Perencanaan Pemecah Gelombang (Breakwater)

Perencanaan Pemecah Gelombang (Breakwater)

Universitas Indonesia Library >> UI - Skripsi (Open) Perencanaan Pemecah Gelombang (breakwater) di Pelabuhan Merak = Breakwater Planning at Merak Port Febriansyah, author Deskripsi Lengkap: http://lib.ui.ac.id/abstrakpdf.jspdetail?id=20377231&lokasi=lokal ------------------------------------------------------------------------------------------ Abstrak [<b>ABSTRAK</b><br> Pelabuhan Merak, Banten merupakan pelabuhan penyeberangan selat Sunda. Permasalahan yang kerap terjadi di pelabuhan Merak adalah dalam mobilitas kapal yang sering terganggu dan menjadi lebih lama akibat kondisi perairan kurang tenang. Rasio v/c saat ini bahkan sudah mencapai 0,95. Oleh sebab itu perlu dibangun pemecah gelombang yang dapat melindungi pelabuhan agar kondisi perairan menjadi lebih tenang. Tujuan dari penelitian ini adalah merencanakan ulang tata letak dan desain pemecah gelombang di pelabuhan Merak. Pemecah gelombang yang direncanakan adalah tipe sisi miring dari material batu pecah atau tetrapod dengan tiga alternatif kemiringan. Alternatif yang paling memungkinkan adalah alternatif II dengan volume yang tidak terlalu besar dibanding alternatif III, yaitu 245,05 m3 per 1 meter panjangnya dan memiliki kelandaian yang dapat meredam gelombang lebih efektif dibanding alternatif I. Dengan adanya breakwater ini, kapasitas pelabuhan dapat meningkat sehingga rasio v/c berkurang menjadi 0,57. <b>ABSTRAK</b><br> Port of Merak, Banten is a port of Sunda Strait crossing. The problems that often occur at the Merak port is the mobility of the ship which is often disturbed and becomes longer due to less calm water conditions. Therefore it is necessary to build a breakwater to protect the port so that the water conditions become calmer. The purpose of this study is to plan the layout and redesign breakwater at the Merak port. Planned breakwater is the sloping type made of broken stone or tetrapod material with three alternatives, namely the slope of cot  = 1.5, cot  = 2, and cot  = 3. The most likely alternative is the alternative II with a volume that is not too large compared to the alternative III, which is 245.05 m3 per 1 meter in length and has a slope that can absorbs wave energy more effective than the alternative I., Port of Merak, Banten is a port of Sunda Strait crossing. The problems that often occur at the Merak port is the mobility of the ship which is often disturbed and becomes longer due to less calm water conditions. Therefore it is necessary to build a breakwater to protect the port so that the water conditions become calmer. The purpose of this study is to plan the layout and redesign breakwater at the Merak port. Planned breakwater is the sloping type made of broken stone or tetrapod material with three alternatives, namely the slope of cot  = 1.5, cot  = 2, and cot  = 3. The most likely alternative is the alternative II with a volume that is not too large compared to the alternative III, which is 245.05 m3 per 1 meter in length and has a slope that can absorbs wave energy more effective than the alternative I.].

View Full Text

Details

  • File Type
    pdf
  • Upload Time
    -
  • Content Languages
    English
  • Upload User
    Anonymous/Not logged-in
  • File Pages
    2 Page
  • File Size
    -

Download

Channel Download Status
Express Download Enable

Copyright

We respect the copyrights and intellectual property rights of all users. All uploaded documents are either original works of the uploader or authorized works of the rightful owners.

  • Not to be reproduced or distributed without explicit permission.
  • Not used for commercial purposes outside of approved use cases.
  • Not used to infringe on the rights of the original creators.
  • If you believe any content infringes your copyright, please contact us immediately.

Support

For help with questions, suggestions, or problems, please contact us