Lean Manufacturing Wastes: Muda Mura & Muri Cheat Sheet By

Lean Manufacturing Wastes: Muda Mura & Muri Cheat Sheet By

Lean Manufacturing Wastes: Muda Mura & Muri Cheat Sheet by [deleted] via cheatography.com/2754/cs/16549/ Introdu​ ction: The 3 Ms of Lean 2. Mura the Waste of Unevenness When Japanese companies talk about waste they usually talk about the three Ms; Mura, Muri and Muda. While most people who have had contact with lean manufac​ turing will have been made aware of the 7 wastes and Muda they often have not been introduced to Muri and Mura at all. Yet these wastes are often far more important to tackle than Muda and often are the underlying causes of the Muda that you observe within your processes. While Muda is the non-value adding actions within your processes; Muri is to overburden or be unreaso​ nable while Mura is unevenn​ ess. I will discuss these terms below. Source: http://​ lea​ nma​ nuf​ act​ uri​ ngt​ ool​ s.or​ g/​ 71/​ mud​ a-m​ ura​ -an​ d-m​ uri​ -l‐​ Mura is the waste of unevenness or inconsi​ ste​ ncy, but what does ean-​ man​ ufa​ ctu​ rin​ g-w​ astes/ this mean and how does it affect us? Muda, Mura, Muri Video Mura creates many of the seven wastes that we observe, Mura Video: http://youtu.be/IqDgzh9IZuQ drives Muda! By failing to smooth our demand we put unfair demands on our processes and people and cause the creation of 1. Muda, The Seven Wastes inventory and other wastes. Muda is any activity or process that does not add value; a physical 3. Muri the Waste of Overburden waste of your time, resources and ultimately your money. These wastes were categor​ ized by Taiichi Ohno within the Toyota production system, they are; Trans​ por​ t; the movement of product between operati​ ons, and locations. Inven​ tor​ y; the work in progress (WIP) and stocks of finished goods and raw materials that a company holds. Motio​ n; the physical movement of a person or machine whilst conducting an operation. Waiti​ ng; the act of waiting for a machine to finish, for product to arrive, or any other cause. Overp​ rod​ uct​ ion; Over producing product beyond what the Muri is to cause overbur​ den, by this we mean to give unneces​ sary customer has ordered. stress to our employees and our processes. This is caused by Mura Over-​ pro​ ces​ sin​ g; conducting operations beyond those that and a host of other failures in our system such as lack of training, customer requires. unclear or no defined ways of working, the wrong tools, and ill Defec​ ts; product rejects and rework within your processes. thought out measures of perform​ ance. Again Mura causes Muda, the seven wastes are symptoms of our failure to tackle Mura and Muri within our processes not the root cause! By [deleted] Published 14th October, 2018. Sponsored by ApolloPad.com cheatography.com/deleted- Last updated 14th October, 2018. Everyone has a novel in them. Finish 2754/ Page 1 of 1. Yours! https://apollopad.com.

View Full Text

Details

  • File Type
    pdf
  • Upload Time
    -
  • Content Languages
    English
  • Upload User
    Anonymous/Not logged-in
  • File Pages
    1 Page
  • File Size
    -

Download

Channel Download Status
Express Download Enable

Copyright

We respect the copyrights and intellectual property rights of all users. All uploaded documents are either original works of the uploader or authorized works of the rightful owners.

  • Not to be reproduced or distributed without explicit permission.
  • Not used for commercial purposes outside of approved use cases.
  • Not used to infringe on the rights of the original creators.
  • If you believe any content infringes your copyright, please contact us immediately.

Support

For help with questions, suggestions, or problems, please contact us