MHI Crystal Mover Overview

MHI Crystal Mover Overview

MHI’SMHI’S INNOVATIVEINNOVATIVE TRANSITTRANSIT SYSTEMSSYSTEMS 1 • Leading manufacturer of heavy machinery established in 1884 • Broad range of products & services in diverse worldwide markets • US$21.6 Billion revenue with 60,000 employees • 9 Manufacturing and 6 R&D Centers • Extensive experience in transit system design, development, construction, operations, and maintenance 2 TransitTransit PortfolioPortfolio 3 MHI’sMHI’s Transportation Transportation SystemsSystems (Japan) (Japan) Kobe Port Island Kobe Rokko Island Tokadai Peach Liner Saitama LIM Train A-5 HiroshimaHiroshima Astram N.T. Line A-6Tokyo Tokyo Yurikamome Rinkai Line Tokyo Osaka Hiroshima Nagoya Senogawa Sky Rail B-3Chiba Chiba Monorail Monorail Okinawa CVS Higashiyama Monorail Yamanashi Maglev B-2Shonan Shonan Monorail Monorail Kanazawa Seaside 4 MHI’sMHI’s Transportation Transportation SystemsSystems (International) (International) Taiwan High-Speed Incheon Airport IAT Railway Hong Kong Airport Washington Dulles APM Airport APM Manila MRT Line 1 Washington D.C. Seoul Dubai International Atlanta Airport APM Miami Miami Airport APM Hong Kong Taiwan Manila MRT Line 2 Manila MRT Line 3 Manila Singapore Dubai Metro LRT Sengkang / Punggol Atlanta Airport APM Singapore Changi LRT Airport PMS 5 REPRESENTATIVEREPRESENTATIVE PROJECTSPROJECTS 6 AutomatedAutomated PeoplePeople MoversMovers –– in in UrbanUrban ContextContext Kobe New Transit System, Japan New Tokyo Waterfront Transit, Japan Sengkang/Punggol LRT, Singapore Astram Line, Hiroshima, Japan CrystalCrystal Mover Mover 7 Capacity: 17,000 passengers/hour/direction Guideway:12 km (7.5 miles) dual lane Number of Stations: 12 Number of Vehicles: 126 Capacity: 4,800 passengers/hour/direction Guideway:22.5 km (14 miles) dual lane Number of Stations: 33 Number of Vehicles: 41 AutomatedAutomated PeoplePeople MoversMovers –– at at AirportsAirports Hong Kong Airport Incheon Airport, Korea Changi Airport, Dubai Airport, U.A.E. Singapore 10 CrystalCrystal Movers Movers the the World World Over Over AutomatedAutomated PeoplePeople MoversMovers –– at at AirportsAirports Dulles Airport Miami Airport Atlanta Airport CrystalCrystal Movers Movers at at U.S. U.S. Airports Airports11 Completion: 2008 Capacity: 5,340 passengers/hour/direction Guideway: 0.9 km (0.6 miles) dual lane 12 Number of Stations: 2 Number of Vehicles: 3 Completion: 2006 Capacity: 2300 passengers/hour/direction Guideway:6.4 km (4.0 miles) dual lane 13 Number of Stations: 7 Number of Vehicles: 16 DubaiDubaiDubaDubaii Metro, Metro,Metro,Metro, U.A.U.A.U.U.A.EA.EEE.... LLOONGNGESTEST FFUULLLLYY AUTOMAUTOMAATETED,D, DRDRIIVVERERLLEESSSS pupubliblicc trtrananssiitt ssyysstteemm iinn ththee woworldrld.. PPhhasasee 11 PPhhaasese 22 PPhhasasee 11 PPhhaassee 22 RReedd LLiinene GGrreeeenn LiLinene RReedd LiLinene GGrreeeenn LiLinene EElleevvatateded 4477..44 kkmm ((229.9.55 mmiillee)) 116.6.00 kkmm ((99..99 kkmm)) EElleevvatateded 4477..44 kmkm ((229.9.55 mmiillee)) 116.6.00 kmkm ((99..99 kmkm)) raackck LeLennggtthh UUnnddeergrgrorouunndd 44..77 kkmm ((22.9.9 mimillee)) 77.8.8 kkmm (4(4..88 mimillee)) TTrraackck LLeennggtthh UUnnddeergrgrorouunndd 44..77 kkmm (2(2..99 mimillee)) 77..88 kkmm (4(4.8.8 mimillee)) TToottaall 552.2.11 kkmm ((332.2.44 mmiillee)) 2233..88 kkmm ((1144..77 mmiillee)) TToottaall 552.2.11 kmkm ((332.2.44 mmiillee)) 2233..88 kmkm ((1144..77 mmiillee)) EElleevvatateded 2424 1122 EElleevvatateded 2424 1122 uummbberer ofof SSttatatiioonnss UUnnddeergrgrorouunndd 44 66 NNuummbeberr ofof SSttaattiioonnss UUnnddeergrgrorouunndd 44 66 ToTottaall 2288 1188 ToTottaall 2288 1188 9999 ccaarrss eeeett SSiizzee ((ccarars)s) 222200 cacarrss 9999 ccaarrss 1414 FFlleeetet SSiizzee ((ccararss)) 222200 ccaarrss ++ 9090 ccaarrss ((ffoorr RReedd LiLinnee)) ++ 9090 cacarrss ((foforr RReedd LiLinnee)) GreenGreen MoverMover Max,Max, HiroshimaHiroshima City,City, JapanJapan Guideway: 16.1 km (10 miles) Number of Stations: 40 15 Newly Developed 100% Low-Floor Light Rail Technology TaiwanTaiwan HighHigh SpeedSpeed RailwayRailway System integrator of all E&M systems, including trackwork. Guideway: 345 km (214 miles) Number of Stations: 11 16 ENDEND 17.

View Full Text

Details

  • File Type
    pdf
  • Upload Time
    -
  • Content Languages
    English
  • Upload User
    Anonymous/Not logged-in
  • File Pages
    17 Page
  • File Size
    -

Download

Channel Download Status
Express Download Enable

Copyright

We respect the copyrights and intellectual property rights of all users. All uploaded documents are either original works of the uploader or authorized works of the rightful owners.

  • Not to be reproduced or distributed without explicit permission.
  • Not used for commercial purposes outside of approved use cases.
  • Not used to infringe on the rights of the original creators.
  • If you believe any content infringes your copyright, please contact us immediately.

Support

For help with questions, suggestions, or problems, please contact us