Reference material AMS Project Specifications: AMS Trackside Design Guideline This document is published as reference material to support the implementation of Automatic Train Protection as part of the roll out of the Advanced Train Control Migration System project. The content described might be of assistance to individuals and organisations performing work on NSW Rail Assets. When reading this document, any inconsistencies with Transport for NSW Network Standards shall be raised with the Asset Standards Authority (ASA) for clarification. This document does not comply with accessibility requirements (WCAG 2.0). If you are having trouble accessing information in these documents, please contact the ASA. Authorised by: Chief Engineer, Asset Standards Authority Published: November 2018 Important message This document is developed solely and specifically for use on the rail network owned or managed by the NSW Government and its agencies. It is not suitable for any other purpose. You must not use or adapt it or rely upon it in any way unless you are authorised in writing to do so by a relevant NSW Government agency. If this document forms part of a contract with, or is a condition of approval by, a NSW Government agency, use of the document is subject to the terms of the contract or approval. This document is published for information only and its content may not be current. AMS PROJECT SPECIFICATIONS: AMS TRACKSIDE DESIGN GUIDELINE DeskSite Reference: 5188811 only Principle – Applicable to Transport Projects AMS Program Quality Management System Status: Draft Version: V3.0 Branch: Infrastructure and Services Business unit: ATP Program Date of issue: material 08/03/2018 Review date: 08/03/2018 Audience: AMS Project Specific Document Heavy Rail; Light Rail; Multi Sites; Asset classes: Systems; Fleets Project type: Major Feasibility; Scoping; Definition; Project lifecycle: Construction readiness; Implementation; Finalisation; Not applicable Reference Process owner: Project Director AMS PROJECT SPECIFICATIONS: AMS TRACKSIDE DESIGN GUIDELINE Transport Infrastructure and Services : ATP Program NSW for NSW Project type: Major Document Approval: Authored by: Colin Oxborrow Signal Design Engineer .,,Z(•11-•-------R-- Date: 9 Reviewed by: Digitally signed by Adam J Bird Date: 2018.03.13 07:47:38 Adam Bird AMS Design Engineer Trackside Date: _ , / only Reviewed by: • f Anthony Samaan I;13 • 2 CIF _ '------- -- Manager Safety Assurance , Date: Reviewed by: q Andre Younes VA: (311 73- ) tg Manager Operational Integration Date: Reviewed and Accepted by: C e• Frederic Tricoche Oka-ILI 1 -I 1 Principal Engineering Manager Systems Date: Approved for Release by: material Geoff Webb 14/03/18 ATP Project Director Date: Reference QUALITY MANAGEMENT SYSTEM Desksite Reference: 5188811_14 TfNSW 2017 UNCONTROLLED WHEN PRINTED Page 2 of 29 AMS PROJECT SPECIFICATIONS: AMS TRACKSIDE DESIGN GUIDELINE Infrastructure and Services : ATP Program Project type: Major Document History Version Date of Issue Author Summary of change 0.1 13/05/2016 L. Williams Initial draft 0.2 18/07/2016 L. Williams Update to stakeholder comments Development of ETCS tables, draft released for 0.3 20/07/2016 L. Williams GSFT/SIT tender. 0.4 06/09/2016 L. Williams Update to review comments only 0.5 21/09/2016 L. Williams Update to final review comments 1.0 22/09/2016 L. Williams Issued Update to include latest ETCS Balise and LEU 1.1 08/02/2017 J. Paw Table Template (CR-406) Update to CR376 (CI436), CR406 (CI432), CR481 1.2 20/03/2017 S. S. De (CI578) , CR482 (CI537), CR554 and CR571 (CI599) 1.3 12/05/2017 S. S. De Updated CR574, CR626, CR628 and CR652 2.0 12/05/2017 S. S. De Issued for Approval material Update to latest ETCS Balise and LEU Table 2.1 08/03/2018 C. Oxborrow Template 3.0 08/03/2018 C. Oxborrow Issued for Approval Reference QUALITY MANAGEMENT SYSTEM Desksite Reference: 5188811_14 © TfNSW 2017 UNCONTROLLED WHEN PRINTED Page 3 of 29 AMS PROJECT SPECIFICATIONS: AMS TRACKSIDE DESIGN GUIDELINE Infrastructure and Services : ATP Program Project type: Major Foreword This guideline forms a part of the AMS Project Specifications which detail the requirements for the implementation of ATP / AMS on the TfNSW heavy rail network. This guideline specifically covers the ETCS Level 1 System using Limited Supervision. To gain a complete overview of ATP / AMS signalling design requirements, this document should be read in conjunction with the AMS suite of signalling design principle and guideline modules. only Note The following guideline is to be used by AEO’s engaged by the ATP program for the ATP / AMS detailed design implementation. This is to ensure that a consistent methodology is applied. It has been produced during the development of the AMS Project Specifications and subsequent further updates may be required as the specifications evolve. It is an interim document until the ASA guideline is published. material Reference QUALITY MANAGEMENT SYSTEM Desksite Reference: 5188811_14 © TfNSW 2017 UNCONTROLLED WHEN PRINTED Page 4 of 29 AMS PROJECT SPECIFICATIONS: AMS TRACKSIDE DESIGN GUIDELINE Infrastructure and Services : ATP Program Project type: Major Table of contents 1. Introduction _______________________________________________________________ 7 2. Purpose __________________________________________________________________ 8 3. Terms and definitions ______________________________________________________ 9 4. Reference documents_____________________________________________________ 11 5. Design Process __________________________________________________________ 12 only 5.1. Overview ___________________________________________________________________ 12 6. System Requirements ____________________________________________________ 13 6.1. AMS System Requirements Specification _____________________________________ 13 6.2. AMS Trackside Sub-System Requirements ____________________________________ 13 7. System Definition_________________________________________________________ 14 7.1. AMS Signal Design Principles ________________________________________________ 14 7.2. AMS Standards and Guidelines _______________________________________________ 14 7.3. Trackside System Architecture Definition _____________________________________ 14 7.3.1. Signalling Interface Description ______________________________________________________ 15 material 7.3.2. Project Technical Description _______________________________________________________ 16 7.3.3. Power Supply Arrangement Description ______________________________________________ 16 7.3.4. Network Architecture Description ____________________________________________________ 16 7.4. Encoder Standard Configuration Definition ____________________________________ 16 7.5. ASA Standards ______________________________________________________________ 16 8. Concept Design __________________________________________________________ 17 8.1. Signalling Functional Specification (SFS) _____________________________________ 17 8.1.1. Design Inputs _____________________________________________________________________ 18 8.1.2. Design Outputs ____________________________________________________________________ 19 9. Detailed Design __________________________________________________________ 20 9.1. Signalling Plan Design for AMS _______________________________________________ 20 9.1.1. ATP Symbols _____________________________________________________________________ 20 9.1.2. Balise and Balise Group Naming ____________________________________________________ 21 9.1.3. Design Inputs _____________________________________________________________________ 22 Reference 9.1.4. Design Outputs ____________________________________________________________________ 22 9.2. ETCS Balise and LEU Tables _________________________________________________ 22 9.2.1. ETCS Balise and LEU Tables Cover and Control Sheets _______________________________ 23 QUALITY MANAGEMENT SYSTEM Desksite Reference: 5188811_14 © TfNSW 2017 UNCONTROLLED WHEN PRINTED Page 5 of 29 AMS PROJECT SPECIFICATIONS: AMS TRACKSIDE DESIGN GUIDELINE Infrastructure and Services : ATP Program Project type: Major 9.2.2. ETCS Balise Table Design__________________________________________________________ 23 9.2.3. LEU Table Design _________________________________________________________________ 23 9.2.4. Design Inputs _____________________________________________________________________ 24 9.2.5. Design Outputs ____________________________________________________________________ 24 9.3. Track Insulation Plans _______________________________________________________ 24 9.4. Circuit Book – LEU Interface Design __________________________________________ 24 9.4.1. Design Inputs _____________________________________________________________________ 25 9.4.2. Design Outputs ____________________________________________________________________ 25 only 9.5. SSI/CBI Data ________________________________________________________________ 25 9.6. Data Production _____________________________________________________________ 26 9.6.1. Overview _________________________________________________________________________ 26 9.6.2. Data Validation ____________________________________________________________________ 27 Appendix A AMS Roadmap __________________________________________________ 29 material Reference QUALITY MANAGEMENT SYSTEM Desksite Reference: 5188811_14 © TfNSW 2017 UNCONTROLLED WHEN PRINTED Page 6 of 29 AMS PROJECT SPECIFICATIONS: AMS TRACKSIDE DESIGN GUIDELINE Infrastructure and Services : ATP Program Project type: Major 1. Introduction
Details
-
File Typepdf
-
Upload Time-
-
Content LanguagesEnglish
-
Upload UserAnonymous/Not logged-in
-
File Pages30 Page
-
File Size-