Biogas Raw Materials Mapping for Tartu City and Region and Business Plan for Production Plant

Biogas Raw Materials Mapping for Tartu City and Region and Business Plan for Production Plant

Biogas raw materials mapping for Tartu city and region and business plan for production plant This publication has been produced with the assistance of the European Union (http://europa.eu). The content of this publication is the sole responsibility of Baltic Biogas Bus and can in no way be taken to reflect the views of the European Union." 1 Author: SEI Tallinn, ERKAS Valduse OÜ, Mõnus Minek OÜ Project Manager: Jaanus Tamm, Tartu City Government Date: 21.08.2012 Reviewed by: Jaanus Tamm, Tartu City Government 2 Contents Summary.....................................................................................................................................................6 A.AVAILABILITY OF BIOGAS RAW MATERIAL IN TARTU CITY AND COUNTY. ITS USAGE IN PRODUCING FUEL FOR TARTU CITY BUSES.......................................................................................................................8 1.Purpose and scope of the study...............................................................................................................8 2.Methodology............................................................................................................................................9 3.Analysis of mixed municipal waste.........................................................................................................10 4Overview of biogas raw material generated in Tartu City and County....................................................23 5Cost, availability and procurement terms of biogas raw material...........................................................39 6Estimated amount of biogas....................................................................................................................60 7Summary..................................................................................................................................................65 ANNEX A-1 – Summary of the results of the sorting study by study periods.............................................71 ANNEX A-2 – Waste generation forecast for 2010-2020...........................................................................73 B. FEASIBILITY AND PROFITABILITY STUDY ON CONSTRUCTION OF A BIOGAS PLANT TO PRODUCE FUEL FOR TARTU CITY BUSES..............................................................................................................................74 1.Objectives and Research Questions........................................................................................................74 2.Methodology..........................................................................................................................................75 3.Analysis of existing situation...................................................................................................................76 4.Technical, structural, environmental and safety requirements of biogas plant construction.................89 5.Technology and production process.......................................................................................................90 6.Target Groups and Client Base..............................................................................................................104 7Competition analysis.............................................................................................................................107 8.Financial Analysis and Evaluation of Financial Perspectives.................................................................113 9.Risk Analysis..........................................................................................................................................116 10.Environmental Impacts.......................................................................................................................119 11.Summary.............................................................................................................................................129 Used Literature and Sources....................................................................................................................131 ANNEX B-1 Terms of Reference for Compiling a Feasibility-Profitability Analysis for the Biogas Plant...132 ANNEX B-2 Control-Sheet of Environmental Impact Pre-Assessment ....................................................134 3 Financial Analysis and Financial Perspectives. Establishing a Biogas Plant for the Production of Fuel for Tartu City Transport ................................................................................................................................138 1. Introduction.........................................................................................................................................138 2. Method................................................................................................................................................139 3. Basic data.............................................................................................................................................140 4. Financial analysis.................................................................................................................................141 5. Summary..............................................................................................................................................152 C. STUDY OF THE COMMERCIAL USE POSSIBILITIES OF AARDLAPALU LANDFILL GASES..........................153 1.Introduction..........................................................................................................................................155 2.Objective...............................................................................................................................................155 3.Methods...............................................................................................................................................155 4.Results..................................................................................................................................................161 5. Summary and recommendations........................................................................................................176 Annex C-1. Initial task to Tartu City Government procurement for the “Carrying out the commercial possibilities of Aardlapalu landfill gases study”.......................................................................................183 Annex C-2. The location of the landfill gas pipeline exiting Aardlapalu region landfill............................187 Annex C-3. Estimated production of landfill gases in Aardlapalu until 2050...........................................188 Annex C-4. Data from Pääsküla landfill....................................................................................................190 Annex C-5. Data from Jõelähtme landfill.................................................................................................191 Annex C-6. Data from Daibe (Latvia) landfill............................................................................................192 Annex C-7. Route of the possible designed pipeline................................................................................193 Annex C-8. Quotation by AS EG Võrguteenus..........................................................................................195 Annex C-9. Quotation by Metener Oy.....................................................................................................196 Annex C-10. Quotation by Xebec.............................................................................................................199 Annex C-11. Quotation by Filter AS for cogeneration device GE Jenbacher JMS 208 GS.........................200 Annex C-12. Quotation by CHP Solutions Baltic Marine Group...............................................................204 Annex C-13. Transport of purified biogas by pipeline and selling as motor fuel in gas station at 0.39EUR/m3 (6.09 kr/m3); at VAT 0.47 EUR/m3 or 0.68EUR/kg)............................................................205 Annex C-14. Transport of purified biogas by pipeline and selling as motor fuel in gas station at 0.39EUR/m3 (6.09 kr/m3); at VAT 0.47 EUR/m3 or 0.68EUR/kg); devices replaced twice......................206 Annex C-15. Landfill gas is purified on Aardlapalu, transported to city of Tartu as bottled gas and sold as motor fuel in a gas station at 0.39EUR/m3 price (not including VAT)......................................................207 4 Annex C-16. Landfill gas is purified on Aardlapalu, transported to city of Tartu as bottled gas and sold as motor fuel in a gas station at 0.39EUR/m3 price (not including VAT), devices replaced twice................208 Annex C-17. Landfill gas is purified on Aardlapalu, transported to city of Tartu as bottled gas and sold as motor fuel in a gas station at 0.39EUR/m3 price (not including VAT), maximal cost 0.3EUR/m3 per landfill gas Nm3...................................................................................................................................................209 Annex C-18. Landfill gas will be purified in Aardlapalu, transported to Roiu category c natural gas network by pipeline at 0.39EUR/m3 selling price....................................................................................210 Annex C-19. Landfill gas will be purified in Aardlapalu, transported to Roiu category c natural gas network by pipeline (at natural gas pipeline manager network service

View Full Text

Details

  • File Type
    pdf
  • Upload Time
    -
  • Content Languages
    English
  • Upload User
    Anonymous/Not logged-in
  • File Pages
    229 Page
  • File Size
    -

Download

Channel Download Status
Express Download Enable

Copyright

We respect the copyrights and intellectual property rights of all users. All uploaded documents are either original works of the uploader or authorized works of the rightful owners.

  • Not to be reproduced or distributed without explicit permission.
  • Not used for commercial purposes outside of approved use cases.
  • Not used to infringe on the rights of the original creators.
  • If you believe any content infringes your copyright, please contact us immediately.

Support

For help with questions, suggestions, or problems, please contact us