
PROCUREMENT STATS FOR DEPARTMENT OF TRANSPORT AND PUBLIC WORKS ( ALL BIDS ABOVE R100 000.00) 1 - 31 MARCH 2019 CONTRACT DESCRIPTION OF CONTRACT SUCCESSFUL BIDDER DATE AWARDED NUMBER CONTRACT (SHORT) VALUE Schoemanspoort Culture Centre Repairs and Praxos 237 cc S001/16 P007 Renovations 28-Mar-19 R 5 935 150.10 Blackburn Solutions GMT000616/DOC166812693 Branding 18-Mar-19 R 173 454.49 Diway Consulting GMT000617/DOC166816238 Branding 18-Mar-19 R 146 331.75 9 Dorp Stree, Security basement, fix falling Zaf Construction S031/16-P097-288 fitment 15-Mar-19 R 1 778.92 7 Wale street, 5th floor, storeroom, replace Zaf Construction S031/16-P097-195 faulty light bulbs or tubes 15-Mar-19 R 1 578.78 Zaf Construction S031/16-P097-113 Atterbury House, 17th floor, install plug point 04-Mar-19 R 1 355.79 Golden Acre, 11th floor, install plug socket & Zaf Construction S031/16-P097-118 2 x light switch covers 04-Mar-19 R 1 164.40 15 Wale Street, 5th floor, replace faulty light Zaf Construction S031/16-P097-123 bulbes 03-Mar-19 R 1 744.56 15 Wale Street, 1st floor, replace faulty light Zaf Construction S031/16-P097-22 bulbs or tubes 04-Mar-19 R 977.50 15 Wale Street, 6th floor, walk in freezer, Zaf Construction S031/16-P097-121 replace faulty light bulbs or tubes 04-Mar-19 R 1 252.41 15 Wale Street, 56th floor, members loung: Zaf Construction S031/16-P097-120 replace faulty light bulbs or tubes 04-Mar-19 R 5 286.04 9 Dorp Street, 9th floor, ladies toilet, replace Zaf Construction S031/16-P097-126 faulty light bulbs or tubes 04-Mar-19 R 1 286.71 9 Dorp Street, Install power point to link Zaf Construction S031/16-P097-124 buzzer 04-Mar-19 R 2 310.72 Leeuwenhof, manor kitchen, repair and Zaf Construction S031/16-P097-131 replace faulty light switch 04-Mar-19 R 1 883.07 Leeuwenhof, Kitchen manor, replace faulty Zaf Construction S031/16-P097-127 light bulbs or tubes 04-Mar-19 R 1 934.17 Waldorf Building, 12th floor, replace faulty Zaf Construction S031/16-P097-138 light bulbs or tubes 04-Mar-19 R 2 540.66 Waldorf Building, 6th floor, replace faulty Zaf Construction S031/16-P097-137 light bulbs or tubes 04-Mar-19 R 2 675.93 Leeuwenhof, Manor en-suite bathroom, Zaf Construction S031/16-P097-249 repair and or replace faulty light switch 15-Mar-19 R 1 080.64 15 Wale Street, 6th floor, replace faulty light Zaf Construction S031/16-P097-498 bulbs or tubes 15-Mar-19 R 7 575.55 7 Wale Street, 7th floor, replace faulty light Zaf Construction S031/16-P097-453 bulbs or tubes 15-Mar-19 R 2 958.23 7 Wale Street, 6th floor, replace light in Zaf Construction S031/16-P097-497 kitchen 15-Mar-19 R 1 131.73 7 & 15 Wale Street, 6th and 7th floor, replace Zaf Construction S031/16-P097-500 faulty light bulbs or tubes 15-Mar-19 R 4 141.90 7 & 15 Wale Street, 6th and 7th floor, replace Zaf Construction S031/16-P097-499 faulty light bulbs or tubes 15-Mar-19 R 1 748.69 7 Wale Street, 56th floor, fix and tightly secure Zaf Construction S031/16-P097-419 or replace fallen fitting 15-Mar-19 R 2 920.49 7 & 15 Wale Street, Ground floor, replace Zaf Construction S031/16-P097-496 faulty light bulbs or tubes 15-Mar-19 R 26 343.39 Grand Central, 2nd floor, cashiers office, Zaf Construction S031/16-P097-269 replace faulty light bulbs or tubes 15-Mar-19 R 2 785.37 Grand Central, 2nd floor, replae faulty light Zaf Construction S031/16-P097-398 bulbs or tubes 15-Mar-19 R 4 554.43 Grand Central, 10th floor, room 6, replace Zaf Construction S031/16-P097-364 light bulbs or tubes 15-Mar-19 R 1 390.22 Grand Central: 4th, 7th and 10th floor, repair Zaf Construction S031/16-P097-353 loose light switches 15-Mar-19 R 977.50 Kuilsriver, CTLI substations, servicing and Zaf Construction S031/16-P097-003 repair to transformers and HT switch gear 11-Mar-19 R 1 667 584.32 Union House3, 3rd floor, replace faulty light Zaf Construction S031/16-P097-302 bulbs or tubes 15-Mar-19 R 1 390.22 27 Wale street, C-floor, old store room, Zaf Construction S031/16-P097-447 replace faulty light bulbs or tubes 15-Mar-19 R 1 114.95 27 Wale Street, 7th floor, room 7-10:replace Zaf Construction S031/16-P097-446 faulty light bulbs or tubes q 15-Mar-19 R 977.50 Zaf Construction S031/16-P035-004 Leaking reservoir Tygerhoek 18-Feb-19 R 126 349.43 27 Wale Street, 8th floor, room 8-02, replace Zaf Construction S031/16-P097-418 faulty light bulbs or tubes 15-Mar-19 R 1 902.92 27 Wale Street, Ground floor, repair and or Zaf Construction S031/16-P097-17 replace faulty light switch 15-Mar-19 R 1 080.64 27 Wale street, 89th floor, restore power to Zaf Construction S031/16-P097-156 affected areas 15-Mar-19 R 1 080.64 27 Wale street, Room 10-02 andf 10-19: Zaf Construction S031/16-P097-309 replace faulty light bulbs or tubes 15-Mar-19 R 1 285.97 9 Dorp Street, 4th floor, light out in blue bubble boardroom and in Chief Director Zaf Construction S031/16-P097-425 office 15-Mar-19 R 1 883.33 35 Wale Street, 2nd floor, room 2.47, replace Zaf Construction S031/16-P097-146 faulty light bulbs or tubes 04-Mar-19 R 3 453.84 11 Leeuwen Street, 1st floor, replace faulty Zaf Construction S031/16-P097-150 light bulbs 04-Mar-19 R 2 352.09 11 Leeuwen Street, 2nd floor, fault find, fix Zaf Construction S031/16-P097-149 and restore power to affected areas 04-Mar-19 R 977.50 Zaf Construction S031/16-P097-153 4 Dorp Street, 1st floor, lights tripped 04-Mar-19 R 2 336.63 Zaf Construction S031/16-P097-151 4 Dorp Street, 7th floor, electrical inspection 04-Mar-19 R 977.50 34 Roeland Street, Opp room A9: Replace Zaf Construction S031/16-P097-107 faulty light bulbs or tubes 04-Mar-19 R 1 441.64 Paarden Eiland, GMT Parking lot, replace Zaf Construction S031/16-P097-108 faulty light bulbs 04-Mar-19 R 1 895.34 Library services, fault find, fix and restore Zaf Construction S031/16-P097-112 power to affected areas 04-Mar-19 R 977.50 31 Chiappini street, prefab building, Zaf Construction S031/16-P097-139 investigate tripping CB&resolve 04-Mar-19 R 1 618.71 35 Wale Street, 2nd floor, mens toilet fused Zaf Construction S031/16-P097-141 lights 04-Mar-19 R 1 527.33 Protea Assurance, 4th floor, retrofit faulty Zaf Construction S031/16-P097-142 down light with GU10 downlights 04-Mar-19 R 2 780.65 Protea Assurance, 7th floor, boardroom, fault Zaf Construction S031/16-P097-143 find and fix and restore power 04-Mar-19 R 977.50 Vangate basement area, repalce faulty light Zaf Construction S031/16-P097-144 bulbs or tubes 04-Mar-19 R 7 230.78 35 Wale street, 5thfloor, install additional plug Zaf Construction S031/16-P097-145 sockets 04-Mar-19 R 1 279.69 Waldorf Bulding,6th floor, replace faulty light Zaf Construction S031/16-P097-136 bulbs or tubes 04-Mar-19 R 1 090.72 Waldorf Building, ground floor, fault find, fix Zaf Construction S031/16-P097-133 and restore power 04-Mar-19 R 1 080.64 Waldorf Building, 7th floor, install a plug Zaf Construction S031/16-P097-132 socket in accordance with SANS 10142-1 04-Mar-19 R 1 810.70 7 Wale Street, 6th floor, repair and or replace Maritz Electrical S031/16-P117-103 faulty light switch 04-Mar-19 R 977.50 7 Wale Street, 6th floor, replace faulty light Maritz Electrical S031/16-P117-098 tubes and down lights 04-Mar-19 R 977.50 7 Wale Street, 3rd floor, Assess and fix Maritz Electrical S031/16-P117-095 electrical wiring 04-Mar-19 R 977.50 7 Wale Street, 6th floor, replace faulty light Maritz Electrical S031/16-P117-093 bulbs 04-Mar-19 R 1 475.65 7 Wale Street, Cabinet chambers, repair Maritz Electrical S031/16-P117-092 flickering light switch 04-Mar-19 R 2 724.41 Maritz Electrical S031/16-P117-090 Cravenby Estate, 7th Avenue, electrical fault 04-Mar-19 R 2 363.26 Sizisa Ukhanyo Trading De Novo, HT Cable hanginds low close to 77cc S031/16-P080-001 house 13-Mar-19 R 17 779.57 Sizisa Ukhanyo Trading 77cc S031/16-P080-002 Elsenburg FET building, Power outage 14-Mar-19 R 10 822.08 Boulo Electrical S031/16-P083-032 Worcester Museum, Electrical switchboards 13-Mar-19 R 1 207.50 Worcester field reserve, House no A1, repair Boulo Electrical S031/16-P083-033 loose fitting 13-Mar-19 R 2 935.81 Boulo Electrical S031/16-P083-031 Tweede Tol, generator repairs 13-Mar-19 R 5 222.75 Vrolijkheid Nature Reserve, Repairs to DB that Boulo Electrical S031/16-P083-029 supply the fire booster system 19-Nov-18 R 43 537.00 Boulo Electrical S031/16-P083-028 Kromme Rhee A7, Electrical isue repairs 13-Mar-19 R 28 187.44 Kogelberg Nature Reserve - repair to DB box Enwyr Simons Electrical S031/16-P070-04 that burnt 13-Mar-19 R 55 303.29 Overberg District office, NO plugs working Enwyr Simons Electrical S031/16-P070-001 and repair faulty light 13-Mar-19 R 9 690.81 Enwyr Simons Electrical S031/16-P070-002 Andrew White Street, repair outside lights 13-Mar-19 R 6 262.61 Caledon:Overberg District office: Main board tripping lights in building.
Details
-
File Typepdf
-
Upload Time-
-
Content LanguagesEnglish
-
Upload UserAnonymous/Not logged-in
-
File Pages30 Page
-
File Size-