Virginia Railway Express System Plan 2040 Update

Virginia Railway Express System Plan 2040 Update

VIRGINIA RAILWAY EXPRESS SYSTEM PLAN 2040 UPDATE Citizens Transportation Advisory Group Meeting September 16, 2015 1 VRE SYSTEM PLAN 2040 Identifies needs for next 25 years Identifies projects, initiatives, funding, partners Provides for phased expansion Moves VRE from commuter rail to REGIONAL RAIL . Addresses growing markets ‒ Peak commuting to DC/NoVA . Addresses new markets ‒ Reverse peak/off-peak travel 2 PROJECTED GROWTH IN RIDERSHIP System Plan 2040 Current Trend 3 Present AM Peak Boardings & Alightings RIDERSHIP . Presently 19,000 trips . Destination Stations (L’Enfant, Crystal City, Union Station, Alexandria) Key Attributes: ‒ Proximity to offices (especially Pentagon, Roslyn) ‒ Connections to Metro Boardings . Origin Stations Alightings Key Attributes: ‒ Parking ‒ Population ‒ Highway Access 4 Present AM Peak Projected 2040 AM Peak Boardings & Alightings BoardingsL’Enfant & Alightings Crystal City Union Station Alexandria • Destination Stations • Proximity to offices • Connections to Metro Boardings • Rosslyn, PentagonBoardings Alightings Alightings • Origin Stations • Parking • Population • Accessibility 5 Present AM Peak Projected Change in Boardings & Alightings 2040L’Enfant AM Peak Boardings Crystal City Union Station Alexandria • Destination Stations • Proximity to offices • Connections to Metro Change in Boardings Boardings • Rosslyn, Pentagon Alightings Less than 25% increase • Origin Stations 25% to 50% increase • Parking More than 50% increase • Population Alightings • Accessibility 6 VRE SYSTEM PLAN 2040 Adding rail capacity is the key PHASE 1: Run Longer Trains . More railcars . More station parking . More train storage tracks . Second & longer platforms PHASE 2 & 3: Run More Trains Earn additional train slots through capacity improvements . Third/fourth track on CSXT . Long Bridge . More parking, railcars Gainesville-Haymarket Extension 7 CURRENTLY ACTIVE 1 FAMPO AREA PROJECTS MAP LEAD PROJECT DESCRIPTION # AGENCY ❶ ADDITIONAL TRACK (PC to ND) VaDRPT ❷ BROOKE STATION IMPROVEMENTS PP VRE* 3 2 # ❸ ADDITIONAL TRACK (ND to HA) VaDRPT # # ❹ LEELAND RD STATION IMPROVEMENTS PP VRE* 4 ❺ FREDERICKSBURG STATION IMPROVEMENTS VRE* 5 ❻ ADDITIONAL TRACK (HA to XR) VRE SPOTSYLVANIA STATION PLATFORM VRE* ❼ SPOTSYLVANIA SPOTSYLVANIA PARKING LOT COUNTY 6 ❽ LIFECYCLE OVERHAUL & UPGRADE FACILITY VRE 7 8 ❾ CROSSROAD MSF STORAGE EXPANSION VRE 9 PP – INCLUDED IN PENTA-PLATFORM PROGRAM * – NON-SYSTEM PROJECT (Jurisdiction responsible for local share of costs) 8 SPOTSYLVANIA STATION IMPROVEMENTS UNDER CONSTRUCTION . Service: VRE . Number of Platforms: 1 . Platform Length(s): 680 feet (8 cars) . Parking: 1500 spaces 9 LEELAND ROAD STATION IMPROVEMENTS CURRENT CONDITIONS . Service: VRE . Number of Platforms: 1 . Platform Length(s): 405 feet (5 cars) . Parking: 997 spaces (pending loss of 156 spaces) 10 LEELAND ROAD STATION IMPROVEMENTS ALTERNATIVE 1 ALTERNATIVE 2 (NOT RECOMMENDED) (RECOMMENDED) PENDING CIP IMPROVEMENTS . Expand existing platform to 650 feet (8 cars) . Add 650-foot second platform (CSXT-VRE MOU requirement) . Estimated Costs: PE/FD: $1,400,000 Construction: $12,600,000 Total: $14,000,000 . Programmed Funding: PE/FD: REF15 $685,000 Construction: REF16 $2,700,000 REF17 $2,916,000 REF18 $2,700,000 CMAQ21 $262,000 Total: $9,264,300 . Unfunded: $4,735,70011 LEELAND ROAD STATION IMPROVEMENTS OTHER IMPROVEMENTS . Projected parking demand (2027) 1500 spaces (+503 spaces) – +659 spaces after 156 spaces lost to development – Requires structured parking . No cost estimate . No programmed funding Plan for surface parking expansion yields 1000 spaces, less than the 1500 spaces projected by demand. 12 BROOKE STATION IMPROVEMENTS CURRENT CONDITIONS . Service: VRE . Number of Platforms: 1 . Platform Length(s): 401 feet (5 cars) . Parking: 720 spaces 13 BROOKE STATION IMPROVEMENTS ALTERNATIVE 1 ALTERNATIVE 2 (RECOMMENDED) (NOT RECOMMENDED) PENDING CIP IMPROVEMENTS . Expand existing platform to 650 feet (8 cars) . Add 650-foot second platform (CSXT-VRE MOU requirement) . Estimated Costs: PE/NEPA/FD: $1,450,000 Construction: $13,100,000 Total: $14,650,000 . Programmed Funding: PE/FD: REF15 $685,800 Construction: REF16 $2,700,000 REF17 $2,916,000 REF18 $2,700,000 CMAQ21 $262,500 Total: $9,264,300 . Unfunded: $5,385,70014 BROOKE STATION IMPROVEMENTS OTHER IMPROVEMENTS . Projected parking demand (2025) 1175 spaces (+455 spaces) – Analysis needed to determine if expansion of surface parking will suffice – Structured parking may be required . No cost estimate . No programmed funding Plan for surface parking expansion yields 1000 spaces, less than the 1500 spaces projected by demand. 15 FREDERICKSBURG STATION IMPROVEMENTS CURRENT CONDITIONS . Service: VRE, Amtrak, FRED . Number of Platforms: 2 . Platform Length(s): 420/517 feet (5/7 cars) . Parking: 810 spaces (236 leased/200 gravel) 16 FREDERICKSBURG STATION IMPROVEMENTS PENDING CIP IMPROVEMENTS PLATFORMS PARKING . Expanding Track 2 platform from . Projected parking demand (2027) 5 to 7 car-lengths 1100 spaces (+600 spaces) – Funded through State of – 850 space garage Good Repair funds – Pave Lot G (150 surface spaces) – Work to begin in by the end – Eliminate leased surface lots of 2015 . Estimated Costs: – Cost of extending both PE/FD: $3,000,000 platforms to 8 car-lengths Construction: $27,000,000 cost-prohibitive Total: $30,000,000 . Programmed Funding: PE/FD: CMAQ21 $517,000 Construction: Total: $517,000 . Unfunded: $29,483,000 17 UPCOMING ACTIVITIES . Near Term – Execute platform extension at Fredericksburg – Execute PE and NEPA for platform improvements shortfalls at Brooke and Leeland Road (Penta-Platforms) – Identify sources to fund platform improvements shortfalls at Brooke and Leeland Road – Analyze how best to optimize parking and traffic for Fredericksburg . Mid-Term – Develop parking strategy for Leeland and Brooke (surface vs. garage) – Execute PE and NEPA for Fredericksburg parking expansion . Long Term – Expand platforms to 10 cars as needed – Execute parking expansion at Brooke, Leeland Road and Fredericksburg 18 T. R. Hickey Chief Development Officer 703-838-5428 [email protected] 19 .

View Full Text

Details

  • File Type
    pdf
  • Upload Time
    -
  • Content Languages
    English
  • Upload User
    Anonymous/Not logged-in
  • File Pages
    19 Page
  • File Size
    -

Download

Channel Download Status
Express Download Enable

Copyright

We respect the copyrights and intellectual property rights of all users. All uploaded documents are either original works of the uploader or authorized works of the rightful owners.

  • Not to be reproduced or distributed without explicit permission.
  • Not used for commercial purposes outside of approved use cases.
  • Not used to infringe on the rights of the original creators.
  • If you believe any content infringes your copyright, please contact us immediately.

Support

For help with questions, suggestions, or problems, please contact us