Integrated Watershed Management Project, West Bengal

Integrated Watershed Management Project, West Bengal

Project no IWMP/ 05 /2011-12 Name of Watershed: Chapramari Watershed District Jalpaiguri INTEGRATED WATERSHED MANAGEMENT PROJECT, WEST BENGAL Summary of DPR Section A: PROJECT LOCATION DETAILS Sl.No Particulars Details 1 Project Name CHAPRAMARI WATRSHED 2 Project Code IWMP/ 05 /20 11-12 3 State WEST BENGAL 4 District JALPAIGURI 5 CD Block NAGRAKATA 6 Gram Panchayat SULKAPARA 7 Mouza (Village) Block G P Name Jl.No Village Code NAGRAKATA SULKAPARA Upper Tendu Forest (M) 1(M) 00089700 8 Watershed Committee * Name Regd. No. Remarks 1) SIPCHU S/2L/15373 2) PANJHORA S/2L/15372 3) NEW KHUNIA S/2L/16927 4) NORTH INDONG S/2L/15378 9 Micro watershed Description Micro Block GP Name of Mouza Jl.no Vill Code watershed SIPCHU NAGRAKATA SULKAPARA UPPER TENDU (M) 1(M) 00089700 PANJHORA NAGRAKATA SULKAPARA UPPER TENDU (M) 1(M) 00089700 NEW KHUNIA NAGRAKATA SULKAPARA UPPER TENDU (M) 1(M) 00089700 NORTH INDONG NAGRAKATA SULKAPARA UPPER TENDU (M) 1(M) 00089700 10 Weight age (Table 1.3) 87 Out of 150 11 Project Cost ( Rs in Lakh) 516.00 Note * additional rows may be inserted 14 Project no IWMP/ 05 /2011-12 Name of Watershed: Chapramari Watershed District Jalpaiguri SECTION B SOCIO ECONOMIC PROFILE OF THE PROJECT AREA Ref Table No. Sl.No Particulars Details DPR (Format) Name of Project Implementing Agency D.F.O Soil conservation Division , 1 (PIA) Hakimpara, Jalpaiguri Other: - Govt. Of West Bengal Nature of PIA (a) VO b) Panchayat c) 2 Department of Forest Soil conservation Others) Division Jalpaiguri 3 Total Population in the Watershed 1 3.12 1560 4 Total Number of households 3.12.1 327 5 Total Number of ST households {ST Population /(Total Population / Total 118 Family)} 6 Total Number of SC households {SC Population /(Total Population / Total 70 Family)} 7 Total Number of BPL households 3.12.1 228 8 Total Number of Small Farmer household 2 (appox) ( may be Computed from Agri 3.14 99 Census 2005-06 and table 3.14) 9 Total number of Marginal farmer household3 (appox) ( may be Computed 3.14 190 from Agri Census 2005-06 and table 3.14) 10 Total number of landless and asset less 3.14 17 households (BPL + Landless families) 11 Number of person days of seasonal 3.22 16386 migration Note: 1 Sum total of population of all the villages in the project area 2 A farmer cultivating (as owner, tenant or sharecropper) agricultural land upto 1 ha (2.5 acre) 3 A farmer cultivating (as owner, tenant or sharecropper) agricultural land more than 1 ha up to 2 ha Section C: Other Detail from Base line Survey Sl.No Description Ref Table No. DPR (Format) Particulars 1 Total geographical area (ha) Executive Summary 8984.12 2 Treatable area 1.a.Waste land fit for agriculture (ha) Executive Summary 0 1.b.Waste land unfit for agriculture(ha) Executive Summary 235.86 1.c. Wasteland with degraded forest area Executive Summary 3863.68 and fringe area available for treatment Total Waste land Executive Summary 4098.54 2.Rain fed agriculture land (ha) Executive Summary 200.46 Total Treatable Area (ha) {1a+1b+1c +2} 4300 3 Forest area Executive Summary 8482.81 4 Total cropped area (ha) 2 Table 3.9 (Calculated) 874 5 Net sown area (ha) 3 Table 3.8 & Table 3.9 437 Average Cropping Intensity {Sl.3/Sl.4 6 Table 3.8 200% x 100} 7 Total No. of water storage structure4 Table 3.3 4 Total storage capacity of water storage structure (cum) (Example, 8 Volume-= length x breadth x avg. Table 3.3 443.288m3 depth x no of water storage structures) 9 Total number of water extracting Table 3.5 4 15 Project no IWMP/ 05 /2011-12 Name of Watershed: Chapramari Watershed District Jalpaiguri units 5 10 Depth of ground water (bgl) in m a) Pre monsoon 5.49 b) Post monsoon 2.65 Note : 1Total Treatable area excludes area under habitation, steep slopes, snow covered area, rock mountains, roads, forest , assured irrigation etc. 2 Total Cropped area represent total area sown once or more than once in a particular year i.e. the area counted as many times as they are sowings in a year. This total area is known as Gross Crop Area. 3 Net Sown Area represent the total area sown with crops and orchards. Area sown more than once in a same year is counted only once. 4 Total number of water structure includes ponds, tanks, check dams, any other surface water storage structures. 5 Total number of water extracting units include wells, bore wells, hand pumps, shallow tube wells, Medium shallow tube wells, deep tube wells. Section D: Year wise Action plan (Physical) (kindly fill in figures. i.e 0.00 instead of NIL) Ref table 2013- Sl.no Particulars of DPR 2014-15 2015-16 2016-17 2017-18 Total 14 Format 1 Watershed Development works 1.1 Land Development 1.1.1 A forestation (on wasteland) (ha) Table 10.3 0.00 40.00 40.00 0.00 0.00 80.00 (Plantation and nursery) 1.1.2 A forestation (on other land) Table 10.3 0.00 0.00 0.00 0.00 0.00 0.00 1.1.3 Horticulture (on waste land) Table 10.3 0.00 0.00 0.00 0.00 0.00 0.00 (ha) 1.1.4 Horticulture (on other land) Table 10.3 0.00 0.00 0.00 0.00 0.00 0.00 (ha) 1.1.5 Agriculture (on waste land) Table 10.3 0.00 0.00 0.00 0.00 0.00 0.00 (ha) 1.1.6 Agriculture (on other land) (ha) Table 10.3 0.00 0.00 0.00 0.00 0.00 0.00 1.1.7 Pasture Dev ( on waste land) Table 10.3 0.00 0.00 0.00 0.00 0.00 0.00 (ha) 1.1.8 Pasture dev (on other land) Table 10.3 0.00 0.00 0.00 0.00 0.00 0.00 1.2 Soil and moisture conservation 1.2.1 Staggered Tranching (ha) 0.00 0.00 0.00 0.00 0.00 0.00 1.2.2 Contour Bunding (ha) 0.00 0.00 0.0 0.00 0.00 0.00 1.2.3 Graded Bunding (ha) 0.00 0.00 0.00 0.00 0.00 0.00 1.2.4 Bench terracing (ha) 0.00 0.00 0.00 0.00 0.00 0.00 1.2.5 Others 0.00 0.00 0.00 0.00 0.00 0.00 1.3 Vegetative & Engg. Structure 1.3.1 Earthen Checks (cum) 0.00 0.00 0.00 0.00 0.00 0.00 1.3.2 Bush Wood Checks (m) 0.00 0.00 0.00 0.00 0.00 0.00 1.3.3 Gully Plugs (cum) 0.00 0.00 0.00 0.00 0.00 0.00 1.3.4 Loose boulders (cum) ( 0.00 0.00 0.00 0.00 0.00 0.00 1.3.5 Gabion Structures (cum) 0.00 0.00 0.00 0.00 0.00 0.00 1.3.6 Others (nos) C.C Drain for Table 10.3 0.00 872.83 872.83 872.83 irrigation channel (cum) 1.3.7 R.C.C Box culvert/slab Table 10.3 0.00 1 no. 2 no. 2no. 0.00 5nos. culvert/hume pipe culvert 1.3.8 Irrigation Chanel/jhampi (RMT) Table 10.3 2970 0.00 5160 0.00 0.00 8130.00 1.3.9 Check dam for diversities Table 10.3 45.54 0.00 0.00 0.00 0.00 45.54 channel (cum) 1.3.10 Boulder sausage works Table 10.3 1266.58 978.1525 978.1525 978.1525 978.1525 5179.19 1.3.11 Retaining wall (cum) Table 10.3 19.80 422.24 443.84 0.00 0.00 885.88 1.3.12 C.C water tank with PVC pipe Table 10.3 2nos. 0.00 0.00 0.00 0.00 2nos. supply 1.4 Water harvesting structure (New) 1.4.1 Farm Pond (no,) 1 0.00 0.00 0.00 0.00 1 16 Project no IWMP/ 05 /2011-12 Name of Watershed: Chapramari Watershed District Jalpaiguri Ref table 2013- Sl.no Particulars of DPR 2014-15 2015-16 2016-17 2017-18 Total 14 Format (Cum) Table 10.3 1083.90 0.00 0.00 0.00 0.00 1083.90 1.4.2 Check Bund (no,) Table 10.3 0.00 0.00 0.00 0.00 0.00 0.00 (cum) Table 10.3 0.00 0.00 0.00 0.00 0.00 0.00 1.4.3 Nullah Bund (no.) Table 10.3 0.00 0.00 0.00 0.00 0.00 0.00 (cum) Table 10.3 0.00 0.00 0.00 0.00 0.00 0.00 1.4.4 Percolation Tank (no.) Table 10.3 1 0.00 0.00 0.00 0.00 1 nos. (Cum) Table 10.3 52.27 0.00 0.00 0.00 0.00 52.27 1.4.5 Ground water recharge Table 10.3 0.00 0.00 0.00 0.00 0.00 0.00 structures. (no.) (Cum) Table 10.3 0.00 0.00 0.00 0.00 0.00 0.00 1.4.6 Others(no.) Table 10.3 0.00 0.00 0.00 0.00 0.00 0.00 (cum) Table 10.3 0.00 0.00 0.00 0.00 0.00 0.00 1.5 Water harvesting structure (renovated) 1.5.1 Farm Pond (no,) Table 10.3 0.00 0.00 443.288 0.00 0.00 443.288 (cum) Table 10.3 0.00 0.00 0.00 0.00 0.00 0.00 1.5.2 Check Bund (no,) Table 10.3 0.00 0.00 0.00 0.00 0.00 0.00 (cum) Table 10.3 0.00 0.00 0.00 0.00 0.00 0.00 1.5.3 Nullah Bund (no.) Table 10.3 0.00 0.00 0.00 0.00 0.00 0.00 (cum) Table 10.3 0.00 0.00 0.00 0.00 0.00 0.00 1.5.4 Percolation Tank (no.) Table 10.3 0.00 0.00 0.00 0.00 0.00 0.00 (cum) Table 10.3 0.00 0.00 0.00 0.00 0.00 0.00 1.5.5 Ground water recharge 0.00 0.00 0.00 0.00 0.00 0.00 Table 10.3 structures.

View Full Text

Details

  • File Type
    pdf
  • Upload Time
    -
  • Content Languages
    English
  • Upload User
    Anonymous/Not logged-in
  • File Pages
    9 Page
  • File Size
    -

Download

Channel Download Status
Express Download Enable

Copyright

We respect the copyrights and intellectual property rights of all users. All uploaded documents are either original works of the uploader or authorized works of the rightful owners.

  • Not to be reproduced or distributed without explicit permission.
  • Not used for commercial purposes outside of approved use cases.
  • Not used to infringe on the rights of the original creators.
  • If you believe any content infringes your copyright, please contact us immediately.

Support

For help with questions, suggestions, or problems, please contact us