Altamont Winds Inc

Altamont Winds Inc

January 2015 ALTAMONT WINDS INC. 86 MW Altamont Wind Farms Final Supplemental Environmental Impact Report 2018 CUP Extension PROJECT NUMBER: ` PROJECT CONTACT: Chris Knopp EMAIL: [email protected] PHONE: 858-810-5381 POWER ENGINEERS, INC. Final Supplemental Environmental Impact Report - 2018 CUP Extension Final Supplemental Environmental Impact Report 2018 CUP Extension PREPARED FOR: COUNTY OF ALAMEDA COMMUNITY DEVELOPMENT AGENCY, PLANNING DEPARTMENT PREPARED BY: POWER ENGINEERS, INC. 858-810-5381 [email protected] POWER ENGINEERS, INC. Final Supplemental Environmental Impact Report - 2018 CUP Extension TABLE OF CONTENTS EXECUTIVE SUMMARY .................................................................................................................. 1 INTRODUCTION ................................................................................................................................... 1 SUMMARY DESCRIPTION OF THE PROPOSED PROJECT ....................................................................... 1 Asset Exchange .............................................................................................................................................. 2 MAJOR CONCLUSIONS OF THE ENVIRONMENTAL ANALYSIS ............................................................. 2 Impacts .......................................................................................................................................................... 2 Mitigation ...................................................................................................................................................... 4 Alternatives Analysis ..................................................................................................................................... 6 PUBLIC INVOLVEMENT ....................................................................................................................... 6 1.0 INTRODUCTION .................................................................................................................... 9 1.1 PROJECT UNDER REVIEW ....................................................................................................... 9 1.2 LEAD AGENCY ........................................................................................................................ 9 1.3 THE SUPPLEMENTAL ENVIRONMENTAL IMPACT REPORT ...................................................... 9 1.3.1 Intended Use ..................................................................................................................................... 9 1.3.2 Type of EIR ...................................................................................................................................... 9 1.3.3 Decision to Prepare a Supplemental Environmental Impact Report ............................................... 11 1.4 ENVIRONMENTAL REVIEW PROCESS .................................................................................... 11 1.4.1 Notice of Preparation ...................................................................................................................... 11 1.4.2 Public Involvement and Review ..................................................................................................... 12 1.4.3 Draft Supplemental Environmental Impact Report ........................................................................ 12 1.4.4 Final Supplemental Environmental Impact Report ......................................................................... 13 1.5 ORGANIZATION OF THE SUPPLEMENTAL ENVIRONMENTAL IMPACT REPORT ..................... 14 1.5.1 Scope and Focus of the FSEIR, Compared to the 2013 FEIR ........................................................ 15 1.6 INCORPORATED BY REFERENCE ........................................................................................... 15 2.0 PROJECT DESCRIPTION ................................................................................................... 16 2.1 PROJECT BACKGROUND ....................................................................................................... 16 2.2 PROJECT LOCATION .............................................................................................................. 17 2.3 PROJECT NEED AND OBJECTIVES ......................................................................................... 23 2.4 MAJOR PROJECT COMPONENTS ............................................................................................ 24 2.4.1 Asset Exchange............................................................................................................................... 24 2.4.2 Repowering Development Milestones ............................................................................................ 24 2.4.3 Circumstances Outside AWI’s Control .......................................................................................... 25 3.0 ENVIRONMENTAL IMPACTS ANALYSIS AND MITIGATION MEASURES .......... 26 3.1 APPROACH TO THE ENVIRONMENTAL ANALYSIS ................................................................. 26 3.1.1 Noise ............................................................................................................................................... 26 3.1.2 Air Quality and Greenhouse Gases ................................................................................................. 27 3.1.3 Biological Resources ...................................................................................................................... 27 3.1.4 Hazards and Hazardous Materials .................................................................................................. 28 3.2 BIOLOGICAL RESOURCES ..................................................................................................... 28 3.2.1 Regulatory setting ........................................................................................................................... 28 3.2.2 Environmental Setting .................................................................................................................... 28 3.2.3 Environmental Impacts ................................................................................................................... 29 3.3 HAZARDS AND HAZARDOUS MATERIALS ............................................................................. 40 3.3.1 Regulatory setting ........................................................................................................................... 41 3.3.2 Environmental Setting .................................................................................................................... 41 3.3.3 Environmental Impacts ................................................................................................................... 41 4.0 LIST OF PREPARERS AND OTHERS CONSULTED .................................................... 47 ANA 305-019 (PER 02) ALTAMONT WINDS (01/23/2015) 135763 YU PAGE i POWER ENGINEERS, INC. Final Supplemental Environmental Impact Report - 2018 CUP Extension 4.1 COUNTY OF ALAMEDA COMMUNITY DEVELOPMENT AGENCY ........................................... 47 4.2 POWER ENGINEERS, INC. .................................................................................................... 47 5.0 REFERENCES ....................................................................................................................... 48 FIGURES: FIGURE 1 LOCATION MAP .......................................................................................................... 19 FIGURE 2 PROJECT FACILITY EXCHANGE MAP – SEE MAP POCKET IN THE BACK OF THE DOCUMENT ................................................................................................................. 21 FIGURE 3 CLOSE-UP VIEW OF WIND TURBINE BLADE IFD ROD ............................................... 44 FIGURE 4 CLOSE-UP VIEW OF RUST STAINING EMANATING FROM WIND TURBINE IFD ROD . 45 TABLES: TABLE ES-1 ESTIMATED AVIAN FATALITIES (FOCAL RAPTOR SPECIES) AT FULL PROJECT CAPACITY (85.8 MW) BASED ON 2008-2010 BIRD YEAR ADJUSTED FATALITY RATES ...................................................................................................................................... 3 TABLE ES-2 ESTIMATED AVIAN FATALITIES (FOCAL RAPTOR SPECIES) AT FULL PROJECT CAPACITY (85.8 MW) BASED ON 2005-2011 BIRD YEAR ADJUSTED FATALITY RATES ...................................................................................................................................... 3 TABLE ES-3 COMPARISON OF ADJUSTED SPECIES FATALITY TOTALS OF FOUR FOCAL SPECIES, BASED ON AN AVERAGE FATALITY RATE (FATALITIES PER MEGAWATT PER YEAR) . 3 TABLE ES-4 SUMMARY OF IMPACTS, MITIGATION MEASURES, AND LEVELS OF SIGNIFICANCE .... 8 TABLE 2-1 LIST OF CUPS, LANDOWNERS AND APNS ................................................................. 18 TABLE 3-1 ADJUSTED APWRA-WIDE AVIAN FATALITY RATES PER MW PER YEAR ................ 32 TABLE 3-2 SUMMARY OF INSTALLED CAPACITY PER MEGAWATT YEAR FOR SCENARIOS ......... 33 TABLE 3-3 ESTIMATED AVIAN FATALITIES AT FULL PROJECT CAPACITY (85.8 MW) BASED ON 2008-2010 BIRD YEAR ADJUSTED FATALITY RATES ................................................. 33 TABLE 3-4 ESTIMATED AVIAN FATALITIES AT FULL PROJECT CAPACITY (85.8 MW) BASED ON 2005-2011 BIRD YEAR ADJUSTED FATALITY RATES ................................................. 34 TABLE 3-5 COMPARISON OF ADJUSTED SPECIES FATALITY TOTALS OF FOUR FOCAL SPECIES, BASED ON AN AVERAGE FATALITY RATE (FATALITIES

View Full Text

Details

  • File Type
    pdf
  • Upload Time
    -
  • Content Languages
    English
  • Upload User
    Anonymous/Not logged-in
  • File Pages
    302 Page
  • File Size
    -

Download

Channel Download Status
Express Download Enable

Copyright

We respect the copyrights and intellectual property rights of all users. All uploaded documents are either original works of the uploader or authorized works of the rightful owners.

  • Not to be reproduced or distributed without explicit permission.
  • Not used for commercial purposes outside of approved use cases.
  • Not used to infringe on the rights of the original creators.
  • If you believe any content infringes your copyright, please contact us immediately.

Support

For help with questions, suggestions, or problems, please contact us