April 2006 Bay Leaf.Indd

April 2006 Bay Leaf.Indd

April 2006 The Bay Leaf California Native Plant Society • East Bay Chapter • Alameda & Contra Costa Counties www.ebcnps.org CALENDAR OF EVENTS Field Trips p. 5 Saturdays, April 1, 8, 15, 22, 29, 10 am-1 pm Sunday, April 2, 10 am, Antioch Dunes National See collection forays, Tuesdays, April 4, 11, 18, 25, Wildlife Refuge approximately 9:00 am to 1 pm Saturday, April 8, Falls Trail, Mount Diablo Sunday, April 9, 2 pm, Butano State Park, San Mateo Native Plant Restoration Team p. 2 County Saturday, April 8, 9:30 am Saturday, April 15, Snell Valley, Napa County Sunday, April 16, 2006, East Trail, Mount Diablo Membership meeting see below Sunday, April 23, 2:30 pm, Sunol Regional Park Wednesday, April 26, 2006, 7:30 pm, Orinda Public Library Auditorium Board of Directors meeting Wednesday, April 5, 7:30 pm, home of Barbara Leitner, Membership p. 4 2 Parkway Court, Orinda Helpers needed for mini plant sales on Sunday, May 7 at the Bring Back the Natives Garden Tour Native Here p. 8 Nursery open, Fridays, April 7, 14, 21, 28, 9-noon and MEMBERSHIP MEETING The Diablo Grand Loop: The Hunt for Brewer, Buck- tion with development threats. In 1936, Bowerman wheat and Bowerman was the last person to see the Mt. Diablo buckwheat Speaker: Seth Adams alive. Wednesday, April 26, 2006, 7:30 pm Until the mid 1960s, Contra Costa County had just Orinda Public Library Auditorium (directions below) one significant park, 6000-acre Mt. Diablo State Park. Mary Bowerman co-founded Save Mount Diablo in On May 29, 1862, William Brewer of the Whitney 1971 and for 34 years that organization has worked Geological Survey was the first person to document with agencies, individuals, and even developers to ex- the Mt. Diablo buckwheat (Eriogonum truncatum) in pand Mt. Diablo State Park and help create nineteen the mountain’s eastern foothills on John Marsh’s more Diablo parks. Their combined area now totals rancho. Brewer and Whitney believed Mt. Diablo was 88,000 acres. Seven of the parks were created or the key to understanding California’s geology and they opened in the past ten years, including Round Valley, witnessed the beginnings of both tourism and mining Brushy Peak, and Vasco Caves Regional Preserves; the booms there. Soon afterwards, a surge of development Los Vaqueros watershed; and Cowell Ranch State Park, speculation would threaten and ultimately save vast the remnant of Marsh’s rancho where the buckwheat tracts of land on and around the mountain. was discovered. Seventy years later, UC botany student Mary Bower- In 1994, Save Mount Diablo created the 30-mile Diablo man began studies that would convince her, too, of Trail across six parks. Next year, the organization will the mountain’s importance. Her research would lay publish a map of an extended route—a 60-mile “Diablo the groundwork for Diablo’s preservation, but as in Grand Loop”—that can be established across three Brewer’s time, the effort would take place in competi- more preserves if two small gaps can be acquired. continued on page 2 continued from page 1 Join Seth Adams, Save Mount Diablo’s Director of place in the Auditorium of the Orinda Public Library Land Programs, as he shows images and threads his at 24 Orinda Way (in Orinda Village). The Auditorium way through the mountain’s natural and cultural his- is on the second floor of the building, accessible by tory, the characters who have stairs or an elevator. The Au- been drawn to Diablo, and the ditorium will open at 7:00 pm. spectacular new areas that have The meeting begins at 7:30 pm. been protected in recent years. Refreshments will be served The story ends with the rediscov- after the presentation. Please ery of Brewer’s and Bowerman’s contact Sue Rosenthal, 510- buckwheat seventy years after 496-6016 or rosacalifornica@ it was thought extinct, on land earthlink.net, if you have any Save Mount Diablo preserved, questions. and two months before Bower- man passed away. Directions to Orinda Public Li- brary at 24 Orinda Way: Seth Adams was Save Mount From the west, take Highway 24 Diablo’s first professional staff to the Orinda/Moraga exit. At member. His responsibilities the end of the off-ramp, turn left include land acquisition, land on Camino Pablo (toward Orinda use planning, land stewardship, Village), right on Santa Maria grassroots activism, and legisla- Way (the signal after the BART tion and public policy. Among his station and freeway entrance), Seth Adams Photo by Lynn Johnson proudest accomplishments are and left on Orinda Way. the preservation of thousands of acres of threatened habitat throughout the East Bay through acquisition From the east, take Highway 24 to the Orinda exit. and grassroots advocacy, creation of new recreational Follow the ramp to Orinda Village. Turn right on Santa trails such as the 30-mile Diablo Trail, reintroduction Maria Way (the first signal) and left on Orinda Way. of endangered peregrine falcons to Mt. Diablo, and Once on Orinda Way, go 1 short block to the parking media work publicizing the Mt. Diablo buckwheat lot on the southeast side of the new 2-story building rediscovery. on your right. There is additional free parking beneath the building as well as on the street. Seth has received a number of significant awards for his work, including the Year 2000 John Muir Conserva- From BART (4 blocks): Exit the Orinda station, turn tion Award from the John Muir Memorial Association, right and cross a pedestrian bridge, then cross a sec- the Stars of the Greenbelt award from the Greenbelt ond pedestrian bridge on the left. Go 1 short block on Alliance, a 2001 Conservation Medal from the National the sidewalk to the third pedestrian bridge. Go 2 blocks Society of the Daughters of the American Revolution, on Orinda Way to the Orinda Library. and the 2001 Mountain Saver Award for lifetime achievement from Save Mount Diablo. Next month’s speaker: East Bay CNPS membership meetings are free of charge Kathy Ann Miller, specialist in seaweeds of California and open to everyone. This month’s meeting will take and adjacent coastlines natIVE PLANT restoratION TEAM Making a Difference lend a hand and learn more about how people come together to create an effective conservation effort in On a wet Saturday morning in early February, students their community. from Fremont’s Irvington High School gathered at the Skyline Staging Area of Redwood Park for a briefing on Fully briefed and rarin’ to go, we picked up our weed the basic characteristics of their enemy target: French wrenches and started out on a muddy trek, slip-slid- broom. Although the topic of the moment was weeds, ing our way along the East Bay Skyline Ridge Trail, the larger lesson they were learning was about the following Wendy Tokuda, the woman who first spear- power to create positive change. Joining the students headed the broom removal program. We were literally for the day was a contingent of East Bay Chapter weed following in Wendy’s footsteps, retracing a path that warriors led by Greg Wolford. We had come along to she has walked and worked every first Saturday of the 2 THE BAY LEAF April 2006 month for two years. When Wendy first discovered this number of ways of counting the impact. Here then are trail, it was choked with such a dense monoculture of some of my memories of the day from moments when I broom that the canopy closed over the trail. On one sat back on my heels and watched people fully engaged of those early walks, she made a personal decision to in making a difference: the look of grim satisfaction on begin the enormous task of reducing the broom and the mud-flecked face of the girl next to me on her hands restoring the trail. Initially, she worked alone. Then and knees ripping up handfuls of broom; laughter riot- one day someone out on a walk stopped to help her ing from a group of boys as one of them wrenched a weed. He came back again the next month. More people huge broom plant out of the bank tumbling head over joined, and Wendy asked the Park District for field heels onto the trail with the plant still clutched in his support. They supplied weed wrenches and snacks for arms; the occasional calls of joyful discovery amid the volunteers. They also listed Wendy’s project in their pillage from up and down the trail, Snakeroot! Wood volunteer programs published on-line. strawberry! Soap plant! The Irvington High School freshmen saw Wendy’s list- If you would like to be part of the change happening ing when they were choosing their Change Projects, a with Wendy’s broom removal project, bring gloves and required student activity in which “freshmen make a meet at the Skyline Staging Area of Redwood Park at personal investment in their community by identify- 9:30 am on the first Saturday of each month. ing an area of environmental concern and designing a way to make a positive change.” This was the second Directions: Take Highway 13 to the Park Boulevard Saturday that they had worked, and the trail was lined exit. Go east to the first intersection, Mountain Bou- with pile after pile of broom that they had pulled on levard. Left onto Mountain, a short distance to Snake their first work day. Road, right on Snake (uphill) straight through onto Shepard’s Canyon. Take Shepard’s Canyon all the way How do we measure this change? The Park District and to Skyline Boulevard.

View Full Text

Details

  • File Type
    pdf
  • Upload Time
    -
  • Content Languages
    English
  • Upload User
    Anonymous/Not logged-in
  • File Pages
    8 Page
  • File Size
    -

Download

Channel Download Status
Express Download Enable

Copyright

We respect the copyrights and intellectual property rights of all users. All uploaded documents are either original works of the uploader or authorized works of the rightful owners.

  • Not to be reproduced or distributed without explicit permission.
  • Not used for commercial purposes outside of approved use cases.
  • Not used to infringe on the rights of the original creators.
  • If you believe any content infringes your copyright, please contact us immediately.

Support

For help with questions, suggestions, or problems, please contact us