Final Feasibility Report

Final Feasibility Report

Public Works Department Government of Rajasthan Consultancy Services for Preparation of Feasibility Report for Gadoj (State Border) – Majri to HR/ RJ Border and Majri to Neemrana (SH-111 & 111A) Highway Project (the “Highway-V”) Package-26 VOLUME-I FINAL FEASIBILITY REPORT MARCH 2017 Submitted to: Additional Chief Engineer (PPP) Public Works Department (PWD) 1-Jacob Road, Jaipur-302006 Rajasthan, India By Pentacle Consultants (India) Private Limited, Mumbai In Consortium with Techosum Engineers & Consultants Private Limited, Jaipur Public Works Department Consultancy Services for Preparation of Final Feasibility Report for Two laning of Km0+000 to Km 46+400comprising the section of SH- 111 & 111A from Gadoj-Behror-Haryana Border(the “Highway-V”) Government of Rajasthan FINAL FEASIBILITY REPORT TABLE OF CONTENTS CHAPTER – 1: INTRODUCTION....................................................................................................... 10 1.1 GENERAL .........................................................................................................................................10 1.2 COMMENCEMENT ........................................................................................................................11 1.3 PROJECT DESCRIPTION ...............................................................................................................11 1.4 SCOPE OF SERVICES ...........................................................................................................................13 1.5 COMPOSITION OF REPORT ..................................................................................................................14 CHAPTER 2: EXECUTIVE SUMMARY ............................................................................................ 16 2.1 THE MAIN FEATURES OF THE HIGHWAY ARE CAPTURED BELOW: ..................................................................16 2.1.1 TERRAIN & LAND USE .......................................................................................................................16 2.1.2 LANE CONFIGURATION ......................................................................................................................17 2.1.3 PAVEMENT CONDITION OF THE EXISTING ROAD .....................................................................................17 2.1.4 PROPOSED BYPASSES: .......................................................................................................................18 2.1.5 PROPOSED WIDENING OF EXISTING ROAD TO FOUR LANE SECTION WITH SERVICE ROAD BOTH SIDE: .................18 2.1.6 CROSS-DRAINAGE STRUCTURES ..........................................................................................................18 2.1.7 FLOOD PRONE STRETCHES DURING MONSOON .....................................................................................19 2.1.8 RIGHT OF WAY (ROW) .....................................................................................................................19 2.1.7 UTILITIES ALONG THE PROPOSED PROJECT ROAD ...................................................................................19 2.2 PROPOSED LANE CONFIGURATION .......................................................................................................19 2.2.1 PROPOSED CRUST COMPOSITION ........................................................................................................20 2.2.2 JUNCTIONS ......................................................................................................................................20 2.2.3 TOLL PLAZA ..................................................................................................................................22 2.2.4 BUS BAYS AND BUS SHELTERS .....................................................................................................22 2.2.5 TRUCK LAY BYES ...............................................................................................................................23 2.2.6 DRAIN CUM FOOTPATH ...............................................................................................................23 March 2017 Page 1 Public Works Department Consultancy Services for Preparation of Final Feasibility Report for Two laning of Km0+000 to Km 46+400comprising the section of SH- 111 & 111A from Gadoj-Behror-Haryana Border(the “Highway-V”) Government of Rajasthan FINAL FEASIBILITY REPORT 2.2.7 COST ESTIMATES ..............................................................................................................................23 CHAPTER – 3: SOCIO- ECONOMIC PROFILE ............................................................................... 24 3.1 GENERAL ......................................................................................................................................24 3.2 GEOGRAPHICAL FEATURES..................................................................................................................24 3.3 DEMOGRAPHIC FEATURES ..................................................................................................................25 CHAPTER – 4: ENGINEERING SURVEYS AND INVESTIGATIONS ............................................ 27 4.1 ROAD INVENTORY .............................................................................................................................27 4.2 PAVEMENT CONDITION SURVEY ..........................................................................................................30 4.3 EXISTING CRUST COMPOSITION ...........................................................................................................33 4.4 BENKELMAN BEAM DEFLECTION SURVEY ..............................................................................................34 4.5 INVENTORY OF BRIDGES AND CULVERTS ...............................................................................................34 4.6 CONDITION SURVEYS FOR BRIDGES AND CULVERTS ..................................................................................36 4.6.1 BRIDGES..........................................................................................................................................36 4.6.2 CULVERTS ........................................................................................................................................36 4.7 TOPOGRAPHICAL SURVEY ...................................................................................................................39 4.7.1 RECONNAISSANCE SURVEY .................................................................................................................39 4.7.2 HORIZONTAL AND VERTICAL CONTROL .................................................................................................39 4.7.3 ESTABLISHING TEMPORARY BENCHMARKS ............................................................................................39 4.7.4 TOTAL STATION TRAVERSE .................................................................................................................39 4.7.5 L-SECTION AND X-SECTION SURVEY .....................................................................................................40 4.7.6 DETAILED SURVEY .............................................................................................................................40 CHATER – 5: TRAFFIC SURVEYS AND ANALYSIS ...................................................................... 41 5.1 INTRODUCTION ................................................................................................................................41 5.2 TRAFFIC INTENSITY ............................................................................................................................42 5.2.1 TRAFFIC VOLUME SURVEY ..................................................................................................................42 March 2017 Page 2 Public Works Department Consultancy Services for Preparation of Final Feasibility Report for Two laning of Km0+000 to Km 46+400comprising the section of SH- 111 & 111A from Gadoj-Behror-Haryana Border(the “Highway-V”) Government of Rajasthan FINAL FEASIBILITY REPORT 5.2.2 AVERAGE DAILY TRAFFIC....................................................................................................................43 5.2.3 SEASONAL VARIATION FACTOR .................................................................................................46 5.3 AXLE LOAD SURVEY ..........................................................................................................................50 5.3.1 GENERAL .........................................................................................................................................50 5.3.2 LOCATION OF SURVEY........................................................................................................................50 5.3.3 VEHICLE DAMAGE FACTOR (VDF) .......................................................................................................50 5.4 TRAFFIC FORECAST ............................................................................................................................51 5.4.1 TRAFFIC GROWTH RATES ...................................................................................................................51 5.4.2 PROJECTED TRAFFIC ..........................................................................................................................51 5.4.2.1 TRAFFIC PROJECTION AND CAPACITY ...................................................................................51

View Full Text

Details

  • File Type
    pdf
  • Upload Time
    -
  • Content Languages
    English
  • Upload User
    Anonymous/Not logged-in
  • File Pages
    100 Page
  • File Size
    -

Download

Channel Download Status
Express Download Enable

Copyright

We respect the copyrights and intellectual property rights of all users. All uploaded documents are either original works of the uploader or authorized works of the rightful owners.

  • Not to be reproduced or distributed without explicit permission.
  • Not used for commercial purposes outside of approved use cases.
  • Not used to infringe on the rights of the original creators.
  • If you believe any content infringes your copyright, please contact us immediately.

Support

For help with questions, suggestions, or problems, please contact us