Kyoto Energypark

Kyoto Energypark

Renewable Energy Demonstration Program 2009 Kyoto energypark Supplement to Environmental Assessment Responses to Public Submissions Submission prepared by: pamada August 2009 Responses to Public Submissions (August 2009) pamada Page 2 Pamada Pty Ltd Level 16, 18 College Street Hyde Park, Sydney NSW 2010 PO Box 1446 Darlinghurst NSW 1300 Tel (612) 9969 3608 Fax (612) 8323 4611 www.pamada.com Printed: 18/09/2009 Z:\01 Pamada\60 File: Kyoto\KEP\MainDocument\App.docx Client: Kyoto Energy Company Pty Ltd Pamada Project Manager: Mr Mark Dixon Pamada Project Director: Mr Mark Sydney Pamada Reference Number: KEPS Responses to the Public submissions received during public exhibition of the Kyoto Energy Park proposal in accordance with Part 3A of the Environmental Planning and Assessment Act 1979. This Document has been prepared by: Company: Pamada Pty Ltd Project Manager Mark Dixon Jamie Chivers DISCLAIMER: This document is based on information available at the time and was prepared for a specific purpose. Any representation, statement, opinion or advice expressed or implied in this document is made in good faith, but on the basis that Pamada Pty Ltd, its agents or employees, are not liable (whether by reason of negligence, lack or care or otherwise) to any person and/or other legally recognised entity for any damage or loss whatsoever, which has occurred or may occur, in relation to that person and/or other legally recognised entity taking or not taking (as the case may be) action, in respect of any representation, statement or advice referred to in this document. Persons and/or other legally recognised entities wishing to use any details provided in this document that may affect financial decisions are strongly urged to seek legal advice and contact relevant government authorities, and relevant specialist consultants to obtain current information and to verify the current status of the information contained herein this document. © COPYRIGHT 2009 – PAMADA PTY LTD All rights reserved. Pamada Pty Ltd advises that this document and all information contained therein is protected by copyright under the Australian Copyright Act 1968. Reproduction of this document in part or whole and/or use without the written permission from Pamada Pty Ltd constitutes a breach of copyright. The document may only be used for the purposes for which it was commissioned and in accordance with the Terms of Engagement for the commission. Any reference to the document must include the document in its entirety and also include reference to Pamada Pty Ltd. Responses to Public Submissions (August 2009) pamada Page 3 CONTENTS Key Amendments ____________________________________________________________________ 5 PART A – GOVERNMENT SUBMISSIONS ................................................................................... 6 1.0 NSW Department of Water and Energy _______________________________________________ 6 1.1 Department of Defence ____________________________________________________________ 6 1.2 Upper Hunter Shire Council (UHSC) __________________________________________________ 6 1.2.1 Community Participation ______________________________________________________________ 7 1.2.2 Social and Economic Impacts ___________________________________________________________ 7 1.2.3 Biodiversity Flora and Fauna ___________________________________________________________ 10 1.2.4 Heritage ___________________________________________________________________________ 10 1.2.5 Noise Impacts ______________________________________________________________________ 11 1.2.6 Buffer Zone ________________________________________________________________________ 12 1.2.7 Visual Impact _______________________________________________________________________ 13 1.2.8 Aviation Issues ______________________________________________________________________ 13 1.2.9 Electromagnetic Interference (EMI) _____________________________________________________ 13 1.2.10 Mineral Resource Sterilisation ________________________________________________________ 14 1.2.11 Hydrology ________________________________________________________________________ 14 1.2.12 Geology and Soils __________________________________________________________________ 14 1.2.13 Transportation and Traffic ___________________________________________________________ 14 1.2.14 Bushfire Risk ______________________________________________________________________ 19 1.2.15 Transmission Line Connection to the Grid _______________________________________________ 20 1.2.16 Other Matters _____________________________________________________________________ 21 1.3 Civil Aviation Safety Authority (CASA) _______________________________________________ 22 1.4 Airservices Australia _____________________________________________________________ 23 1.5 Hunter –Central Rivers Catchment Management Authority (CMA) ________________________ 23 1.5.1 Catchment Action Plan (CAP) __________________________________________________________ 23 1.5.2 Vegetation Offsets __________________________________________________________________ 23 1.5.3 Native Vegetation ___________________________________________________________________ 23 1.5.4 Corridors __________________________________________________________________________ 24 1.5.5 Sediment and Erosion ________________________________________________________________ 24 1.6 NSW Department of Primary Industries (DPI) _________________________________________ 24 1.6.1 Coal and Gas Resource Sterilisation _____________________________________________________ 24 1.6.2 Other Mineral resources ______________________________________________________________ 25 1.7 Muswellbrook Shire Council _______________________________________________________ 25 1.7.1 Transmission Route Option 4 __________________________________________________________ 25 1.7.2 Heavy Traffic along Wybong Rd ________________________________________________________ 25 1.8 Roads and Traffic Authority (RTA) __________________________________________________ 26 1.9 Department of Environment and Climate Change (DECC) _______________________________ 26 1.9.1 Protection of the Environment Operations Act ____________________________________________ 26 1.9.2 Aboriginal Cultural Heritage ___________________________________________________________ 26 1.9.3 DECC Estate ________________________________________________________________________ 35 1.9.4 Threatened Species __________________________________________________________________ 35 1.10 Department of Lands ____________________________________________________________ 35 1.10.1 Crown Roads ______________________________________________________________________ 35 1.10.2 Environmental Protection Reserve and Tenure ___________________________________________ 36 1.10.3 Trigonometrical Stations _____________________________________________________________ 36 Responses to Public Submissions (August 2009) pamada Page 4 1.10.4 Water Reserve (WR41) ______________________________________________________________ 37 1.10.5 Bushfire Assessment ________________________________________________________________ 37 1.11 Rural Fire Service (RFS) __________________________________________________________ 37 1.12 Energy Australia ________________________________________________________________ 37 PART B – COMMUNITY SUBMISSIONS ................................................................................... 39 2. 0 Summary of Questions from the Community responses ________________________________ 39 2. 1 Responses to Questions from the Community ________________________________________ 45 PART C – MODIFICATIONS TO THE PROPOSAL ....................................................................... 66 3.0 Preferred Layout ________________________________________________________________ 66 3.1 Revised ________________________________________________________________________ 69 Scope of Works ____________________________________________________________________ 69 3.2 Conclusion _____________________________________________________________________ 69 PART D – REVISED STATEMENT OF COMMITMENTS (SoC) ..................................................... 71 PART E GLOSSARY OF TERMS & ABBREVIATIONS ................................................................... 89 Responses to Public Submissions (August 2009) pamada Page 5 Key Amendments The KEP project has significantly reduced the overall impacts relating to the proposal placed on public exhibition. Issues have been brought forward by Government departments and concerns have been raised by community stakeholders. These issues and concerns have been addressed in Part A (Government responses) and Part B (Responses to Community) respectively. Most of the issues raised were in relation to impacts associated with wind turbine generators. Following consideration of these issues raised a final revised layout and revised scope of works for the proposal has been included in Part C. All changes and amendments to the original Statement of Commitments has been included in Part D reflecting these issues. As of the date of this report a further eight (8) wind turbines have been omitted from the proposal and specifically from the Middlebrook Station site. These turbines were removed due to conflicts with aviation procedures at the Scone aerodrome. These turbines were also of most contention in consideration of visual effect, vegetation disturbance and impacts on the adjacent Towarri National Park to the north. Removal of these turbines has significantly reduced the overall residual environmental

View Full Text

Details

  • File Type
    pdf
  • Upload Time
    -
  • Content Languages
    English
  • Upload User
    Anonymous/Not logged-in
  • File Pages
    89 Page
  • File Size
    -

Download

Channel Download Status
Express Download Enable

Copyright

We respect the copyrights and intellectual property rights of all users. All uploaded documents are either original works of the uploader or authorized works of the rightful owners.

  • Not to be reproduced or distributed without explicit permission.
  • Not used for commercial purposes outside of approved use cases.
  • Not used to infringe on the rights of the original creators.
  • If you believe any content infringes your copyright, please contact us immediately.

Support

For help with questions, suggestions, or problems, please contact us