Quartz, Feldspar & Quartzite/Stone Minor Mineral Mines at Vill. Bayal, Narnaul, Mahendragarh, Haryana Revised Environment Im

Quartz, Feldspar & Quartzite/Stone Minor Mineral Mines at Vill. Bayal, Narnaul, Mahendragarh, Haryana Revised Environment Im

Revised Environment Impact Study and Environment Management Plan Report (EIA & EMP) As per 25th EAC Meeting, MoM dated 21-22nd Dec 2017 Quartz, Feldspar & Quartzite/Stone Minor Mineral Mines At Vill. Bayal, Narnaul, Mahendragarh, Haryana Khasra No. 201, 223 & 224, Production Capacity- 55,00,000TPA Lease Area-76.75 Hectors Lease Period- 35 years Project Category- A Monitoring Period- March – May 2017 File No.- IA/HR/MIN/62041/2017 Applicant Mr. Manmohan Bhadana, R/o V & PO- Anangpur; Dist.- Faridabad (Haryana) Consultant: VOYANTS SOLUTIONS PRIVATE LIMITED 403, 4th Floor, Park Centra Sector – 30, NH – 8, Gurugram– 122 001, India Tel: +91-124-4598200 (30 Lines),Fax: +91-124- 4019051, E-mail: [email protected] Website : www.voyants.in Accredited EIA Consultant Organization by NABAT, QCI New Delhi Certificate no. NABET/EIA/158/SA 026, 1ST June 2018 (Sr. No. 154 of list of Accredited Consultant Organization (Alphabetically)Rev. 61 January 05,2018, MoEF&CC) January 2018 BAYAL QUARTZ, FELDSPAR & QUARTZITE STONE MINE, MAHENDRAGARH, HARYANA EIA/EMP Report TABLE OF CONTENTS 1 INTRODUCTION AND PROJECT BACKGROUND ............................................................ 5 1.1 PREAMBLE ........................................................................................................................................................... 5 1.2 PURPOSE OF THE REPORT ............................................................................................................................ 5 1.3 BRIEF DESCRIPTION OF NATURE, SIZE AND LOCATION OF PROJECT ...................................... 5 1.4 LOCATION AND APPROACH TO THE PROJECT ..................................................................................... 6 1.5 DETAILS OF PROJECT PROPONENT ....................................................................................................... 10 1.6 DETAILS OF CONSULTANTS ...................................................................................................................... 10 1.6.1 Environment Consultant .......................................................................................... 10 1.6.2 Mining Plan Consultant (RQP) ................................................................................. 10 1.7 SALIENT FEATURES OF PROJECT ........................................................................................................... 10 1.8 LEGISLATION APPLICABLE TO MINING OF MINERAL SECTOR ................................................. 11 1.9 SCOPING OF THE PROJECT ......................................................................................................................... 18 1.10 GENERIC STRUCTURE OF ENVIRONMENTAL IMPACT ASSESSMENT DOCUMENT .......... 18 1.11 TERMS OF REFERENCE (TOR) COMPLIANCE ..................................................................................... 19 1.12 CLARIFICATION TO QUERY........................................................................................................................ 31 2 PROJECT DESCRIPTION..................................................................................................... 34 2.1 GENERAL ............................................................................................................................................................ 34 2.2 DESCRIPTION OF THE PROJECT .............................................................................................................. 34 2.3 NATURE AND SIZE ......................................................................................................................................... 34 2.4 LOCATION .......................................................................................................................................................... 35 2.5 DETAILS OF EXPLORATION ....................................................................................................................... 38 2.6 METHODS OF ESTIMATION OF RESERVES ......................................................................................... 39 2.7 CHEMICAL COMPOSITION .......................................................................................................................... 44 2.8 PROPOSED SCHEDLE FOR IMPLEMENTATION PROPOSED SCHEDLE FOR IMPLEMENTATION ..................................................................................................................................................... 44 2.8.1 Production & development for the next five years (refer Plate no 5 to 9) ............... 44 2.9 PROPOSED SCHEDLE FOR IMPLEMENTATION................................................................................. 45 2.9.1 Methodology ........................................................................................................... 46 2.9.2 Conceptual mine plan parameter ............................................................................ 46 2.9.3 Ultimate Size of the pit ............................................................................................ 46 2.9.4 Final Slope angle ..................................................................................................... 46 2.9.5 Ultimate Capacity of dumps .................................................................................... 46 2.9.6 Waste ...................................................................................................................... 47 2.9.7 Post Mining Reclamation plan including Afforestation: .......................................... 47 2.9.8 Extent of Mechanization ......................................................................................... 47 2.9.9 Blasting Parameters ................................................................................................ 47 2.9.10 Type of Explosives.................................................................................................... 48 2.9.11 Initiation System and minimum charge per delay ................................................... 48 2.9.12 Secondary Blasting .................................................................................................. 48 2.9.13 Storage of explosive ................................................................................................ 48 2.9.14 Blasting Operation Near Habitation ........................................................................ 49 2.10 ANNUAL PRODUCTION SINCE 1994 ...................................................................................................... 49 2.11 GENERAL FEATURES .................................................................................................................................... 49 2.11.1 Surface Drainage Pattern ........................................................................................ 49 2.11.2 Drainage Around and Within Mine: ........................................................................ 49 i | P a g e BAYAL QUARTZ, FELDSPAR & QUARTZITE STONE MINE, MAHENDRAGARH, HARYANA EIA/EMP Report 2.11.3 Dewatering .............................................................................................................. 49 2.11.4 Transportation ........................................................................................................ 50 2.11.5 Beneficiation / Processing ....................................................................................... 50 2.12 SITE SERVICES ................................................................................................................................................. 51 2.12.1 Manager's Office ..................................................................................................... 51 2.12.2 Canteen -cum-rest shelter ....................................................................................... 51 2.12.3 Store ........................................................................................................................ 51 2.12.4 First Aid Room ......................................................................................................... 51 2.12.5 Crèche ...................................................................................................................... 51 2.12.6 V.T. Centre ............................................................................................................... 51 2.12.7 Magazine ................................................................................................................. 51 2.12.8 Electricity Supply ..................................................................................................... 51 2.12.9 Water Requirement ................................................................................................. 52 2.12.10 Mine Safety ............................................................................................................. 52 2.13 MANPOWER REQUIREMENTS .................................................................................................................. 53 2.14 SITE ELEVATION WORKING DEPTH AND GROUND WATER TABLE ....................................... 53 3 ANALYSIS OF ALTERNATIVES (TECHNOLOGY AND SITE) ..................................... 55 3.1 GENERAL ............................................................................................................................................................ 55 3.2 ANALYSIS FOR ALTERNATIVE SITES AND MINING TECHNOLOGY ............................................... 55 3.2.1 Alternative Site .......................................................................................................

View Full Text

Details

  • File Type
    pdf
  • Upload Time
    -
  • Content Languages
    English
  • Upload User
    Anonymous/Not logged-in
  • File Pages
    811 Page
  • File Size
    -

Download

Channel Download Status
Express Download Enable

Copyright

We respect the copyrights and intellectual property rights of all users. All uploaded documents are either original works of the uploader or authorized works of the rightful owners.

  • Not to be reproduced or distributed without explicit permission.
  • Not used for commercial purposes outside of approved use cases.
  • Not used to infringe on the rights of the original creators.
  • If you believe any content infringes your copyright, please contact us immediately.

Support

For help with questions, suggestions, or problems, please contact us