The Non-Technical Summary of Berke Hepp

The Non-Technical Summary of Berke Hepp

THE NON-TECHNICAL SUMMARY OF BERKE HEPP The Aim of Project By Eser Energy Production INC.; in Western Black Sea Basin that is at Kastamonu Province, Cide District; on Kuşçu, Düzköy, Çayüstü, Mencekli, Kumköy Villages neighborhood, on Aydos Tea, establishment and operation of "Berke Regulator and Hydroelectric Power Plant" is planned with energy production purposes, which has the total installed capacity of 9.97 MW Plants with 9.97 MW of power, the business capacity of 1.526 GWh per year and 26.040 and totally 24.514 GWh secondary energy. The only purpose of Berke Hydroelectric power generation plants is to produce energy. On Aydos Tea translated by Berke Regulator transmission plant, water will be delivered by building power plants by power generation turbines. HEPP plant will be constituted in 3.00 m. tail water level. The energy obtained by the project implementation plan will be given to the national network and the region's energy demand will meet with the public interest by a solid project. Project Location Project area; Kastamonu Province at an air distance of 82 km; Kastamonu E30-a4, Kastamonu E30-a1 number 1/25.000 Scale Map 33o05ı00-33o07ı30 latitude and longitude 41o52ı00-41o56ı00 in Cide District approximately at an air distance of 10 km to the east. For transportation to the activity field; through the transmission channel on the left side of the route which is at the direction of the increasing km and north direction of the central location of Bartın İnebolu road. Project area in the Western Black Sea region is on the Aydos Tea. The project construction work will last for 2 years and 50 years as the project's economic life has been front. In this Project, about 100 people to work in the construction phase is planned. Construction of staff to work during Kastamonu Province, Cide District is considered to be covered by local people in residential areas. As a result, the project requires construction phase engineers, technicians and machine operators and unskilled workers from the region, such as technical staff to ensure the show will be encouraged; there will be an important employment opportunities. Approximately 10 people will run the business stage. Personnel with the aim of the social needs will be established in a central unit of worksite; kitchen, dormitory, toilet, bathroom..Etc. Construction and operational phases of the project will work for the water needs of the staff, will be licensed and sold in the market will be provided with demijohn allowed. The project needs to use water; by taking the necessary permits from DSİ Regional Directorate Aydos Tea. 1 Hydroelectric Energy and Electricity Generation Hydroelectric energy is the energy of the fast flowing water translated into electricity obtained from the electrical generator. Hydroelectric Power Plants are established for obtaining drinking water, for industrial use or to provide water of the cut created by the dam lake. Hydraulic energy is the most common type of renewable energy on earth, but its positive impact on the environment should not be ignored. Our country, in terms of it’s Climate and its geographic location; the Black Sea region has a large hydraulic potential. As our country's oil resources are insufficient, but it has sufficient surface water resources, it has become essential that the energy policy should be converted into hydroelectric power plants. It is preferred because of its low operating costs of Hydroelectric Central due to the damaging effects of major energy resources around the world. Project Phases The project will consist of the following stages: Pre-Construction Preparation Period Site Establishment of Plant Making of Site Access Roads Construction of Derivation Facilities Construction of Regulator Construction of Spillway Construction of Energy transmission channel Balance of Funnel Equipment Algebra Pipe Equipment Construction of the Central Building Construction of the Tail water channel Construction of the Switchgear Field Electromechanical Equipment Works Business Reception 2.

View Full Text

Details

  • File Type
    pdf
  • Upload Time
    -
  • Content Languages
    English
  • Upload User
    Anonymous/Not logged-in
  • File Pages
    2 Page
  • File Size
    -

Download

Channel Download Status
Express Download Enable

Copyright

We respect the copyrights and intellectual property rights of all users. All uploaded documents are either original works of the uploader or authorized works of the rightful owners.

  • Not to be reproduced or distributed without explicit permission.
  • Not used for commercial purposes outside of approved use cases.
  • Not used to infringe on the rights of the original creators.
  • If you believe any content infringes your copyright, please contact us immediately.

Support

For help with questions, suggestions, or problems, please contact us