
SPECIFICATION TRAILER IMPROVEMENTS NAIN, NL P/N: F6879-179214 PREPARED FOR Fisheries and Oceans Canada DATE August 8, 2017 Revision 1 List of Drawings Page 1 Trailer Improvements Nain, NL 2017-07-31 DRAWING NO TITLE C1 Site Plans A1 Trailer Plans A2 Trailer Elevations A3 Trailer Details A4 Trailer Millwork Details A5 New Shed Plans A6 New Shed Elevations A7 New Shed Details E1 Site Plan and Electrical Panel and Schedules E2 Floor Plans – New Electrical Layout and Legend M1 Floor plan – New Mechanical Layout and Schedules M2 Mechanical Details M3 Mechanical Specifications List of Contents Section 00 01 11 Page 1 Trailer Improvements Nain, NL 2017-07-31 Section Title Pages 01 10 10 SUMMARY OF WORK 9 01 29 83 PAYMENT PROCEDUREES FOR TESTING LABORATORY SERVICES 2 01 33 00 SUBMITTAL PROCEDURES 5 01 35 24 SPECIAL PROCEDURES ON FIRE SAFETY REQUIREMENTS 5 01 35 25 SPECIAL PROCEDURES ON LOCKOUT REQUIREMENTS 7 01 35 29.06 HEALTH AND SAFETY REQUIREMENTS 12 01 35 43 ENVIRONMENTAL PROCEDURES 2 01 45 00 TESTING AND QULAITY CONTROL 3 01 51 00 TEMPORARY UTILITIES 1 01 56 00 TEMPORARY BARRIERS AND ENCLOSURES 1 01 61 00 COMMON PRODUCT REQUIREMENTS 5 01 74 11 CLEANING 1 01 74 21 CONSTRUCTION/DEMOLITION WASTE MANAGEMENT AND DISPOSAL 5 01 78 00 CLOSEOUT SUBMITTALS 1 02 41 13 SELECTIVE SITE DEMOLITION 4 02 41 16 STRUCTURE DEMOLITION 5 03 10 00 CONCRETE FORMING AND ACCESSORIES 3 03 20 00 CONCRETE REINFORCING 4 03 30 00 CAST IN PLACE CONCRETE 9 03 35 00 CONCRETE FINISHING 4 06 05 73 WOOD TREATMENT 2 06 10 00 ROUGH CARPENTRY 5 06 17 53 SHOP FABRICATED WOOD TRUSSES 4 06 20 00 FINSIH CARPENTRY 5 06 40 00 ARCHITECTURAL WOODWORK 8 06 47 00 PLASTIC LAMINATE FINISHING 5 07 13 26 ROOF UNDERLAY 6 07 21 13 RIGID INSULATION 3 07 21 20 LOW EXPANDING FOAM SEALANT 3 07 21 23 LOOSE FILL INSULATION 4 07 26 00 VAPOUR RETARDERS 4 07 27 00 AIR BARRIERS 6 07 46 23 WOOD SIDING – PREFINSIHED 4 07 61 00 SHEET METAL ROOFING 5 07 62 00 SHEET METAL FLASHING AND TRIM 4 07 73 00 ROOF AND CRAWL SPACE VENT 2 07 92 00 JOINT SEALANTS 9 08 11 00 METAL DOORS AND FRAMES 9 08 14 16 FLUSH WOOD DOORS 3 08 31 00 ACCESS DOORS 2 08 36 13 SECTIONAL METAL OVERHEAD DOORS 6 08 71 00 DOOR HARDWARE 7 List of Contents Section 00 01 11 Page 2 Trailer Improvements Nain, NL 2017-07-31 09 21 16 GYPSUM BOARD ASSEMBLIES 7 09 65 16 RESILIENT SHEET FLOORING 4 09 65 17 LAMINATE FLOORING 5 09 91 24 INTERIOR REPAINTING 18 10 28 10 TOILET AND BATH ACCESSORIES 4 11 30 13 RESIDENTIAL FURNITURE AND APPLIANCES 6 12 21 13 HORIZONTAL LOUVRE BLINDS 4 23 82 33.04 HEAVY DUY BASEBOARD HEATERS 3 26 05 00 COMON WORK REUSLTS – ELECTRICAL 8 26 05 20 WIRE AND BOX CONNECTORS (0 - 1000V) 1 26 05 21 WIRES AND CABLES (0 - 1000V) 4 26 05 29 HANGERS AND SUPPORTS FOR ELECTRICAL SYSTEMS 2 26 05 31 SPLITTERS, JUNCTION, PULL BOXES AND CABINETS 2 26 05 32 OUTLET BOXES, CONDUIT BOXES AND FITTINGS 1 26 05 34 CONDUITS, CONDUI FASTENINGS AND CONDUIT FITTINGS 4 26 05 43.01 INSTALLATION OF CABLES IN DUCTS 2 26 24 16.01 PANELBOARDS BREAKER TYPE 2 26 27 26 WIRING DEVICES 3 26 28 16.02 MOULDED CASE CURCUIT BREAKERS 2 26 28 20 GROUND FAULT CIRCUIT INTERRUPTERS – CLASS “A” 2 26 50 00 LIGHTING 3 26 80 00 COMMISSIONING OF ELECTRICAL SYSTEMS 3 31 00 00 EARTHWORKS AND RELATED WORKS 6 31 11 00 CLEARING AND GRUBBING 4 31 22 13 ROUGH GRADING 2 31 23 33 EXCAVATING TRENCHING AND BACKFILLING 9 33 46 13 FOUNDATION AND UNDERSLAB DRAINAGE 3 33 65 76 DIRECT BURIED UNDERGROUND CABLE DUCTS 3 Summary of Work Section 01 11 10 Page 1 Trailer Improvements Nain, NL 2017-07-31 1.1 SCOPE .1 The work consists of the furnishing of all plant, labour, equipment and material for Trailer improvements in Nain, NL, in strict accordance with specifications and accompanying drawings and subject to all terms and conditions of the Contract. .2 Carry out mechanical/plumbing work in accordance with the latest edition of the Plumbing codes of Canada. Specifications related to the mechanical requirements associated with this project are included on the drawings. 1.2 DESCRIPTION OF .1 In general, work under this contract WORK consists of refurbishment of the existing trailer and construction of a new shed, as outlined on the drawings. Do not proceed with any portion of the work until the Departmental Representative has approved the Contractor’s written work plan. Review the Hazardous Material Assessment Report, attached as an appendix to these specifications, and abide by all Regulatory requirements for the removal, disturbance, handling and disposal of hazardous building materials. 1.3 SITE OF WORK .1 Work will be carried out in Nain, Labrador, NL. 1.4 DATUM .1 If requested by the Contractor, the Departmental Representative will establish a benchmark prior to the start of work activities. 1.5 FAMILIARIZATION .1 Before submitting a bid, it is recommended WITH SITE that bidders visit the site and its surroundings to review and verify the form, nature and extent of the work, materials needed for the completion of the Summary of Work Section 01 11 10 Page 2 Trailer Improvements Nain, NL 2017-07-31 work, the means of access to the site, any accommodations they may require, and in general shall obtain all necessary information as to risks, contingencies and other circumstances which may influence or affect their bid or costs to do the work. No allowance shall be made subsequently in this connection on account of error or negligence to properly observe and determine the conditions that will apply. .2 Contractors, bidders or those they invite to site are to review specification Section 01 35 29.06 - Health and Safety Requirements before visiting site. Take all appropriate safety measures for any visit to site, either before or after acceptance of bid. .3 Obtain prior permission from the Departmental Representative before carrying out such site inspection. 1.6 CODES AND .1 Perform work in accordance with the latest STANDARDS edition of the National Building Code of Canada, and any other code of provincial or local application including all amendments up to project bid closing date provided that in any case of conflict or discrepancy, the more stringent requirements shall apply. .2 Materials and workmanship must meet or exceed requirements of specified standards, codes and referenced documents. 1.7 TERM ENGINEER .1 Unless specifically stated otherwise, the term Engineer where used in the Specifications and on the Drawings shall mean the Departmental Representative. Summary of Work Section 01 11 10 Page 3 Trailer Improvements Nain, NL 2017-07-31 1.8 SETTING OUT .1 Set grades and layout work in detail from WORK control points and grades established by Departmental Representative. .2 Assume full responsibility for and execute complete layout of work to locations, lines and elevations indicated or as directed by Departmental Representative. .3 Provide devices needed to layout and construct work. .4 Supply such devices required to facilitate Departmental Representative's inspection of work. 1.9 COST BREAKDOWN .1 Before submitting first progress claim submit breakdown of Contract price in detail as directed by Departmental Representative and aggregating contract price. .2 Provide cost breakdown in same format as the numerical and subject title system used in this specification project manual and thereafter sub-divided into major work components as directed by Departmental Representative. .3 Upon approval by Departmental Representative, cost breakdown will be used as basis for progress payment. .4 This will be a lump sum project. Individual work items will not be measured separately for payment. 1.10 WORK SCHEDULE .1 Submit within 7 work days of notification of acceptance of bid, a construction schedule showing commencement and completion of all work within the time stated on the Bid and Acceptance Form and the date stated in the bid acceptance letter. Summary of Work Section 01 11 10 Page 4 Trailer Improvements Nain, NL 2017-07-31 .2 Provide sufficient details in schedule to clearly illustrate entire implementation plan, depicting efficient coordination of tasks and resources, to achieve completion of work on time and permit effective monitoring of work progress in relation to established milestones. .3 As a minimum, work schedule to be prepared and submitted in the form of Bar (GANTT) Charts, indicating work activities, tasks and other project elements, their anticipated durations and planned dates for achieving key activities and major project milestones provided in sufficient details and supported by narratives to demonstrate a reasonable plan for completion of project within designated time. Generally Bar Charts derived from commercially available computerized project management system are preferred but not mandatory. .4 Submit schedule updates on a minimum bi- weekly basis and more often, when requested by Departmental Representative, due to frequent changing project conditions. Provide a narrative explanation of necessary changes and schedule revisions at each update. .5 The schedule, including all updates, shall be to Departmental Representative's approval. Take necessary measures to complete work within approved time. Do not change schedule without Departmental Representative's approval. .6 All work on the project will be completed within the time indicated on the Bid and Acceptance Form. 1.11 ABBREVIATIONS .1 Following abbreviations of standard Summary of Work Section 01 11 10 Page 5 Trailer Improvements Nain, NL 2017-07-31 specifications have been used in this specification and on the drawings: CGSB - Canadian Government Specifications Board CSA - Canadian Standards Association NLGA - National Lumber Grades Authority ASTM - American Society for Testing and Materials .2 Where these abbreviations and standards are used in this project, latest edition in effect on date of bid call will be considered applicable.
Details
-
File Typepdf
-
Upload Time-
-
Content LanguagesEnglish
-
Upload UserAnonymous/Not logged-in
-
File Pages398 Page
-
File Size-