World Bank Document

World Bank Document

DAM SAFETY AND WATER RESOURCES PLANNING PROJECT PROCUREMENT PLAN FOR CONSULTING SERVICES (Subject to Prior Review/Post Review) IDA Credit Number : 4406-CE Project ID: 093132 Revised on 13th November 2009 Description of services ame of of ame emarks (date) (date) eferance eferance finalished Date)** inalised project project (date)** (date)** (date)** Contract) Number inal RFP RFP inal ( f N objection by by objection the bank R Technical Technical Serial No Serial f method of R ationality & & ationality e ervice to be be to ervice ( (EOI) date t (Technical/ to the bank selection @ selection Package no Package Consultant/ Consultant/ roposal to be roposal to (us$million) short listing RFP Issued Issued RFP o World Bank Bank World b No objection S Date (US$M) Date eceived by the the by eceived RFP final draft N from bank for for bank from XP. Incurred to estimated cost contract/Final uthorities (date) P alue and Currency alue TOR/ shortlist/ Advertising for Advertising for Combined/Draft Combined/Draft r N to be forwarded to Contract Number, contract) (Date) contract) Evaluation to be to Evaluation Zip code, ifUSA completed (date) TOR/ shortlist to # E /#Combined/Draf V # A 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 Component -1 PP 1-Jan-06 1-Mar-06 21-Mar-06 23-Mar-06 24-Mar-06 5-Oct-06 7-Jun-06 7-Aug-06 SMEC 15-Feb-07 0.43 Design of NAWAM project and preparation of project report and project DSWRPP/CS/QBS/ Public Disclosure Authorized Public Disclosure Authorized 1 DSWRPP/CS/QBS/01 0.720 QBS Completed International (pty) R implementation plan for world Bank Appraisal 01 A 1-Jan-06 1-Mar-06 22-Mar-06 7-Apr-06 7-Apr-06 19-May-06 19-Jul-06 21-Jul-06 ltd. Australia 15-Feb-07 PP 5-Oct-07 4-Nov-07 14-Nov-07 24-Nov-07 4-Dec-07 18-Jan-08 3-Mar-08 13-Mar-08 DSWRPP- DSWRPP- R 1/CS/QCBS/02 Consulting Services for Dam Safety & Operational Efficiency Improvements 4.089 QCBS 1/CS/QCBS/02 poyry A 5-Oct-07 10-Dec-07 19-Mar-08 2-May-08 7-May-08 10-Jul-08 6-Nov-08 12-Apr-09 Energy Ltd.-Swits PP - 28-Jan-09 - 2-Feb-09 - - - - 30-Mar-09 2 DSWRPP- DSWRPP- R 1/CS/SSS/02-01 Individual Consultant to Review Designs Prepared by IAs-Part 1 0.02 SSS Completed 2/CS/SSS/02-01 Mr. R.K. A - 28-Jan-09 - 2-Feb-09 - - - - Malhotra- Indian 30-Mar-09 PP - 28-Jan-09 - 2-Feb-09 - - - - 30-Mar-09 DSWRPP- DSWRPP- R 1/CS/SSS/02-02 Individual Consultant to Review Designs Prepared by IAs-part 2 0.02 SSS 2/CS/SSS/02-02 Mr. R.K. A 28-Jan-09 - 2-Feb-09 Malhotra- Indian PP 1-Jun-07 1-Jul-07 11-Jul-07 21-Jul-07 31-Jul-07 14-Sep-07 29-Oct-07 25-Jan-08 DSWRPP- DSWRPP- EML Consultants- R Environmental Assessment - Ridiyagama 0.005 QCBS Completed 1/CS/QCBS/03 -01 1/CS/QCBS/03 -01 Sri Lankan A - 10-Apr-07 - - 18-May-07 25-May-07 13-Jun-07 - 7-Feb-08 PP 1-Jun-07 1-Jul-07 11-Jul-07 21-Jul-07 31-Jul-07 14-Sep-07 29-Oct-07 25-Jan-08 DSWRPP- DSWRPP- EML Consultants- R Environmental Assessment - Tabbowa 0.005 QCBS Completed 1/CS/QCBS/03-02 1/CS/QCBS/03-02 Sri Lankan A - 10-Apr-07 - - 18-May-07 25-May-07 13-Jun-07 - 7-Feb-08 PP 1-Jun-07 1-Jul-07 11-Jul-07 21-Jul-07 31-Jul-07 14-Sep-07 29-Oct-07 25-Jan-08 DSWRPP- DSWRPP- EML Consultants- R Environmental Assessment -Victoria 0.002 QCBS Completed 1/CS/QCBS/03-03 1/CS/QCBS/03-03 Sri Lankan A - 10-Apr-07 - - 18-May-07 25-May-07 13-Jun-07 - 7-Feb-08 PP 1-Jun-07 1-Jul-07 11-Jul-07 21-Jul-07 31-Jul-07 14-Sep-07 29-Oct-07 25-Jan-08 Public Disclosure Authorized Public Disclosure Authorized DSWRPP- DSWRPP- EML Consultants- R Environmental Assessment - Inginimitiya 0.005 QCBS Completed 1/CS/QCBS/03-04 1/CS/QCBS/03-04 Sri Lankan A - 10-Apr-07 - - 18-May-07 25-May-07 13-Jun-07 - 7-Feb-08 PP 21-Apr-08 21-May-08 31-May-08 10-Jun-08 20-Jun-08 4-Aug-08 18-Sep-08 28-Mar-09 DSWRPP- Environmental Assessment -(Huruluwea, Tissawewa, Nachchaduwa, Nuwara DSWRPP- R 0.024 QCBS 1/CS/QCBS/03-05 wewa, Rajangana, Usgala-Siyambalangamuwa, Nalanda) 1/CS/QCBS/03-05 A 21-Apr-08 30-Sep-08 8-Jul-08 17-Jul-08 15-Oct-08 13-Nov-08 1-Jan-09 - ECL-Sri Lankan PP 21-Apr-08 21-May-08 31-May-08 10-Jun-08 20-Jun-08 4-Aug-08 18-Sep-08 28-Mar-09 DSWRPP- Environmental Assessment - (Kothmale, Rantembe, Maduruoya, Kalawewa, DSWRPP- R 0.025 QCBS MG Consultants 1/CS/QCBS/03-06 Dambuluoya, Chandrikawewa, Kalatuwawa) 1/CS/QCBS/03-06 A 21-Apr-08 22-Sep-08 8-Jul-08 17-Jul-08 2-Oct-08 3-Nov-08 30-Nov-08 - 3 PP 7-Jun-07 7-Jul-07 17-Jul-07 27-Jul-07 6-Aug-07 20-Sep-07 4-Nov-07 24-Jan-08 DSWRPP- DSWRPP- EML Consultants- R Environmental Assessment - Bowatenna 0.004 QCBS 1/CS/QCBS/03-07 1/CS/QCBS/03-07 Sri Lankan A - 5-Dec-07 - - 30-Jan-08 5-Feb-08 22-Aug-08 - PP 7-Jun-07 7-Jul-07 17-Jul-07 27-Jul-07 6-Aug-07 20-Sep-07 4-Nov-07 24-Jan-08 DSWRPP- DSWRPP- EML Consultants- R Environmental Assessment - Polgolla 0.004 QCBS 1/CS/QCBS/03-08 1/CS/QCBS/03-08 Sri Lankan A - 5-Dec-07 - - 30-Jan-08 5-Feb-08 22-Aug-08 - PP 7-Jun-07 7-Jul-07 17-Jul-07 27-Jul-07 6-Aug-07 20-Sep-07 4-Nov-07 24-Jan-08 DSWRPP- DSWRPP- EML Consultants- R Environmental Assessment - Kandalama 0.005 QCBS 1/CS/QCBS/03-09 1/CS/QCBS/03-09 Sri Lankan A - 5-Dec-07 - - 30-Jan-08 5-Feb-08 22-Aug-08 - PP 7-Jun-07 7-Jul-07 17-Jul-07 27-Jul-07 6-Aug-07 20-Sep-07 4-Nov-07 24-Jan-08 DSWRPP- DSWRPP- EML Consultants- R Environmental Assessment - Randenigala 0.004 QCBS 1/CS/QCBS/03-10 1/CS/QCBS/03-10 Sri Lankan Public Disclosure Authorized Public Disclosure Authorized A - 5-Dec-07 - - 30-Jan-08 5-Feb-08 22-Aug-08 - PP 21-Apr-08 21-May-08 31-May-08 10-Jun-08 20-Jun-08 4-Aug-08 18-Sep-08 28-Mar-09 DSWRPP- Environmental Assessment - (Parakrama Samudraya, Minneriya, Giritale, DSWRPP- R 0.019 QCBS 1/CS/QCBS/03-11 Kaudulla, Kantale, Vendarasan) 1/CS/QCBS/03-11 A 21-Apr-08 30-Sep-08 8-Jul-08 17-Jul-08 15-Oct-08 13-Nov-08 1-Jan-09 - ECL-Sri Lankan PP 21-Apr-08 21-May-08 31-May-08 10-Jun-08 20-Jun-08 4-Aug-08 18-Sep-08 28-Mar-09 DSWRPP- DSWRPP- R 1/CS/QCBS/03-12 Environmental Assessment (Laxapana, Norton, Castlereagh, Canyon) 0.020 QCBS 1/CS/QCBS/03-12 MG Consultants A 21-Apr-08 22-Sep-08 8-Jul-08 17-Jul-08 2-Oct-08 3-Nov-08 10-Feb-09 - PP 1-Jan-08 31-Jan-08 10-Feb-08 - 1-Mar-08 15-Apr-08 30-May-08 24-Jul-10 DSWRPP- DSWRPP- R 1/CS/QBS/04-01 Social safeguard management program for Tabbowa 0.073 QBS 1/CS/QBS/04-01 A 3-Apr-08 1-Jul-08 23-Sep-08 - 15-Dec-08 20-Jan-09 20-Feb-09 _ PP 1-Jan-08 31-Jan-08 10-Feb-08 20-Feb-08 1-Mar-08 15-Apr-08 30-May-08 24-Jul-10 DSWRPP- DSWRPP- R 1/CS/QBS/04-02 Social safeguard management program for Ridiyagama 0.091 QBS 1/CS/QBS/04-02 A 3-Apr-08 1-Jul-08 23-Sep-08 15-Dec-08 20-Jan-09 20-Feb-09 _ PP 1-Jan-08 31-Jan-08 10-Feb-08 - 1-Mar-08 15-Apr-08 30-May-08 DSWRPP- DSWRPP- R 1/CS/QBS/04-03 Social safeguard management program for Tisawewa 0.045 QBS 1/CS/QBS/04-03 A 3-Apr-08 1-Jul-08 23-Sep-08 - 15-Dec-08 20-Jan-09 20-Feb-09 PP 1-Jan-08 31-Jan-08 10-Feb-08 20-Feb-08 1-Mar-08 15-Apr-08 30-May-08 9-Jun-08 DSWRPP- DSWRPP- R 4 1/CS/QBS/04-04 Social safeguard management program for Nachchaduwa Wewa 0.103 QBS 1/CS/QBS/04-04 A 3-Apr-08 15-May-08 PP 1-Jan-08 31-Jan-08 10-Feb-08 - 1-Mar-08 15-Apr-08 30-May-08 DSWRPP- DSWRPP- R 1/CS/QBS/04-05 Social safeguard management program for Nuwara Wewa 0.054 QBS 1/CS/QBS/04-05 A 3-Apr-08 15-May-08 Public Disclosure Authorized Public Disclosure Authorized PP 1-Jan-08 31-Jan-08 10-Feb-08 - 1-Mar-08 15-Apr-08 30-May-08 DSWRPP- DSWRPP- R 1/CS/QBS/04-06 Social safeguard management program for Usgala Siyambalangamuwa 0.054 QBS 1/CS/QBS/04-06 A 3-Apr-08 15-May-08 PP 1-Jan-08 31-Jan-08 10-Feb-08 - 1-Mar-08 15-Apr-08 30-May-08 9-Jun-08 DSWRPP- DSWRPP- R 1/CS/QBS/04-07 Social safeguard management program for Vendrasan 0.046 QBS 1/CS/QBS/04-07 A 3-Apr-08 15-May-08 DAM SAFETY AND WATER RESOURCES PLANNING PROJECT PROCUREMENT PLAN FOR CONSULTING SERVICES (Subject to Prior Review/Post Review) IDA Credit Number : 4406-CE Project ID: 093132 Revised on 13th November 2009 Description of services ame of of ame emarks (date) (date) eferance eferance finalished Date)** inalised project project (date)** Number inal RFP RFP inal (date)** (date)** Contract) ( N f objection by by objection the bank R Technical Technical Serial No Serial f method of R e ationality & & ationality ervice to be be to ervice ( (EOI) date t (Technical/ selection @ selection to the bank Package no Package roposal to be roposal to Consultant/ Consultant/ short listing RFP Issued Issued RFP (us$million) o World Bank Bank World b No objection S Date (US$M) Date eceived by the the by eceived N RFP final draft from bank for for bank from XP.

View Full Text

Details

  • File Type
    pdf
  • Upload Time
    -
  • Content Languages
    English
  • Upload User
    Anonymous/Not logged-in
  • File Pages
    24 Page
  • File Size
    -

Download

Channel Download Status
Express Download Enable

Copyright

We respect the copyrights and intellectual property rights of all users. All uploaded documents are either original works of the uploader or authorized works of the rightful owners.

  • Not to be reproduced or distributed without explicit permission.
  • Not used for commercial purposes outside of approved use cases.
  • Not used to infringe on the rights of the original creators.
  • If you believe any content infringes your copyright, please contact us immediately.

Support

For help with questions, suggestions, or problems, please contact us