Commuter Rail System Study

Commuter Rail System Study

COMMUTER RAIL SYST EM ST UDY FINAL REPORT • MAY 2010 MARICOPA ASSOCIATION OF GOVERNMENTS COMMUTER RAIL SYSTEM STUDY FINAL May 2010 SUBMITTED BY: 7720 NORTH 16TH STREET SUITE 100 PHOENIX, AZ 85020 TABLE OF CONTENTS ES.1.0 Commuter Rail System Study Overview _____________________________ ES-1 ES.1.1 How does this Study Relate to Previous Studies? ________________________ ES-1 ES.2.0 Description of Commuter Rail _____________________________________ ES-2 ES.2.1 Why is there a Need for a Commuter Rail System?_______________________ ES-2 ES.2.2 What Type of Rail Vehicles Would be Used?____________________________ ES-2 ES.2.3 Where Would Passenger Stations be Located?__________________________ ES-3 ES.3.0 Description of System Study Alternatives ___________________________ ES-4 ES.3.1 What Stand-Alone Alternatives Were Considered? _______________________ ES-4 ES.3.2 How Many Riders Would Each Stand-Alone Alternative Carry in 2030? _______ ES-4 ES.3.3 What is the Cost of Each Stand-Alone Alternative? _______________________ ES-7 ES.3.4 What Interlined Alternatives Were Considered? _________________________ ES-7 ES.3.5 How Many Riders Would Each Interlined Alternative Carry in 2030? _________ ES-8 ES.3.6 What is the Cost of Each Interlined Alternative? _________________________ ES-9 ES.4.0 Comparison of Sytsem Study Alternatives __________________________ ES-10 ES.4.1 What Evaluation Factors Were Used to Compare Alternatives? ____________ ES-10 ES.4.2 How Did the Stand-Alone Alternatives Rank in Comparison to Each Other? __ ES-11 ES.4.2.1 Total Daily Ridership Forecast ____________________________________ ES-12 ES.4.2.2 Travel Time Savings____________________________________________ ES-12 ES.4.2.3 Cost Effectiveness _____________________________________________ ES-13 ES.4.2.4 Implementation or Constructability _________________________________ ES-14 ES.4.3 How Did the Interlined Alternatives Rank in Comparison to Each Other? _____ ES-15 ES.4.3.1 Total Daily Ridership Forecast ____________________________________ ES-16 ES.4.3.2 Capital Cost per Mile ___________________________________________ ES-17 ES.4.3.3 O&M Cost per Rider ____________________________________________ ES-18 ES.5.0 System Study Alternatives Phasing Recommendations _______________ ES-19 ES.5.1 Which Segment of the Commuter Rail System Should be Implemented First? _ ES-19 ES.5.2 Which Segment of the Commuter Rail System Should be Implemented Second? ___ ______________________________________________________________ ES-23 ES.5.3 In What Order Should the Remaining Segments of the Commuter Rail System be Implemented?___________________________________________________ ES-24 i ES.6.0 Implementation Steps ___________________________________________ ES-25 ES.6.1 What Type of Agreement with the Railroads Would be Needed to Operate Commuter Rail Service? ___________________________________________________ ES-25 ES.6.2 Who Would Operate the Commuter Rail Service?_______________________ ES-25 ES.6.3 How Would Regional Commuter Rail Service be Governed? ______________ ES-25 ES.6.4 What Governance Structures Have Peer Cities Established for Commuter Rail Systems? ______________________________________________________ ES-28 ES.6.5 What Funding Options are Available to Implement Commuter Rail? _________ ES-28 ES.6.6 How Have Peer Cities Funded Commuter Rail Systems? _________________ ES-31 ES.6.7 What Near-Term Implementation Steps are Needed? ____________________ ES-32 ES.6.8 What Long Term Implementation Steps are Needed? ____________________ ES-34 1.0 Study Overview _______________________________________________________ 1-1 1.1 Introduction_______________________________________________________ 1-1 1.2 Background ______________________________________________________ 1-1 1.3 Purpose of the System Study_________________________________________ 1-2 1.4 Need for a Commuter Rail System_____________________________________ 1-2 1.5 Potential Benefits and Goals of Commuter Rail ___________________________ 1-4 1.6 System Study Process ______________________________________________ 1-5 1.7 Organization of the System Study _____________________________________ 1-6 2.0 Existing and Future Conditions__________________________________________ 2-1 2.1 Introduction_______________________________________________________ 2-1 2.2 Summary of Findings _______________________________________________ 2-5 2.2.1 Demographics ___________________________________________________ 2-5 2.2.2 Land Use _______________________________________________________ 2-5 2.2.3 Railroad Characteristics ___________________________________________ 2-5 2.2.4 Highway Characteristics ___________________________________________ 2-5 2.2.5 Transit Service __________________________________________________ 2-5 2.2.6 Travel Patterns __________________________________________________ 2-6 2.3 Grand Avenue Corridor _____________________________________________ 2-7 2.3.1 Demographics ___________________________________________________ 2-7 2.3.2 Land Use _______________________________________________________ 2-8 2.3.3 Railroad Characteristics __________________________________________ 2-13 2.3.4 Highway Characteristics __________________________________________ 2-17 2.3.5 Transit Service _________________________________________________ 2-23 2.3.6 Travel Patterns _________________________________________________ 2-27 ii 2.3.7 Summary ______________________________________________________ 2-27 2.4 Yuma West Corridor_______________________________________________ 2-29 2.4.1 Demographics __________________________________________________ 2-29 2.4.2 Land Use ______________________________________________________ 2-30 2.4.3 Railroad Characteristics __________________________________________ 2-35 2.4.4 Highway Characteristics __________________________________________ 2-39 2.4.5 Transit Service _________________________________________________ 2-43 2.4.6 Travel Patterns _________________________________________________ 2-47 2.4.7 Summary ______________________________________________________ 2-47 2.5 Southeast Corridor ________________________________________________ 2-49 2.5.1 Demographics __________________________________________________ 2-49 2.5.2 Land Use ______________________________________________________ 2-51 2.5.3 Railroad Characteristics __________________________________________ 2-55 2.5.4 Highway Characteristics __________________________________________ 2-59 2.5.5 Transit Service _________________________________________________ 2-63 2.5.6 Travel Patterns _________________________________________________ 2-67 2.5.7 Summary ______________________________________________________ 2-67 2.6 Tempe Corridor __________________________________________________ 2-69 2.6.1 Demographics __________________________________________________ 2-69 2.6.2 Land Use ______________________________________________________ 2-70 2.6.3 Railroad Characteristics __________________________________________ 2-75 2.6.4 Highway Characteristics __________________________________________ 2-79 2.6.5 Transit Service _________________________________________________ 2-83 2.6.6 Travel Patterns _________________________________________________ 2-87 2.6.7 Summary ______________________________________________________ 2-87 2.7 Chandler Corridor_________________________________________________ 2-89 2.7.1 Demographics __________________________________________________ 2-89 2.7.2 Land Use ______________________________________________________ 2-90 2.7.3 Railroad Characteristics __________________________________________ 2-95 2.7.4 Highway Characteristics __________________________________________ 2-99 2.7.5 Transit Service ________________________________________________ 2-103 2.7.6 Travel Patterns ________________________________________________ 2-107 2.7.7 Summary _____________________________________________________ 2-107 2.8 Future Extensions _______________________________________________ 2-109 iii 3.0 Alternatives Development and Evaluation _________________________________ 3-1 3.1 Introduction_______________________________________________________ 3-1 3.2 Development of Alternatives _________________________________________ 3-2 3.2.1 Assumptions ____________________________________________________ 3-4 3.3 Description of Alternatives ___________________________________________ 3-8 3.3.1 Round 1: Preliminary “Maximum Service” Alternatives ____________________ 3-8 3.3.2 Round 2: Stand-Alone Base Alternatives and Combined Base Alternatives____ 3-9 3.3.3 Round 3A: Interlined Alternatives ___________________________________ 3-11 3.3.4 Round 3B: Alternate Interlined Alternatives ___________________________ 3-12 3.4 Ridership Forecasting Results _______________________________________ 3-12 3.4.1 Round 1: Preliminary “Maximum Service” Alternatives Ridership Forecasting Results _______________________________________________________ 3-13 3.4.2 Round 2: Stand-Alone Base and Combined Base Alternatives Ridership Forecasting Results______________________________________________ 3-13 3.4.3 Round 3A: Interlined Alternatives Ridership Forecasting Results___________ 3-28 3.4.4 Round 3B: Alternate Interlined Alternatives Ridership Forecasting Results ___ 3-33 3.5 Cost Estimates ___________________________________________________ 3-35 3.5.1 Round 1: Preliminary “Maximum Service” Alternatives Cost Estimates ______ 3-35 3.5.2 Round 2: Stand-Alone and Combined Base Alternatives Cost Estimates ____ 3-36 3.5.3 Round 3A: Interlined Alternatives Cost Estimates_______________________ 3-36

View Full Text

Details

  • File Type
    pdf
  • Upload Time
    -
  • Content Languages
    English
  • Upload User
    Anonymous/Not logged-in
  • File Pages
    274 Page
  • File Size
    -

Download

Channel Download Status
Express Download Enable

Copyright

We respect the copyrights and intellectual property rights of all users. All uploaded documents are either original works of the uploader or authorized works of the rightful owners.

  • Not to be reproduced or distributed without explicit permission.
  • Not used for commercial purposes outside of approved use cases.
  • Not used to infringe on the rights of the original creators.
  • If you believe any content infringes your copyright, please contact us immediately.

Support

For help with questions, suggestions, or problems, please contact us