The Special Deputy Collector (LA),GNSS, Unit-III, Muddanur Has

The Special Deputy Collector (LA),GNSS, Unit-III, Muddanur Has

KADAPA DISTRICT GAZETTE (EXTRA-ORDINARY) PUBLISHED BY AUTHORITY Gazette No.64 KADAPA 06-10-2020 PROCEEDINGS OF THE SPECIAL COLLECTOR (L.A), GNSS., KADAPA PRESENT::SRI D.SATISH CHANDRA, M.Com., L.L.B., Ref.No.C/77/2017 Dated:06/10/2020 Notification by the Government GOVERNMENT OF ANDHRA PRADESH Order for Extension of time U/s 25 of the RFCT LARR Act, 2013 The Special Deputy Collector (LA),GNSS, Unit-III, Muddanur has requested for extension of time for a period of Twelve months U/s 25 of the RFCT LARR Act, 2013 as he could not complete the land acquisition process in P.Ananthapuram, Bukkapatnam (Vs) of Kondapuram and D.Bramhanapalli (V) of Muddanur (M) Proposed for foreshore area submersion under Gandikota Reservoir (+209 Contour) in the following circumstances; It is further submitted that, basing on the requisition of the Executive Engineer, SKD GNSSP Division, Kadapa to an extent of Ac.47.05 cents, for foreshore area submersion under Gandikota Reservoir (+209 Contour), the Special Deputy Collector (L.A), GNSS Unit-III, Muddanur has submitted Preliminary Notification and Declaration proposals for approval and the same was approved by the Special Collector (L.A), GNSS Kadapa vide reference 1st and 2nd read above. Further, the Special Deputy Collector (L.A), GNSS Unit-III, Muddanur has submitted Preliminary Valuation proposal vide his office Ref.No.A/131/2017, Dt:30.11.2018 for approval and the same was also approved in respect of the lands covering to an extent of Ac.47.05 cents of vide references 3rd read above. It is submitted that the Special Deputy Collector (L.A), GNSS Unit-III, Muddanur, has requested for extension of time for a period of Twelve months i.e., from 08.10.2019 to 08.10.2020 and the same was approved by this office vide ref. 5th cited. D:\All 2015 files\Gazettes\All 2020 Gazettes\October to December\Time Extension\Ref.No.C_77_18 Bukkapatnam P.Ananthapuram etc villages.docx Further, the Special Deputy Collector (L.A), GNSS Unit-III, Muddanur has reported that an award has to be passed. Hence she requested for extension of the time for a period of twelve months i.e., 08.10.2019 to 08.10.2020, U/s 25 of the RFCT LARR Act, 2013 for completion of land acquisition proceedings as the Negotiations with the ryots could not be completed. “It is provided under section 25 of RFCT LARR Act, 2013 read as follows; “The Collector shall make an award within a period of twelve months from the date of publication of the Declaration of under Section 19 and if no award made within that period, the entire proceedings for the acquisition of land shall lapse: Provided that the appropriate Government shall have the power to extend the period of twelve months if in its opinion, circumstances exist justifying the same: Provided further that any such decision to extend the period shall be recorded in writing and the same shall be notified and be uploaded on the website of the authority concerned”. Further, it is to submit that the Government vide G.O.Ms.No.34 Water Resources (R&R-A2) Department dt: 15.04.2015 has delegated the powers of appropriate Government under section 3(e) of LARR Act,2013 to the Special Collectors (L.A) on behalf of the District Collector in the light of the New Land Acquisition Act i.e. “The Right to Fair Compensation and Transparency in Land Acquisition Rehabilitation and Resettlement Act,2013 and Rules”. In the above circumstances reported by the Special Deputy Collector (L.A), GNSS Unit-III, Muddanur in the reference 5th read above, and the powers conferred by the Government in the reference 4th read above, I hereby extend the time for a period of twelve months i.e., from 08.10.2020 to 07.10.2021. The Special Deputy Collector (L.A), GNSS Unit-III, Muddanur is also directed to take necessary action for completion of the entire land acquisition process proposed for foreshore area submersion under Gandikota Reservoir (+209 Contour) within the extended period without fail, as there shall be no further extension of period in this regard. D:\All 2015 files\Gazettes\All 2020 Gazettes\October to December\Time Extension\Ref.No.C_77_18 Bukkapatnam P.Ananthapuram etc villages.docx The A2-Assistant is hereby instructed to take immediate necessary action for uploading the proceedings on the official website concerned without fail. Note: This notification is uploaded in official website of YSR Kadapa District for publicity http://kadapa.ap.gov.in. Sd/- D.Satish Chandra, Special Collector (LA), G.N.S.S.,Kadapa. D:\All 2015 files\Gazettes\All 2020 Gazettes\October to December\Time Extension\Ref.No.C_77_18 Bukkapatnam P.Ananthapuram etc villages.docx .

View Full Text

Details

  • File Type
    pdf
  • Upload Time
    -
  • Content Languages
    English
  • Upload User
    Anonymous/Not logged-in
  • File Pages
    3 Page
  • File Size
    -

Download

Channel Download Status
Express Download Enable

Copyright

We respect the copyrights and intellectual property rights of all users. All uploaded documents are either original works of the uploader or authorized works of the rightful owners.

  • Not to be reproduced or distributed without explicit permission.
  • Not used for commercial purposes outside of approved use cases.
  • Not used to infringe on the rights of the original creators.
  • If you believe any content infringes your copyright, please contact us immediately.

Support

For help with questions, suggestions, or problems, please contact us