE90130-06-DEP-00209 Gogar Depot Depot and Office Building Electrical Containment Layout First Floor ULE90130-06-DEP-00210 Gogar Depot Depot and Office Building Electrical LV Power Distribution Schematic ULE90130-06-DEP-00231 Gogar Depot Depot and Office Building Electrical and Fire Alarm Schematic ULE90130-06-DEP-00232 Gogar Depot Depot and Office Building Electrical and Earthing Schematic ULE90130-06-DEP-00233 Gogar Depot Depot and Office Building Ventilation and Air Cooling First Floor ULE90130-06-DEP-00302 ULE90130-SW-RRR-00030 PBH00005860 0001 DRAWING LIST - PRELIMINARY DESIGN PHASE ISSUE TO CEC 11 JULY 2006 Gogar Depot Depot and Office Building LPHW Radiator and Radiant Heating Layout ULE90130-06-DEP-00303 Ground Floor Gogar Depot Depot and Office Building LPHW Radiator Heating Layout First Floor ULE90130-06-DEP-00304 Gogar Depot Depot and Office Building Compressed Air Ground Floor ULE90130-06-DEP-00305 Gogar Depot Depot and Office Building Power Centre and Sub Station Floor Plans ULE90130-06-DEP-00306 and Section General Arrangement Gogar Depot Depot and Office Building Ventilation and Air Cooling Schematic ULE90130-06-DEP-00330 Gogar Depot Depot and Office Building Heating and HWS Plant Schematic ULE90130-06-DEP-00331 Gogar Depot Depot and Office Building Compressed Air Schematic ULE90130-06-DEP-00332 ULE90130-06-DEP-00401 Gogar Depot Depot and Office Building Public Health Services Site Plan Gogar Depot Depot and Office Building Public Health Services Ground Floor ULE90130-06-DEP-00402 Gogar Depot Depot and Office Building Public Health Services First Floor ULE90130-06-DEP-00403 Gogar Depot Depot and Office Building Public Health Services Water Services ULE90130-06-DEP-00430 Schematic Gogar Depot Depot and Office Building Public Health Services Sections and Details ULE90130-06-DEP-00450 Scheme Base Plans Section 1 Sheet 1 of 24 ULE90130-01-SBP-00001 Scheme Base Plans Section 1 Sheet 2 of 24 ULE90130-01-SBP-00002 Scheme Base Plans Section 1 Sheet 3 of 24 ULE90130-01-SBP-00003 Scheme Base Plans Section 1 Sheet 4 of 24 ULE90130-01-SBP-00004 Scheme Base Plans Section 1 Sheet 5 of 24 ULE90130-01-SBP-00005 Scheme Base Plans Section 1 Sheet 6 of 24 ULE90130-01-SBP-00006 Scheme Base Plans Section 1 Sheet 7 of 24 ULE90130-01-SBP-00007 Scheme Base Plans Section 1 Sheet 8 of 24 ULE90130-01-SBP-00008 Scheme Base Plans Section 1 Sheet 9 of 24 ULE90130-01-SBP-00009 Scheme Base Plans Section 1 Sheet 10 of 24 ULE90130-01-SBP-00010 Scheme Base Plans Section 1 Sheet 11 of 24 ULE90130-01-SBP-00011 Scheme Base Plans Section 1 Sheet 12 of 24 ULE90130-01-SBP-00012 Scheme Base Plans Section 1 Sheet 13 of 24 ULE90130-01-SBP-00013 Scheme Base Plans Section 1 Sheet 14 of 24 ULE90130-01-SBP-00014 Scheme Base Plans Section 1 Sheet 15 of 24 ULE90130-01-SBP-00015 Scheme Base Plans Section 1 Sheet 16 of 24 ULE90130-01-SBP-00016 ULE90130-SW-RRR-00030 PBH00005860 0002 DRAWING LIST - PRELIMINARY DESIGN PHASE ISSUE TO CEC 11 JULY 2006 Scheme Base Plans Section 1 Sheet 17 of 24 ULE90130-01-SBP-00017 Scheme Base Plans Section 1 Sheet 18 of 24 ULE90130-01-SBP-00018 Scheme Base Plans Section 1 Sheet 19 of 24 ULE90130-01-SBP-00019 Scheme Base Plans Section 1 Sheet 20 of 24 ULE90130-01-SBP-00020 Scheme Base Plans Section 1 Sheet 21 of 24 ULE90130-01-SBP-00021 Scheme Base Plans Section 1 Sheet 22 of 24 ULE90130-01-SBP-00022 Scheme Base Plans Section 1 Sheet 23 of 24 ULE90130-01-SBP-00023 Scheme Base Plans Section 1 Sheet 24 of 24 ULE90130-01-SBP-00024 Scheme Base Plans Section 2 Sheet 1 of 3 ULE90130-02-SBP-00001 Scheme Base Plans Section 2 Sheet 2 of 3 ULE90130-02-SBP-00002 Scheme Base Plans Section 2 Sheet 3 of 3 ULE90130-02-SBP-00003 Scheme Base Plans Section 3 Sheet 1 of 19 ULE90130-03-SBP-00001 Scheme Base Plans Section 3 Sheet 2 of 19 ULE90130-03-SBP-00002 Scheme Base Plans Section 3 Sheet 3 of 19 ULE90130-03-SBP-00003 Scheme Base Plans Section 3 Sheet 4 of 19 ULE90130-03-SBP-00004 Scheme Base Plans Section 3 Sheet 5 of 19 ULE90130-03-SBP-00005 Scheme Base Plans Section 3 Sheet 6 of 19 ULE90130-03-SBP-00006 Scheme Base Plans Section 3 Sheet 7 of 19 ULE90130-03-SBP-00007 Scheme Base Plans Section 3 Sheet 8 of 19 ULE90130-03-SBP-00008 Scheme Base Plans Section 3 Sheet 9 of 19 ULE90130-03-SBP-00009 Scheme Base Plans Section 3 Sheet 10 of 19 ULE90130-03-SBP-00010 Scheme Base Plans Section 3 Sheet 11 of 19 ULE90130-03-SBP-00011 Scheme Base Plans Section 3 Sheet 12 of 19 ULE90130-03-SBP-00012 Scheme Base Plans Section 3 Sheet 13 of 19 ULE90130-03-SBP-00013 Scheme Base Plans Section 3 Sheet 14 of 19 ULE90130-03-SBP-00014 Scheme Base Plans Section 3 Sheet 15 of 19 ULE90130-03-SBP-00015 Scheme Base Plans Section 3 Sheet 16 of 19 ULE90130-03-SBP-00016 Scheme Base Plans Section 3 Sheet 17 of 19 ULE90130-03-SBP-00017 ULE90130-SW-RRR-00030 PBH00005860 0003 DRAWING LIST - PRELIMINARY DESIGN PHASE ISSUE TO CEC 11 JULY 2006 Scheme Base Plans Section 3 Sheet 18 of 19 ULE90130-03-SBP-00018 Scheme Base Plans Section 3 Sheet 19 of 19 ULE90130-03-SBP-00019 Scheme Base Plans Section 5 Sheet 1 of 26 ULE90130-05-SBP-00001 Scheme Base Plans Section 5 Sheet 2 of 26 ULE90130-05-SBP-00002 Scheme Base Plans Section 5 Sheet 3 of 26 ULE90130-05-SBP-00003 Scheme Base Plans Section 5 Sheet 4 of 26 ULE90130-05-SBP-00004 Scheme Base Plans Section 5 Sheet 5 of 26 ULE90130-05-SBP-00005 Scheme Base Plans Section 5 Sheet 6 of 26 ULE90130-05-SBP-00006 Scheme Base Plans Section 5 Sheet 7 of 26 ULE90130-05-SBP-00007 Scheme Base Plans Section 5 Sheet 8 of 26 ULE90130-05-SBP-00008 Scheme Base Plans Section 5 Sheet 9 of 26 ULE90130-05-SBP-00009 Scheme Base Plans Section 5 Sheet 10 of 26 ULE90130-05-SBP-00010 Scheme Base Plans Section 5 Sheet 11 of 26 ULE90130-05-SBP-00011 Scheme Base Plans Section 5 Sheet 12 of 26 ULE90130-05-SBP-00012 Scheme Base Plans Section 5 Sheet 13 of 26 ULE90130-05-SBP-00013 Scheme Base Plans Section 5 Sheet 14 of 26 ULE90130-05-SBP-00014 Scheme Base Plans Section 5 Sheet 15 of 26 ULE90130-05-SBP-00015 Scheme Base Plans Section 5 Sheet 16 of 26 ULE90130-05-SBP-00016 Scheme Base Plans Section 5 Sheet 17 of 26 ULE90130-05-SBP-00017 Scheme Base Plans Section 5 Sheet 18 of 26 ULE90130-05-SBP-00018 Scheme Base Plans Section 5 Sheet 19 of 26 ULE90130-05-SBP-00019 Scheme Base Plans Section 5 Sheet 20 of 26 ULE90130-05-SBP-00020 Scheme Base Plans Section 5 Sheet 21 of 26 ULE90130-05-SBP-00021 Scheme Base Plans Section 5 Sheet 22

View Full Text

Details

  • File Type
    pdf
  • Upload Time
    -
  • Content Languages
    English
  • Upload User
    Anonymous/Not logged-in
  • File Pages
    29 Page
  • File Size
    -

Download

Channel Download Status
Express Download Enable

Copyright

We respect the copyrights and intellectual property rights of all users. All uploaded documents are either original works of the uploader or authorized works of the rightful owners.

  • Not to be reproduced or distributed without explicit permission.
  • Not used for commercial purposes outside of approved use cases.
  • Not used to infringe on the rights of the original creators.
  • If you believe any content infringes your copyright, please contact us immediately.

Support

For help with questions, suggestions, or problems, please contact us