DREAM Ground Surveys for Pampanga River

DREAM Ground Surveys for Pampanga River

© University of the Philippines and the Department of Science and Technology 2015 Published by the UP Training Center for Applied Geodesy and Photogrammetry (TCAGP) College of Engineering University of the Philippines Diliman Quezon City 1101 PHILIPPINES This research work is supported by the Department of Science and Technology (DOST) Grants- in-Aid Program and is to be cited as: UP TCAGP (2015), DREAM Ground Survey for Pampanga River, Disaster Risk and Exposure Assessment for Mitigation (DREAM) Program, DOST Grants-In-Aid Program, 75 pp. The text of this information may be copied and distributed for research and educational purposes with proper acknowledgment. While every care is taken to ensure the accuracy of this publication, the UP TCAGP disclaims all responsibility and all liability (including without limitation, liability in negligence) and costs which might incur as a result of the materials in this publication being inaccurate or incomplete in any way and for any reason. For questions/queries regarding this report, contact: Engr. Louie P. Balicanta, MAURP Project Leader, Data Validation Component, DREAM Program University of the Philippines Diliman Quezon City, Philippines 1101 Email: [email protected] Enrico C. Paringit. Dr. Eng. Program Leader, DREAM Program University of the Philippines Diliman Quezon City, Philippines 1101 E-mail: [email protected] National Library of the Philippines ISBN: 978-971-9695-51-6 Table of Contents 1 INTRODUCTION ......................................................................................................... 1 1.1 DREAM Program Overview .............................................................................. 2 1.2 Objectives and target outputs .......................................................................... 2 1.3 General methodological framework ................................................................ 3 2 The Pampanga River Basin .................................................................................... 5 3 DVC Methodology ..................................................................................................... 9 3.1 Pre-field Preparation .......................................................................................... 11 3.1.1 Preparation of Field Plan ........................................................................ 11 3.1.2 Collection of Reference Points .............................................................. 11 3.2 Field Surveys ..................................................................................................... 12 3.2.1 Control Survey ........................................................................................ 12 3.2.2 Cross-Section Survey .............................................................................. 13 3.2.3 Profile Surveys ........................................................................................ 14 3.2.4 Bathymetric Survey ................................................................................ 14 3.2.5 Hydrometric Survey ............................................................................... 15 3.2.6 Validation Points Acquisition Survey ..................................................... 16 3.3 Data Processing ................................................................................................ 18 3.3.1 Collection of Raw Data ........................................................................... 19 3.3.2 Data Processing ...................................................................................... 19 3.3.3 Filtering of Data ..................................................................................... 23 3.3.4 Final Editing ............................................................................................ 23 3.3.5 Output .................................................................................................... 23 4 Pampanga River Basin Survey ................................................................................. 25 4.1 Control Survey ................................................................................................... 26 4.2 Cross-section Survey ......................................................................................... 29 4.3 Profile Survey ..................................................................................................... 32 4.4 Bathymetric Survey .......................................................................................... 32 4.5 Hydrometric Survey .......................................................................................... 36 4.5.1 AWLS Survey ........................................................................................... 45 4.5.1.1 Cross-section Survey ............................................................. 46 4.5.1.2 Flow Measurement ............................................................... 50 A. Sensor graph of Sibut Bridge ........................................... 54 B. Sensor graph of Ilog-Baliwag Bridge ................................ 56 C. Sensor graph of Vega Bridge-1 .......................................... 58 D. Sensor graph of Cabu Bridge ........................................... 60 E. Sensor graph of Sicsican Bridge ....................................... 62 F. Sensor graph of Tabuating Bridge .................................... 64 G. Sensor graph of Sta. Rosa Bridge .................................... 66 ANNEX A. PROBLEMS ENCOUNTERED AND RESOLUTIONS APPLIED ............................... 70 ANNEX B. LIST OF EQUIPMENT AND INSTRUMENTS ......................................................... 71 ANNEX C. THE SURVEY TEAM .............................................................................................. 73 ANNEX D. NAMRIA CERTIFICATION ..................................................................................... 74 List of Figures Figure 1. The General Methodological Framework of the Program ............................. 3 Figure 2. The Pampanga River Basin Location Map .................................................... 6 Figure 3. Pampanga River Basin Soil Map .................................................................... 7 Figure 4. Pampanga River Basin Land Cover Map ....................................................... 7 Figure 5. DVC Main Activities ........................................................................................ 10 Figure 6. DVC Field Activities ........................................................................................ 12 Figure 7. Flow Chart for Stage-Discharge Correlation Computation .............................. 16 Figure 8. Setup for GNSS Surveys ................................................................................ 17 Figure 9. DVC Data Processing Methodology .............................................................. 18 Figure 10. Illustration of Echo Sounder and GPS rover set-up ...................................... 20 for Bathymetric survey Figure 11. Location of control points for Pampanga River Survey ............................... 27 Figure 12. Static GNSS observation at BLN-3062 .......................................................... 28 Figure 13. RTK Base set-up in Brgy. Cupang Arayat, Pampanga ................................... 29 Figure 14. Cross-section teams conducting RTK GNSS survey ..................................... 30 Figure 15. Cross-section data of Pampanga River ......................................................... 31 Figure 16. MDL Dynascan™ installed on one end of the boat ...................................... 32 for the river bank profile surveys of Pampanga River Figure 17. Bathymetric survey setup ............................................................................. 33 Figure 18. Bathymetry team with the Special forces personnel .................................. 34 Figure 19. Bathymetric data in Pampanga River ........................................................... 35 Figure 20. Relationship between velocity and stage in ................................................ 36 Brgy. Camba, Arayat Pampanga Figure 21. Relationship between velocity and rainfall .................................................. 37 in Brgy. Camba, Arayat Pampanga Figure 22. Relationship between velocity and stage ................................................... 37 in Brgy. CAmba, Arayat, Pampanga Figure 23. HQ curve in Brgy. Camba, Arayat, Pampanga .............................................. 38 Figure 24. Relationship between Rainfall and Stage ..................................................... 38 in Brgy. Pulong Visitas, Apalit, Pampanga Figure 25. Relationship between Velocity and Rainfall ................................................. 39 in Brgy. Pulong Visitas, Apalit, Pampanga Figure 26. Relationship between Velocity and Stage .................................................... 39 in Brgy. Pulong Visitas, Apalit, Pamnpanga Figure 27. Stage-discharge Relation along Pampanga River ........................................ 40 in Brgy. Pulong Visitas, Apalit, Pampanga Figure 28. Relationship between Rainfall and Stage ..................................................... 40 in Brgy. San Francisco, Macabebe, Pampanga Figure 29. Relationship between Velocity and Rainfall ................................................. 41 in Brgy. San Francisco, Macabebe, Pampanga Figure 30. Relationship between Velocity and Stage .................................................... 41 in Brgy. San Francisco, Macabebe,

View Full Text

Details

  • File Type
    pdf
  • Upload Time
    -
  • Content Languages
    English
  • Upload User
    Anonymous/Not logged-in
  • File Pages
    87 Page
  • File Size
    -

Download

Channel Download Status
Express Download Enable

Copyright

We respect the copyrights and intellectual property rights of all users. All uploaded documents are either original works of the uploader or authorized works of the rightful owners.

  • Not to be reproduced or distributed without explicit permission.
  • Not used for commercial purposes outside of approved use cases.
  • Not used to infringe on the rights of the original creators.
  • If you believe any content infringes your copyright, please contact us immediately.

Support

For help with questions, suggestions, or problems, please contact us