Upcoming Space Shuttle Missions Updated January 30, 2003 (Replaces January 27) Compiled by Bruce Buckingham, KSC PA STS MISSION No

Upcoming Space Shuttle Missions Updated January 30, 2003 (Replaces January 27) Compiled by Bruce Buckingham, KSC PA STS MISSION No

Upcoming Space Shuttle Missions Updated January 30, 2003 (replaces January 27) Compiled by Bruce Buckingham, KSC PA STS MISSION No. STS-107 STS-114 STS-115 STS-116 (nth Shuttle flight) (113) (114) (115) (116) Orbiter Columbia/OV-102 Atlantis/OV-104 Endeavour/OV-105 Atlantis/OV-104 (nth flight of orbiter) (28) (27) (20) (28) Primary Mission SPACEHAB, FREESTAR 17th ISS flight (ULF1) -- 18th ISS flight (12A) -- 19th ISS flight (12A.1) -- ITS MPLM, crew rotation P3/P4 arrays P5, SPACEHAB, crew rotation **Target Launch Date Jan. 16, 2003, 10:39 a.m. March 1, 2003 May 23, 2003 July 24, 2003 (Pad) EST (39A) (39B) (39B) (39B) Estimated Launch Window 2 hours, 30 minutes 5-10 minutes 5-10 minutes 5-10 minutes KSC Landing Date Feb. 1, *9:16 a.m. EST March 13 June 3 Aug. 4 Mission Duration 16 days 12 days 10 days 10 days Inclination/Orbital Insertion 39 degrees 51.6 degrees 51.6 degrees 51.6 degrees Altitude 150 nautical miles 122 nautical miles 122 nautical miles 122 nautical miles Cdr: Rick Husband (2) Cdr: Eileen Collins (4) Cdr: Brent Jett (4) Cdr: Terrence Wilcutt (5) Plt: William “Willie” McCool (1) Plt: James Kelly (2) Plt: Christopher Ferguson (1) Plt: William Oefelein (1) PC: Michael Anderson (2) MS: Soichi Noguchi (NASDA) (1) MS: Joseph Tanner (4) MS: Robert Curbeam (3) Crew (Shuttle flight number) MS: Kalpana Chawla (2) MS: Stephen Robinson (3) MS: Daniel Burbank (2) MS: Christer Fuglesang (ESA) (1) (Size) MS: David Brown (1) MS: Steven MacLean (CSA) (2) MS: Laurel Clark (1) ISS-7: Cdr: Yuri Malenchenko MS: Heidemarie Stefanyshyn- ISS-8: Cdr: Michael Foale (5) PS: Ilan Ramon (ISA) (1) (up) (RSA) (2) Piper (1) (up) Valery Tokarev (RSA) (2) Alexander Kaleri (RSA) (1) William McArthur (4) Edward Lu (3) (6) ISS-7: Cdr: Yuri Malenchenko ISS-6: Cdr: Ken Bowersox (5) (down) (RSA) (2) (down) Nikolai Budarin (RSA) (2) Alexander Kaleri (RSA) (1) (7) Donald Pettit (1) Edward Lu (3) (7) (7) ** Target launch and landing dates are based on KSC assessments. Official launch dates are set at the Flight Readiness Review. * Change from earlier update All Times are Eastern ASI = Italian Space Agency Cdr = Commander CNES = French Space Agency CSA = Canadian Space Agency ESA = European Space Agency ISA = Israel Space Agency ISS = International Space Station ITS = Integrated Truss Structure segment MPLM = Multi-Purpose Logistics Module MS = Mission Specialist MT = Mobile Transporter NASDA = National Space Development Agency of Japan NET = no earlier than OV = Orbiter Vehicle PC = Payload Commander Plt = Pilot PS = Payload Specialist RSA = Russian Aviation and Space Agency TBD = to be determined UF = utility/utilization flight ULF = utilization and logistics flight U/R = under review Upcoming Space Shuttle Missions – page 2 Updated January 30, 2003 STS MISSION No. STS-117 STS-118 STS-119 STS-120 (nth Shuttle flight) (117) (118) (119) (120) Orbiter Endeavour/OV-105 Columbia/OV-102 Atlantis/OV-104 Endeavour/OV-105 (nth flight of orbiter) (21) (29) (29) (22) Primary Mission 20th ISS flight (13A) -- S3/S4 21st ISS flight (13A.1) -- ITS 22nd ISS flight (15A) -- ITS 23rd ISS flight (10A) -- U.S. arrays S5, SPACEHAB S6, fourth and final solar Node 2 arrays, crew rotation **Target Launch Date Oct. 2, 2003 Nov. 13, 2003 NET January 2004 February 2004 (Pad) (39A) (39B) (39A) (TBD) Estimated Launch Window 5-10 minutes 5-10 minutes 5-10 minutes 5-10 minutes KSC Landing Date Oct. 12 Nov. 24 TBD TBD Mission Duration 10 days 11 days 11 days 10 days Inclination/Orbital Insertion 51.6 degrees 51.6 degrees 51.6 degrees 51.6 degrees Altitude 122 nautical miles 122 nautical miles 122 nautical miles 122 nautical miles Cdr: Frederick Sturckow (3) Cdr: Scott Kelly (2) Cdr: Steven Lindsey (4) Cdr: James Halsell (6) Plt: Mark Polansky (2) Plt: Charles Hobaugh (2) Plt: Mark Kelly (2) Plt: Alan Poindexter (1) Crew (Shuttle flight number) MS: James Reilly (3) MS: Scott Parazynski (5) MS: Michael Gernhardt (5) MS: Wendy Lawrence (4) (Size) MS: Richard Mastracchio (2) MS: Dafydd Williams (CSA) (2) MS: Carlos Noriega (3) MS: Piers Sellers (2) MS: Joan Higginbotham (1) MS: Barbara Morgan (1) MS: Stephanie Wilson (1) MS: Patrick Forrester (2) MS: Lisa Nowak (1) ISS-9: Cdr: Gennady Padalka MS: Michael Foreman (1) (up) (RSA) (1) (6) (6) Michael Fincke (1) Oleg Kononenko (RSA) (1) (6) ISS-8: Cdr: Michael Foale (5) (down) Valery Tokarev (RSA) (2) William McArthur (4) (7) ** Target launch and landing dates are based on KSC assessments. Official launch dates are set at the Flight Readiness Review. * Change from earlier update All Times are Eastern ASI = Italian Space Agency Cdr = Commander CNES = French Space Agency CSA = Canadian Space Agency ESA = European Space Agency ISA = Israel Space Agency ISS = International Space Station ITS = Integrated Truss Structure segment MPLM = Multi-Purpose Logistics Module MS = Mission Specialist MT = Mobile Transporter NASDA = National Space Development Agency of Japan NET = no earlier than OV = Orbiter Vehicle PC = Payload Commander Plt = Pilot PS = Payload Specialist RSA = Russian Aviation and Space Agency TBD = to be determined UF = utility/utilization flight ULF = utilization and logistics flight U/R = under review.

View Full Text

Details

  • File Type
    pdf
  • Upload Time
    -
  • Content Languages
    English
  • Upload User
    Anonymous/Not logged-in
  • File Pages
    2 Page
  • File Size
    -

Download

Channel Download Status
Express Download Enable

Copyright

We respect the copyrights and intellectual property rights of all users. All uploaded documents are either original works of the uploader or authorized works of the rightful owners.

  • Not to be reproduced or distributed without explicit permission.
  • Not used for commercial purposes outside of approved use cases.
  • Not used to infringe on the rights of the original creators.
  • If you believe any content infringes your copyright, please contact us immediately.

Support

For help with questions, suggestions, or problems, please contact us