Manayunk Trail Bridge Presentation

Manayunk Trail Bridge Presentation

Manayunk Trail Bridge • Project Update • Background • Funding • Timeline • Maintenance Agreement • Recommendation Background • Township has worked to extend the CHT across the Manayunk Bridge into Philadelphia with: – City of Philadelphia – Montgomery County – Manayunk Development Corp. (MDC) – PennDOT – Septa – DVRPC Background • Manayunk Bridge Trail viewed by regional funders as necessary link to creating a continuous, paved trail from Philadelphia to Valley Forge and beyond (Schuylkill River Trail- SRT). • Lower Merion section of the trail would by- pass Manayunk by utilizing the Manayunk and Pencoyd bridges and the CHT. Background • Township awarded $40,000 DVRPC planning grant to determine feasibility of linking the two bridges via a trail through the steeply sloped Connelly property. • In 2012 Lower Merion negotiated an amendment to its lease with Septa for the CHT to extend the trail approximately one-third mile across the surface of the Manayunk Bridge. Background • As with original lease and two previous amendments, ultimate responsibility for the trail rests with the Township. • In 2012 Philadelphia negotiated its own lease agreement with Septa for the Ivy Ridge Trail, that will link to the Manayunk Bridge and the SRT. • City also agreed to re-allocate $1.3 million in PCTI Funds that were awarded to the City for the trail’s construction. Background • DVRPC and William Penn Foundation awarded MDC $450,000 for the completion of design and construction documents for the bridge trail. • In 2012, representatives from many agencies worked with DVRPC, MDC and the consulting team of Whitman, Requardt & Associates to develop the design and construction documents. Background • Manayunk Bridge Trail Partners: – Lower Merion – Philadelphia – MDC – Septa – DVRPC – PA Bicycle Coalition – PA Environmental Council Funding • $1.3 M – Philadelphia (PennDOT PCTI) $1.1 M – Philadelphia (PennDOT PCTI) $0.5 M – Lower Merion (DCNR) $.25 M – Lower Merion (Capital) $.20 M – Montgomery County (CMAQ) ----------------------------------------------------------------- $3.35 M – Committed $3.60 M – Estimated necessary to advertise Funding • $250,000 Funding gap $190,000 construction $60,000 – construction inspection • City of Philadelphia applying for $250,000 DVRPC Regional Trails grant to make up funding gap. • June 2013: Award notification Project Schedule • June 2013: Upon notice of grant award; project will proceed. • Construction anticipated to begin in late 2013 and will extend into 2014. Maintenance Agreement • Concurrent with the design process, the Township and the City worked together to develop a joint agreement for shared maintenance of the trail once completed. • Township’s goal: – Keep maintenance responsibilities and tasks consistent with those currently performed on the CHT. Maintenance Agreement • Term of agreement the same as CHT lease (initially 30 years). • Identifies various tasks and responsibilities and the party responsible for completing them. • Requires both parties to jointly: – Conduct annual inspection of the bridge trail – Complete annual review of agreement – Maintain maintenance records for five years Tasks & Responsibilities Lower Merion Philadelphia • Signage • Daily opening and • Trash collection closing of gates • Graffiti removal • Railing repairs • Unanticipated repairs- • Trail surface repairs Shared • Unanticipated repairs- • Significant repairs / Shared improvements- Shared • Significant repairs / improvements - Shared Tasks & Responsibilities • In 2012, staff estimates 200 man hours (25 days) collecting trash, cleaning graffiti along CHT. • 500 man hours (63 days) to complete other maintenance activities, including, but not limited to: – Lock and gate repairs – Material delivery, debris and brush collection in support of workdays – Trail repairs – Herbicide applications Tasks & Responsibilities • Labor estimates do not include mowing, which was completed by County Prison work crews and community service workers. • Once bridge trail is open, estimate trash collection will add approximately 15 – 30 minutes per collection. Tasks & Responsibilities • Graffiti has become more of a concern on CHT. • P & R working with Police and FOCHT to address issue. • Estimate 2 employees @ 1 day per month to remove graffiti on entire trail, including the bridge. • These are estimates…until the trail is open, cannot know the full impact on P & R’s operation. • Bridge trail was designed with maintenance in mind. Recommendation • Recommend that Board of Commissioners authorize execution of this agreement. • Maintenance agreement a necessary part of PUC review. • PUC review must be completed before project can proceed. End of Presentation .

View Full Text

Details

  • File Type
    pdf
  • Upload Time
    -
  • Content Languages
    English
  • Upload User
    Anonymous/Not logged-in
  • File Pages
    30 Page
  • File Size
    -

Download

Channel Download Status
Express Download Enable

Copyright

We respect the copyrights and intellectual property rights of all users. All uploaded documents are either original works of the uploader or authorized works of the rightful owners.

  • Not to be reproduced or distributed without explicit permission.
  • Not used for commercial purposes outside of approved use cases.
  • Not used to infringe on the rights of the original creators.
  • If you believe any content infringes your copyright, please contact us immediately.

Support

For help with questions, suggestions, or problems, please contact us