Iport Bridge Scheme Public Consultation 3 August - 31 August 2020

Iport Bridge Scheme Public Consultation 3 August - 31 August 2020

iPort Bridge Scheme Public Consultation 3 August - 31 August 2020 TRANSFORMING CITIES FUND Introduction Welcome to the iPort Bridge Scheme public consultation. South Yorkshire Passenger Transport Executive is currently progressing plans for a new bus, pedestrian and cycle bridge across the River Torne between New Rossington and the iPort Logistics Park and Strategic Rail Freight Interchange (iPort) located in south-east iPort Bridge Scheme Doncaster to improve direct access for public transport and active travel. The purpose of this document is to provide information about the iPort Bridge Scheme. SYPTE is seeking feedback from you on the scheme to help inform the design development work in advance of submission of a planning application to Doncaster Council. 2 The Proposed Scheme Doncaster M18 Town Centre M18 Great Yorkshire Way iPort Avenue A638 West End Lane iPort Click any of the following Nature Reserve Proposed Scheme Pheasant Rossington to show them on the map: Hill Park Travel Access Country Park New Rossington Locations River Torne 3 Design The iPort Bridge proposals will provide Overview of the key features of the iPort Bridge a bridge link over the River Torne connecting iPort Avenue with West End Proposed Lane to the east. bus stop Footway Signal Crossing The new route will provide a bus lane with a segregated two-way cycleway and footway to the north of the vehicle carriageway. Bus Proposed Proposed east- Signal bus layby Landscaping bound bus stop Crossing movement in both directions will be limited to the single lane bus route by traffic signal controls to the east and west. Stopping provision for two buses is provided at the Bus eastern and western ends of the new link. The Lane route will not be open to private cars or goods vehicles. Footway and cycleway connections on the new bridge connect with existing provision on iPort Avenue and West End Lane. Additional footway connections on the eastern side of the river Bridge over the Single carriageway Segregated Proposed junction River Tome section cycle lane with West End Lane provide links north and south to residential areas currently being built. Proposed junction Proposed west- onto Iport Avenue bound bus stop Cross-section of the iPort Bridge Bus Lane Planting Cycle Lane Footway 4 Movement The following map provides an overview on how transport movements are being considered as part of the scheme development. Doncaster M18 The scheme will make iPort more accessible Town Centre through sustainable transport and aims to reduce private vehicles to/from iPort. It will also encourage using sustainable travel in the wider area, specifically bus, cycle and M18 Great Yorkshire Way pedestrian connections between the iPort commercial area and existing residential areas of Rossington, New Rossington and Littleworth as well as new build residential development at Pheasant Hill Park. West End Lane A638 Click any of the following to show them on the map: The existing bus routes (AM1, AM2, i4, 57a/57c and 205) are not proposing to be changed Nature Reserve Click the icons on the map for more information Rossington 5 River Torne Feedback and Next Steps Thank you for taking the time to read this document. Your views are important to us in shaping the final design of the iPort Bridge. To share your feedback, please complete the questionnaire on the SYPTE website 3rd August - by 31 August 2020. Should you have any 31st August Pre-planning public difficulties accessing information digitally or need consultation help in completing the questionnaire, contact the project team using the details below. To find out more information about the Scheme, please join one of our online Q&A sessions where members of the project team will be available to listen to your views, answer any Feedback and analysis questions you have and provide further detail. To register for one of these sessions, visit the webpage or contact the project team below. Contact and registration details Autumn 2020 Preparation of the Statement https://travelsouthyorkshire.com/iport of Community Involvement [email protected] 01709 51 51 51 Submit planning application Click here to provide feedback Share with us your thoughts about the iPort Bridge proposal. 6 www.sheffieldcityregion.org.uk.

View Full Text

Details

  • File Type
    pdf
  • Upload Time
    -
  • Content Languages
    English
  • Upload User
    Anonymous/Not logged-in
  • File Pages
    7 Page
  • File Size
    -

Download

Channel Download Status
Express Download Enable

Copyright

We respect the copyrights and intellectual property rights of all users. All uploaded documents are either original works of the uploader or authorized works of the rightful owners.

  • Not to be reproduced or distributed without explicit permission.
  • Not used for commercial purposes outside of approved use cases.
  • Not used to infringe on the rights of the original creators.
  • If you believe any content infringes your copyright, please contact us immediately.

Support

For help with questions, suggestions, or problems, please contact us