DAM SAFETY AND WATER RESOURCES PLANNING PROJECT PROCUREMENT PLAN FOR CONSULTING SERVICES (Subject to Prior Review/Post Review) IDA Credit Number : 4406-CE Project ID: 093132 Revised on 13th November 2009 Description of services ame of of ame emarks (date) (date) eferance eferance finalished Date)** inalised project project (date)** (date)** (date)** Contract) Number inal RFP RFP inal ( f N objection by by objection the bank R Technical Technical Serial No Serial f method of R ationality & & ationality e ervice to be be to ervice ( (EOI) date t (Technical/ to the bank selection @ selection Package no Package Consultant/ Consultant/ roposal to be roposal to (us$million) short listing RFP Issued Issued RFP o World Bank Bank World b No objection S Date (US$M) Date eceived by the the by eceived RFP final draft N from bank for for bank from XP. Incurred to estimated cost contract/Final uthorities (date) P alue and Currency alue TOR/ shortlist/ Advertising for Advertising for Combined/Draft Combined/Draft r N to be forwarded to Contract Number, contract) (Date) contract) Evaluation to be to Evaluation Zip code, ifUSA completed (date) TOR/ shortlist to # E /#Combined/Draf V # A 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 Component -1 PP 1-Jan-06 1-Mar-06 21-Mar-06 23-Mar-06 24-Mar-06 5-Oct-06 7-Jun-06 7-Aug-06 SMEC 15-Feb-07 0.43 Design of NAWAM project and preparation of project report and project DSWRPP/CS/QBS/ Public Disclosure Authorized Public Disclosure Authorized 1 DSWRPP/CS/QBS/01 0.720 QBS Completed International (pty) R implementation plan for world Bank Appraisal 01 A 1-Jan-06 1-Mar-06 22-Mar-06 7-Apr-06 7-Apr-06 19-May-06 19-Jul-06 21-Jul-06 ltd. Australia 15-Feb-07 PP 5-Oct-07 4-Nov-07 14-Nov-07 24-Nov-07 4-Dec-07 18-Jan-08 3-Mar-08 13-Mar-08 DSWRPP- DSWRPP- R 1/CS/QCBS/02 Consulting Services for Dam Safety & Operational Efficiency Improvements 4.089 QCBS 1/CS/QCBS/02 poyry A 5-Oct-07 10-Dec-07 19-Mar-08 2-May-08 7-May-08 10-Jul-08 6-Nov-08 12-Apr-09 Energy Ltd.-Swits PP - 28-Jan-09 - 2-Feb-09 - - - - 30-Mar-09 2 DSWRPP- DSWRPP- R 1/CS/SSS/02-01 Individual Consultant to Review Designs Prepared by IAs-Part 1 0.02 SSS Completed 2/CS/SSS/02-01 Mr. R.K. A - 28-Jan-09 - 2-Feb-09 - - - - Malhotra- Indian 30-Mar-09 PP - 28-Jan-09 - 2-Feb-09 - - - - 30-Mar-09 DSWRPP- DSWRPP- R 1/CS/SSS/02-02 Individual Consultant to Review Designs Prepared by IAs-part 2 0.02 SSS 2/CS/SSS/02-02 Mr. R.K. A 28-Jan-09 - 2-Feb-09 Malhotra- Indian PP 1-Jun-07 1-Jul-07 11-Jul-07 21-Jul-07 31-Jul-07 14-Sep-07 29-Oct-07 25-Jan-08 DSWRPP- DSWRPP- EML Consultants- R Environmental Assessment - Ridiyagama 0.005 QCBS Completed 1/CS/QCBS/03 -01 1/CS/QCBS/03 -01 Sri Lankan A - 10-Apr-07 - - 18-May-07 25-May-07 13-Jun-07 - 7-Feb-08 PP 1-Jun-07 1-Jul-07 11-Jul-07 21-Jul-07 31-Jul-07 14-Sep-07 29-Oct-07 25-Jan-08 DSWRPP- DSWRPP- EML Consultants- R Environmental Assessment - Tabbowa 0.005 QCBS Completed 1/CS/QCBS/03-02 1/CS/QCBS/03-02 Sri Lankan A - 10-Apr-07 - - 18-May-07 25-May-07 13-Jun-07 - 7-Feb-08 PP 1-Jun-07 1-Jul-07 11-Jul-07 21-Jul-07 31-Jul-07 14-Sep-07 29-Oct-07 25-Jan-08 DSWRPP- DSWRPP- EML Consultants- R Environmental Assessment -Victoria 0.002 QCBS Completed 1/CS/QCBS/03-03 1/CS/QCBS/03-03 Sri Lankan A - 10-Apr-07 - - 18-May-07 25-May-07 13-Jun-07 - 7-Feb-08 PP 1-Jun-07 1-Jul-07 11-Jul-07 21-Jul-07 31-Jul-07 14-Sep-07 29-Oct-07 25-Jan-08 Public Disclosure Authorized Public Disclosure Authorized DSWRPP- DSWRPP- EML Consultants- R Environmental Assessment - Inginimitiya 0.005 QCBS Completed 1/CS/QCBS/03-04 1/CS/QCBS/03-04 Sri Lankan A - 10-Apr-07 - - 18-May-07 25-May-07 13-Jun-07 - 7-Feb-08 PP 21-Apr-08 21-May-08 31-May-08 10-Jun-08 20-Jun-08 4-Aug-08 18-Sep-08 28-Mar-09 DSWRPP- Environmental Assessment -(Huruluwea, Tissawewa, Nachchaduwa, Nuwara DSWRPP- R 0.024 QCBS 1/CS/QCBS/03-05 wewa, Rajangana, Usgala-Siyambalangamuwa, Nalanda) 1/CS/QCBS/03-05 A 21-Apr-08 30-Sep-08 8-Jul-08 17-Jul-08 15-Oct-08 13-Nov-08 1-Jan-09 - ECL-Sri Lankan PP 21-Apr-08 21-May-08 31-May-08 10-Jun-08 20-Jun-08 4-Aug-08 18-Sep-08 28-Mar-09 DSWRPP- Environmental Assessment - (Kothmale, Rantembe, Maduruoya, Kalawewa, DSWRPP- R 0.025 QCBS MG Consultants 1/CS/QCBS/03-06 Dambuluoya, Chandrikawewa, Kalatuwawa) 1/CS/QCBS/03-06 A 21-Apr-08 22-Sep-08 8-Jul-08 17-Jul-08 2-Oct-08 3-Nov-08 30-Nov-08 - 3 PP 7-Jun-07 7-Jul-07 17-Jul-07 27-Jul-07 6-Aug-07 20-Sep-07 4-Nov-07 24-Jan-08 DSWRPP- DSWRPP- EML Consultants- R Environmental Assessment - Bowatenna 0.004 QCBS 1/CS/QCBS/03-07 1/CS/QCBS/03-07 Sri Lankan A - 5-Dec-07 - - 30-Jan-08 5-Feb-08 22-Aug-08 - PP 7-Jun-07 7-Jul-07 17-Jul-07 27-Jul-07 6-Aug-07 20-Sep-07 4-Nov-07 24-Jan-08 DSWRPP- DSWRPP- EML Consultants- R Environmental Assessment - Polgolla 0.004 QCBS 1/CS/QCBS/03-08 1/CS/QCBS/03-08 Sri Lankan A - 5-Dec-07 - - 30-Jan-08 5-Feb-08 22-Aug-08 - PP 7-Jun-07 7-Jul-07 17-Jul-07 27-Jul-07 6-Aug-07 20-Sep-07 4-Nov-07 24-Jan-08 DSWRPP- DSWRPP- EML Consultants- R Environmental Assessment - Kandalama 0.005 QCBS 1/CS/QCBS/03-09 1/CS/QCBS/03-09 Sri Lankan A - 5-Dec-07 - - 30-Jan-08 5-Feb-08 22-Aug-08 - PP 7-Jun-07 7-Jul-07 17-Jul-07 27-Jul-07 6-Aug-07 20-Sep-07 4-Nov-07 24-Jan-08 DSWRPP- DSWRPP- EML Consultants- R Environmental Assessment - Randenigala 0.004 QCBS 1/CS/QCBS/03-10 1/CS/QCBS/03-10 Sri Lankan Public Disclosure Authorized Public Disclosure Authorized A - 5-Dec-07 - - 30-Jan-08 5-Feb-08 22-Aug-08 - PP 21-Apr-08 21-May-08 31-May-08 10-Jun-08 20-Jun-08 4-Aug-08 18-Sep-08 28-Mar-09 DSWRPP- Environmental Assessment - (Parakrama Samudraya, Minneriya, Giritale, DSWRPP- R 0.019 QCBS 1/CS/QCBS/03-11 Kaudulla, Kantale, Vendarasan) 1/CS/QCBS/03-11 A 21-Apr-08 30-Sep-08 8-Jul-08 17-Jul-08 15-Oct-08 13-Nov-08 1-Jan-09 - ECL-Sri Lankan PP 21-Apr-08 21-May-08 31-May-08 10-Jun-08 20-Jun-08 4-Aug-08 18-Sep-08 28-Mar-09 DSWRPP- DSWRPP- R 1/CS/QCBS/03-12 Environmental Assessment (Laxapana, Norton, Castlereagh, Canyon) 0.020 QCBS 1/CS/QCBS/03-12 MG Consultants A 21-Apr-08 22-Sep-08 8-Jul-08 17-Jul-08 2-Oct-08 3-Nov-08 10-Feb-09 - PP 1-Jan-08 31-Jan-08 10-Feb-08 - 1-Mar-08 15-Apr-08 30-May-08 24-Jul-10 DSWRPP- DSWRPP- R 1/CS/QBS/04-01 Social safeguard management program for Tabbowa 0.073 QBS 1/CS/QBS/04-01 A 3-Apr-08 1-Jul-08 23-Sep-08 - 15-Dec-08 20-Jan-09 20-Feb-09 _ PP 1-Jan-08 31-Jan-08 10-Feb-08 20-Feb-08 1-Mar-08 15-Apr-08 30-May-08 24-Jul-10 DSWRPP- DSWRPP- R 1/CS/QBS/04-02 Social safeguard management program for Ridiyagama 0.091 QBS 1/CS/QBS/04-02 A 3-Apr-08 1-Jul-08 23-Sep-08 15-Dec-08 20-Jan-09 20-Feb-09 _ PP 1-Jan-08 31-Jan-08 10-Feb-08 - 1-Mar-08 15-Apr-08 30-May-08 DSWRPP- DSWRPP- R 1/CS/QBS/04-03 Social safeguard management program for Tisawewa 0.045 QBS 1/CS/QBS/04-03 A 3-Apr-08 1-Jul-08 23-Sep-08 - 15-Dec-08 20-Jan-09 20-Feb-09 PP 1-Jan-08 31-Jan-08 10-Feb-08 20-Feb-08 1-Mar-08 15-Apr-08 30-May-08 9-Jun-08 DSWRPP- DSWRPP- R 4 1/CS/QBS/04-04 Social safeguard management program for Nachchaduwa Wewa 0.103 QBS 1/CS/QBS/04-04 A 3-Apr-08 15-May-08 PP 1-Jan-08 31-Jan-08 10-Feb-08 - 1-Mar-08 15-Apr-08 30-May-08 DSWRPP- DSWRPP- R 1/CS/QBS/04-05 Social safeguard management program for Nuwara Wewa 0.054 QBS 1/CS/QBS/04-05 A 3-Apr-08 15-May-08 Public Disclosure Authorized Public Disclosure Authorized PP 1-Jan-08 31-Jan-08 10-Feb-08 - 1-Mar-08 15-Apr-08 30-May-08 DSWRPP- DSWRPP- R 1/CS/QBS/04-06 Social safeguard management program for Usgala Siyambalangamuwa 0.054 QBS 1/CS/QBS/04-06 A 3-Apr-08 15-May-08 PP 1-Jan-08 31-Jan-08 10-Feb-08 - 1-Mar-08 15-Apr-08 30-May-08 9-Jun-08 DSWRPP- DSWRPP- R 1/CS/QBS/04-07 Social safeguard management program for Vendrasan 0.046 QBS 1/CS/QBS/04-07 A 3-Apr-08 15-May-08 DAM SAFETY AND WATER RESOURCES PLANNING PROJECT PROCUREMENT PLAN FOR CONSULTING SERVICES (Subject to Prior Review/Post Review) IDA Credit Number : 4406-CE Project ID: 093132 Revised on 13th November 2009 Description of services ame of of ame emarks (date) (date) eferance eferance finalished Date)** inalised project project (date)** Number inal RFP RFP inal (date)** (date)** Contract) ( N f objection by by objection the bank R Technical Technical Serial No Serial f method of R e ationality & & ationality ervice to be be to ervice ( (EOI) date t (Technical/ selection @ selection to the bank Package no Package roposal to be roposal to Consultant/ Consultant/ short listing RFP Issued Issued RFP (us$million) o World Bank Bank World b No objection S Date (US$M) Date eceived by the the by eceived N RFP final draft from bank for for bank from XP.
Details
-
File Typepdf
-
Upload Time-
-
Content LanguagesEnglish
-
Upload UserAnonymous/Not logged-in
-
File Pages24 Page
-
File Size-