Green Initiatives 1. Towards energy saving installed 10 kWp solar power panels at Repalle station at the cost of Rs 6 Lakhs. 2. LED lighting has been provided at 14 Railway stations under the jurisdiction of Bapatla Parliamentary constituency with a cost of Rs 7.8 lakhs Passenger Train Services Details of New Trains/ Special Trains/ Provision of Stoppages/ Extension/ Increase in the frequency of Trains in Bapatla Parliamentary Constituency Jurisdiction. Bapatla New Trains Provision of Stoppage Parliamentary Constituency 1. T.No.22841/22842 Santraganchi – Chennai Central 1. T.No.22708/22707 Tirupati‐Visakhapatnam‐ Express Tirupati Double Decker tri‐weekly express Shri Narendra Modi Hon’ble Prime Minister stoppage is given at Chirala Extension of Trains 2. T.No.16864/16863 Mannargudi‐Jodhpur (Weekly) 1. T.No. 17401 / 17402 / 17403 / 17404 Machilipatnam/ Exp stoppage is given at Chirala Narsapur – Tirupati Express extended up to Dharmavaram with new Tr.No. 17245 / 17246/ Special Trains on originating basis RAIL DEVELOPMENTAL WORKS 17247 / 17248 1. Chirala to Tadepalligudem 2 Special Trains 2. T.No. 12733/12734 Tirupati–Secunderabad up to Bapatla Parliamentary Constituency Jurisdiction Lingampalli 2.Repalle to Guntur 12 Special Trains 3. T.No. 17487/17488 Visakhapatnam–Tirupati up to (Total 14 special Trains) Kadapa South Central Railway serving the entire state of Telangana, major portion of Andhra Pradesh and considerable portion of Karnataka, Maharastra states and small parts of Tamilnadu and SOUTH CENTRAL Madhya Pradesh. The Rail developmental activities RAILWAY in the jurisdiction of Bapatla Parliamentary Constituency has picked up its pace in the recent past in all spheres. Focused attention has been given for improvement in the thrust areas such as infrastructure, safety, security and Passenger amenities/ facilities. Some of the major activities are showcased in this brochure. Road Over Bridges ASSEMBLY SEGMENTS Road Under Bridges With a view to strengthen safety at 1. All the unmanned level crossings in Bapatla Parliamentary Level Crossing gates and to avoid Constituency Jurisdiction are eliminated through Vemuru untoward incidents and also to construction of RUB/LHS/Manning/Closure. provide seamless journey to road 2. Construction of RUB in lieu of Manned Level Crossing Repalle traffic, the following Road over No.275 between Vemuru–Repalle Stations is under progress. Bridges (RoB) are constructed / Road Over Bridges Bapatla proposed for construction Bapatla Parliamentary constituency. 1. Proposed for construction of Road over bridge in lieu of level crossing No.243 between Vetapalem‐Chirala Stations Parchur with an estimated cost of ` 19.25 crore Addanki Passenger Amenities Station Amenity Amount Status Chirala Tsunduru Platforms `1.22 crore Proposed Santhanuthalapadu Provision of Passenger Amenities and Chinaganjam Platform facilities, and its improvements at Extension `0.82 crore Proposed Railway Stations is one of the most Vetapalem Platform Extension `0.83 crore Proposed important aspect Railway Services. RAIL DEVELOPMENTAL WORKS Appikatla Ticket Counter `0.50 lakh Constructed Bapatla Parliamentary Constituency Jurisdiction Chinnaravuru Circulating Area `28 lakh Developed Chirala Signages `50 lakh Proposed Bapatla Signages `1.10 crore Proposed Infrastructural Development Appikatla Signages `1.10 crore Proposed Chirala Wi‐Fi Facility `4.5 lakh Provided Construction of Third Line Bapatla 25 CCTV Proposed construction of Third Railway Line between Vijayawada–Gudur Section for a distance of 288 kms at an Cameras `58 lakh Proposed anticipated cost of `3246 crore Chirala 14 CCTV Electrification Works Cameras `25 lakh Completed Proposed Electrification of Tenali–Repalle for a distance of 34 Rkms at a cost of `25.98 crore Chirala 3 Lifts `1.5 crores Provided Bapatla WVM –– Provided Safety – The First Priority Chirala 2 WVMs –– Provided Bapatla 2 ATVMs `6 lakh Installed Safety is the priority on SCR, to ensure safety of the Rail users, Foot over Bridges (FoBs)/ Road under/over Chirala 2 ATVMs Bridges are constructed / proposed for construction at various stations/ locations in Bapatla Chirala CoTVM `4.5 lakh Installed Parliamentary Constituency Jurisdiction. Bapatla CIB/TIB `1.09 crore In Progress Proposed FOBs Repalle Adarsh Station `32 lakh Converted Vemuru New Crossing Stn `6.96 crore Constructed Station Cost in `Crore Repalle New Stn Building `0.10 crore Proposed Bapatla 1.73 Bapatla 2 Lifts `1 crore In Progress Chirala 2.90 Vemuru Platform Extn. `1.32 crore Proposed Jandrapeta 0.88 Bhatiprolu Platform Extn. `1.32 crore Proposed Vemuru 1.44 Zampani Platform Extn. `1.30 crore Proposed Penumarru Platform Extn. `0.93 crore Proposed Repalle Platform Extn. `4.90 crore Proposed Appikatla Platform Shelter `0.30 crore Proposed.

View Full Text

Details

  • File Type
    pdf
  • Upload Time
    -
  • Content Languages
    English
  • Upload User
    Anonymous/Not logged-in
  • File Pages
    2 Page
  • File Size
    -

Download

Channel Download Status
Express Download Enable

Copyright

We respect the copyrights and intellectual property rights of all users. All uploaded documents are either original works of the uploader or authorized works of the rightful owners.

  • Not to be reproduced or distributed without explicit permission.
  • Not used for commercial purposes outside of approved use cases.
  • Not used to infringe on the rights of the original creators.
  • If you believe any content infringes your copyright, please contact us immediately.

Support

For help with questions, suggestions, or problems, please contact us