Hålogaland Bridge (Norway)

Hålogaland Bridge (Norway)

Project information Hålogaland Bridge (Norway) Project description mageba scope Highlights & Facts The Hålogaland Bridge is a 1,533 m-long mageba supplied two TENSA®MODULAR suspension bridge which crosses the Rom- expansion joints of type LR17 with a to- mageba Products: baksfjorden in the municipality of Narvik tal length of 27.8 m. The joints featuring Type: TENSA®MODULAR in Nordland county, Norway. the Quick-Ex system which in case of a expansion joint LR17 The bridge forms part of the E6 Highway, joint replacement brings huge advan- featuring Quick-Ex and ROBO®MUTE system a project which included the construction tages. In 2020, mageba also installed a of two short tunnels, the Ornestunnelen ROBO®MUTE noise reduction system be- RESTON®FORCE low the LR17 joint in order to reduce noise Horizontal Force bearing and Storlikolltunnelen, as well as the con- of type FE-1800 emission to nearby residential areas. struction of two new roads on both sides RESTON®STU Shock of the Hålogaland Bridge. Driving distance The main pillars are supported by two Transmission Unit was shortened between Narvik to Bjerkvik RESTON®FORCE horizontal force bearings. Installation: 2018/2020 by 18 km and between Narvik to Bjørnfjell They are designed for a maximum horizon- by 5 km. tal load of 1,800 kN (ULS) and longitudinal Structure: The 1.5 km Halogaland Bridge is the sec- movements of +/– 450 mm. The bearings City: Narvik ond longest suspension bridge in Norway. featuring an elastomeric pad in between Country: Norway to accommodate vertical rotations. The span of the bridge was built as a closed Type: Suspension bridge steel box girder resting on five pillars with Two RESTON®STU Shock Transmission Main span: 1,145 m height ranging from 12 m to 30 m, with a Units designed with a maximum axial Lenght: 1,533 m clear height of 40 m and a clear width of load of 10’400 kN (ULS), an axial stroke of Completion: 2018 200 m. +/– 450 mm and a weight of 6 tons. Due to Owner: Norwegian Public Roads limited space on site, the units were de- Contractor: Sichuan Road and signed with two separated chambers with Bridge Group different volume of oil. Engineer: COWI The bridge is located near the Norwegian city of Installation of a RESTON®FORCE horizontal force Narvik bearing Delivery of a TENSA®MODULAR expansion joint Narvik Norway Sweden © 20122018 Google 2021.02 CH-EN ©mageba mageba sa – Solistrasse 68 – 8180 Bulach – Switzerland – T +41 44 872 40 50 – [email protected].

View Full Text

Details

  • File Type
    pdf
  • Upload Time
    -
  • Content Languages
    English
  • Upload User
    Anonymous/Not logged-in
  • File Pages
    1 Page
  • File Size
    -

Download

Channel Download Status
Express Download Enable

Copyright

We respect the copyrights and intellectual property rights of all users. All uploaded documents are either original works of the uploader or authorized works of the rightful owners.

  • Not to be reproduced or distributed without explicit permission.
  • Not used for commercial purposes outside of approved use cases.
  • Not used to infringe on the rights of the original creators.
  • If you believe any content infringes your copyright, please contact us immediately.

Support

For help with questions, suggestions, or problems, please contact us