Iso/Iec Jtc 1/Sc 34 N 1611 Date: 2011-04-04

Iso/Iec Jtc 1/Sc 34 N 1611 Date: 2011-04-04

ISO/IEC JTC 1/SC 34 N 1611 DATE: 2011-04-04 ISO/IEC JTC 1/SC 34 Document Description and Processing Languages Secretariat: Japan (JISC) DOC. TYPE Resolutions Resolutions of the ISO/IEC JTC 1/SC 34 Plenary Meeting, Prague, TITLE Czech Republic, 2011-04-01 SOURCE SC 34 Secretariat PROJECT Resolutions adopted at the ISO/IEC JTC 1/SC 34 Plenary Meeting, STATUS Prague, Czech Republic, 2011-04-01 ACTION ID FYI DUE DATE P, O and L Members of ISO/IEC JTC 1/SC 34 ; ISO/IEC JTC 1 DISTRIBUTION Secretariat; ISO/IEC ITTF ACCESS LEVEL Open ISSUE NO. 202 NAME 1611.pdf SIZE FILE (KB) 10 PAGES Secretariat ISO/IEC JTC 1/SC 34 - IPSJ/ITSCJ (Information Processing Society of Japan/Information Technology Standards Commission of Japan)* Room 308-3, Kikai-Shinko-Kaikan Bldg., 3-5-8, Shiba-Koen, Minato-ku, Tokyo 105-0011 Japan *Standard Organization Accredited by JISC Telephone: +81-3-3431-2808; Facsimile: +81-3-3431-6493; E-mail: [email protected] Resolutions of the ISO/IEC JTC 1/SC 34 Plenary Meeting, Prague, Czech Republic, 2011-04-01 National bodies and Liaison organizations present at this plenary: Brazil, China, Czech Republic, France, Germany, Japan, Korea (Republic of), the Netherlands, Norway, United Kingdom, USA, Ecma International, OASIS, W3C and XML Guild Resolution 1: Re-establishment of Ad Hoc Group 4 on EPUB In accordance with JTC 1 Belfast Resolution 58, SC 34 re-establishes an ad hoc group on EPUB of IDPF* with the following terms of reference: - to discuss with IDPF whether their EPUB work should be standardized and to present a plan for such standardization and any other recommendations to the next SC 34 Plenary in 2011 September. - to determine the major stakeholders concerned with EPUB standardization and establish additional liaisons that would enable these stakeholders to be represented. - to discuss how EPUB might be standardized with major stakeholders. Membership is open to ISO/IEC JTC 1/SC 34 P and O members, liaison organizations, and subgroup representatives. SC 34 re-appoints Dr. Makoto MURATA (Japan) and Dr. Yong-Sang CHO (Korea) as the Co-Conveners of this ad hoc group. *=International Digital Publishing Forum (http://www.idpf.org/) Unanimous Resolution 2: Establishment of Appropriate Category of Liaison with IDPF SC 34 recognizes the need for establishing a liaison relationship with IDPF and instructs AHG 4 to prepare a statement of expected benefits and responsibilities according to the requirements in the JTC 1 Supplement. SC 34 instructs its Secretariat to circulate the draft statement to be submitted by AHG 4 to SC 34 members for a default ballot for a 60 days period. Unanimous Resolution 3: Establishment of Liaison with JTC 1/SC 36 In response to the proposal from JTC 1/SC 36 contained in SC 34 N 1593, SC 34 establishes a Liaison relationship with JTC 1/SC 36. Unanimous WG 1: Resolution 4: New Work Item Proposal for "Document Container File -- Part 1: Core" SC 34 thanks WG 1 for preparing a report on Study Period for "zip" format contained in SC 34 N 1577. SC 34 instructs its Secretariat to circulate New Work Item Proposal contained in SC 34 N 1575 to the SC 34 members for a three-month ballot and to submit it JTC 1 for concurrent review. Abstain: France Resolution 5: Cancellation of Project for ISO/IEC 19757-2/Amd.1, Document Schema Definition Languages (DSDL) -- Part 2: Regular-grammar-based validation -- RELAX NG -- Amendment 1 SC 34 resolves to cancel project for 19757-2 since it is now planned to create a new part of 19757 that will mirror the work that had been planned for this amendment. Unanimous Resolution 6: Liaison Statement from SC 34/WG 1 to SC 29/WG 11 on Zip Study Period SC 34 approves the liaison statement contained in SC 34 N 1604 and instructs its Secretariat to forward it to SC 29. Unanimous WG 2 Resolution 7: Progression of Project for ISO/IEC TR 24754-2, Minimum requirements for specifying document rendering systems -- Part 2: Formatting Specifications for Document Rendering Systems SC 34 accepts disposition of comments on DTR 24754-2 contained in SC 34 N 1602 and instructs its Secretariat to submit revised text to ITTF for publication. Unanimous Resolution 8: Liaison statement from SC 34/WG 2 to SC 29/WG 11 about Panose value in ISO/IEC 14496-22 SC 34 approves the liaison statement contained in SC 34 N 1601 and instructs its Secretariat to forward it to SC 29/WG 11. Unanimous WG 3 Resolution 9: Progression of Project for ISO/IEC 18048, Topic Maps - Query Language (TMQL) SC 34 instructs its Secretariat to submit a revised text of FCD 18048 to ITTF for a DIS ballot when text is submitted by the Project Editors. Unanimous WG 4 Resolution 10: Cancellation of TR on Technical differences between ECMA-376:2006 and ISO/IEC 29500:2008, Office Open XML Due to the lack of submissions and nomination of project editor, SC 34 instructs its Secretariat to cancel the project "TR on Technical differences between ECMA-376:2006 and ISO/IEC 29500:2008". Unanimous Resolution 11: Cancellation of ISO/IEC 29500-2:2008/Amd.1, Office Open XML As no Amendment text was ever produced for Part 2, SC 34 instructs its Secretariat to cancel the project ISO/IEC 29500-2:2008/Amd.1. Unanimous Resolution 12: Request for a Consolidated Reprint of all 4 Parts of 29500:2011, Office Open XML SC 34 endorses the consolidated reprint edition of all 4 Parts of ISO/IEC 29500:2011 and instructs its Secretariat to submit them to ITTF for publication without further balloting. Unanimous Resolution 13: Renaming of ISO/IEC 29500-1:2008/Amd.2 and ISO/IEC 29500-4:2008/Amd.2, Office Open XML SC 34 instructs its Secretariat to rename the existing projects 29500-1:2008/Amd.2 and 29500-4:2008/Amd.2 to 29500-1:2011/Amd.1 and 29500-4:2011/Amd.1, respectively. Unanimous Resolution 14: Progression of Projects for ISO/IEC 29500-1:2011/Amd.1 and ISO/IEC 29500-4:2011/Amd.1, Office Open XML SC 34 instructs its Secretariat to begin a two-month PDAM ballot on each of the following documents: 29500-1:2011/Amd.1 and 29500-4:2011/Amd.1. Further, SC 34 delegates its authority to WG 4 to decide on the further progression of the two PDAMs. Unanimous Resolution 15: Change of Title of NP 30114 on Extension of Office Open XML File Formats SC 34 accepts the disposition of comments on NP 30114 contained in SC 34 N 1598 and approves to change the title to "Extensions of Office Open XML File Formats" from "Safe Extensions of Office Open XML File Formats". Unanimous WG 5 Resolution 16: Further Progression of Project for ISO/IEC TR 29166 SC 34 instructs its Secretariat to forward a revised text of PDTR 29166 to JTC 1 for a three-month DTR ballot when text is submitted by Project Editors. Unanimous Resolution 17: Extension of Study Period for "Reference Model for Identification and Description of Document Fragments" SC 34 notes that progress is being made by WG 5 in the Study Period, but further discussion is required to determine the requirement for and scope of future work. SC 34 approves an extension of the Study Period and requests WG 5 Convenor to submit a report on the results of the Study Period in time for consideration at the next SC 34 Plenary in Busan, Korea. Unanimous Target Dates Resolution 18: Extension of Limit dates SC 34 requests JTC 1 to approve the extension of the limit dates on the ISO database as follows: 1) ISO/IEC 19757-4: 2006/Amd.1, Document Schema Definition Languages (DSDL) -- Part 4: Namespace-based Validation Dispatching Language (NVDL) -- Amendment 1 Stage Current limit date New limit date Rationale: PDAM 2010-07-01 2012-03-01 WG 1 now wishes to track the DAM 2011-01-01 2012-09-01 XSLT 3.0 work in W3C, which FDAM 2012-01-01 2013-03-01 is likely to have a significant impact on the work in this amendment. 2) ISO/IEC 13250-5, Topic Maps -- Part 5: Reference model Stage Current limit date New limit date Rationale: FDIS 2010-12-15 2012-09-15 Illness of the main editor and change of co-editor. 3) ISO/IEC 18048, Topic Maps -- Query Language (TMQL) Stage Current limit date New limit date FDIS 2010-12-23 2012-03-15 Another DIS ballot is required before progressing to FDIS. Unanimous Resolution 19: Approval of Target Dates SC 34 approves/confirms the following target dates. WG Project No. CD/PDAM/PDTR DIS/DAM/DTR FDIS/FDAM 1 TR 19757-1 2011-12 2012-12 N/A 1 19757-4/Amd.1 2012-03 2012-09 2013-01 1 19757-3 (2ed) - 2011-06 2012-03 1 19757-5 - - 2011-04 1 19757-11 - - 2011-07 2 9541-1 (2ed) - 2011-05 2011-12 2 9541-2 (2ed) - 2011-05 2011-12 2 9541-3 (2ed) - 2011-05 2011-12 2 9541-4/Amd.1 - 2011-09 2012-03 3 TR 13250-1 2011-10 2012-10 N/A 3 13250-3 (2ed) 2011-12 2012-06 2013-03 3 13250-5 - 2011-12 2012-12 3 13250-7 2011-10 2012-10 2013-03 3 18048 - 2011-06 2012-03 3 TR 29111 2012-10 2013-03 N/A 4 29500-1 (2ed)/Amd.1 2011-04 2011-09 2012-03 4 29500-4 (2ed)/Amd.1 2011-04 2011-09 2012-03 4 30114 2011-12 2012-12 2013-03 5 TR 29166 - 2011-06 N/A 6 26300/Amd.

View Full Text

Details

  • File Type
    pdf
  • Upload Time
    -
  • Content Languages
    English
  • Upload User
    Anonymous/Not logged-in
  • File Pages
    10 Page
  • File Size
    -

Download

Channel Download Status
Express Download Enable

Copyright

We respect the copyrights and intellectual property rights of all users. All uploaded documents are either original works of the uploader or authorized works of the rightful owners.

  • Not to be reproduced or distributed without explicit permission.
  • Not used for commercial purposes outside of approved use cases.
  • Not used to infringe on the rights of the original creators.
  • If you believe any content infringes your copyright, please contact us immediately.

Support

For help with questions, suggestions, or problems, please contact us