Calspace-UCSC Center of Excellence

Calspace-UCSC Center of Excellence

Mercury Flights 1960: MA-1 3 min partial success 1961: MA-2 18 min successful MA-3 7 min aborted MA-4 1 h 49 min successful MR-3 15 min Shepard Jr MR-4 16 min Grisson 1962 MA-6 4 h 55 min Glenn 3 orbits MA-7 4 h 56 min Carpenter 3 orbits MA-8 9 h 13 min Schirra 6 orbits MA-9 34 h 20 min Cooper 22 orbits Mercury 13: Woman astronauts First USSR & US Woman in space Preparation 1:Project Ranger Ranger 3: miss the moon Hit the moon, But no pictures Rangers 8 and 9 Ranger flights Ranger 1 Aug 23, 1961 Agena fails to reignite Ranger 2 Nov 18, 1961 Agena fails to reignite Ranger 3 Jan 26, 1962 Agena fires too long Ranger 4 Apr 23, 1962 Timer fails on probe Ranger 5 Oct 8, 1962 probe’s solar panel fails Ranger 6 Jan 30, 1964 First Moon impact, no pictures Ranger 7 Jul 28, 1964 Impacts Moon, pictures Ranger 8 Feb 17, 1965 Impacts Moon, pictures Ranger 9 Mar 21, 1965 Impacts Moon, pictures Preparation 2: Project Orbiter Lunar surface features Lunar Orbiter Flights Lunar orbiter 1 Aug 10, 1966 First US probe to orbit the Moon Lunar orbiter 2 Nov 6, 1966 Examine 13 Apollo sites Lunar orbiter 3 Feb 4, 1967 Completes Apollo site search Lunar orbiter 4 May 4, 1967 Image Moon’s south pole Lunar orbiter 5 Aug 1, 1967 Complete mapping of the Moon Preparation 3: Project Surveyor Surveyor flights Surveyor 1 May 30, 1966 First US soft lunar landing Surveyor 2 Sep 20, 1966 crashed Surveyor 3 Apr 17, 1967 bearing test Surveyor 4 Jul 14, 1967 crashed Surveyor 5 Sep 8, 1967 chemical soil test Surveyor 6 Nov 7, 1967 First US lift off from Moon Surveyor 7 Jan 7, 1968 highland landing Luna program Project Gemini Astronaut training Rendezvous and docking Space walk (extra vehicular activity) Gemini flights Gemini 1 4/08/64 unmanned compatibility test Gemini 2 1/19/65 unmanned reentry test Gemini 3 3/23/65 test flight Gemini 4 6/03/65 first EVA Gemini 5 8/21/65 long duration flight Gemini 6 12/15/65 rendezvous with Gemini 7 Gemini 7 12/04/65 long duration flight Gemini 8 3/16/66 docking, terminated Gemini 9 6/03/66 rendezvous EVA Gemini 10 7/18/66 docking two EVAs Gemini 11 9/12/66 docking, EVA Gemini 12 11/11/66 docking three EVAs Apollo space mission objectives Mission chart Apollo command module Apollo lunar module Apollo space craft Saturn V rocket Turning points Apollo 11:Historic moment Landing sites Lunar surface experiments ALSEP.

View Full Text

Details

  • File Type
    pdf
  • Upload Time
    -
  • Content Languages
    English
  • Upload User
    Anonymous/Not logged-in
  • File Pages
    27 Page
  • File Size
    -

Download

Channel Download Status
Express Download Enable

Copyright

We respect the copyrights and intellectual property rights of all users. All uploaded documents are either original works of the uploader or authorized works of the rightful owners.

  • Not to be reproduced or distributed without explicit permission.
  • Not used for commercial purposes outside of approved use cases.
  • Not used to infringe on the rights of the original creators.
  • If you believe any content infringes your copyright, please contact us immediately.

Support

For help with questions, suggestions, or problems, please contact us