D6.3 Final Demo and Testbed Experimentation Results

D6.3 Final Demo and Testbed Experimentation Results

5G Programmable Infrastructure Converging disaggregated network and compUte REsources D6.3 Final Demo and Testbed experimentation results This project has received funding from the European Union’s Framework Programme Horizon 2020 for research, technological development and demonstration 5G PPP Research and Validation of critical technologies and systems Project Start Date: June 1st, 2017 Duration: 36 months Call: H2020-ICT-2016-2 Date of delivery: 31st May 2020 Topic: ICT-07-2017 Version 1.0 Project co-funded by the European Commission Under the H2020 programme Dissemination Level: Public Grant Agreement Number: 762057 5G Programmable Infrastructure Converging Project Name: disaggregated network and compUte Resources Project Acronym: 5G-PICTURE Document Number: D6.3 Document Title: Final Demo and Testbed experimentation results Version: 1.0 Delivery Date: 31 May 2020 Responsible: COMSA Editor(s): Manuel Alfageme (COMSA) Authors: Manuel Alfageme, Juan Agustí, Sergio Martínez, Martí Roset, Romeo Santiago (COMSA) Jim Zou (ADVA) Peter Legg, Richard Graham (BWT) Salvatore Pontarelli (CNIT) Paula Ciria (FGC) Amin Emami, Arash Farhadi Beldachi, Anna Tzanakaki, Hamid Falaki (UNIVBRIS-HPN) Nebojsa Maletic, Darko Cvetkovski, Meysam Goodarzi, Marcus Ehrig, Eckhard Grass, Jesús Gutiérrez (IHP) Jorge Paracuellos, Alan Holt, Rodrigo Mompó (ZN) Ferran Cañellas, Daniel Camps (I2CAT) Hadi Razzaghi (UPB), Kostas Choumas, Paris Flegkas (UTH), Vaia Kalokidou (UNIVBRIS-CSN), Ioanna Mesogiti (COS) Final demonstration, Use Cases, 5GUK smart city, Rail Keywords: Demo, Stadium Demo, Final Deployment, KPIs evaluation Status: Final Dissemination Level Public Project URL: http://www.5g-picture-project.eu/ 5G-PICTURE Deliverable Revision History Rev. N Description Author Date Railway Demonstration of Railway Use Case. Initial v0.1 COMSA 29/11/2019 draft. Demonstration of Railway Use Case. Draft Contributions from: v0.2 18/12/2019 for review. ADVA, BWT, COMSA, CNIT, FGC Demonstration of Railway Use Case. Initial Contributions from: v0.3 14/02/2020 version for revision. ADVA, BWT, COMSA, CNIT, FGC Demonstration of Railway Use Case. Minor Contributions from: v0.4 26/02/2020 revisions and formatting. ADVA, BWT, COMSA, CNIT, FGC Demonstration of Railway Use Case. Final Contributions from: v0.5 03/03/2020 document. ADVA, BWT, COMSA, CNIT, FGC v0.6 Remove confidential content ADVA 20/03/2020 v0.7 Final review BWT, COMSA 06/04/20 Smart City Hamid Falaki, Amin Emami, Arash Demonstration of Smart city Use Case. v0.1 Beldachi, Anna Tzanakaki 06/05/2020 Initial draft. (UNIVBRIS-HPN) v0.2 Contribution of mMIMO Jens Bartelt (XDE) 06/05/2020 Nebojsa Maletic, Marcus Ehrig, v0.3 Contribution on mmWave backhaul Meysam Goodarzi, Darko Cvetkovski 06/05/2020 (IHP) Nebojsa Maletic, Eckhard Grass, v0.35 Final contributions 15/05/2020 Jesús Gutiérrez (IHP) Arash Beldachi (UNIVBRIS-HPN), v0.4 Final version of the section 25/05/2020 Jesús Gutiérrez (IHP) Stadium Demonstration of Stadium Use Case. v0.1 Jorge Paracuellos (ZN) 30/03/2020 Initial draft. Demonstration of Stadium Use Case. I2CAT, UPB, UTH, v0.2 23/04/2020 Draft for review. UNIVBRIS-CSN, ZN Demonstration of Stadium Use Case. Final v0.3 Jorge Paracuellos (ZN) 20/05/2020 version for review. v0.4 Final Version Jorge Paracuellos (ZN) 28/05/2020 Others v0.1 Section 2 Ioanna Mesogiti (COS) 14/05/2020 Darko Cvetkovski, Meysam Goodarzi, v0.2 Added contribution to Section 6 28/05/2020 Nebojsa Maletic (IHP) Paris Flegkas (UTH) Ioanna Mesogiti (COS) v1.0 Final revision and submission to the EC 31/05/2020 Anna Tzanakaki (UNIVBRIS-HPN) Jesús Gutiérrez (IHP) H2020-ICT 2016-2017-76205 Page 3 of 217 01. Jun. 2020 5G-PICTURE Deliverable Table of Contents List of Figures ...................................................................................................................................................... 7 List of Tables ......................................................................................................................................................14 Executive Summary ............................................................................................................................................16 1. Introduction ...............................................................................................................................................18 1.1 Organization of the document .................................................................................................................. 18 2. Evaluation Framework and KPIs Overview .................................................................................................20 2.1 Overview of 5G Network and Services KPIs ............................................................................................... 20 2.2 Overview of KPIs Evaluation in 5G PICTURE .............................................................................................. 22 2.2.1 KPIs Evaluation through Architecture and Deployment Options’ Analysis ....................................... 22 2.3 KPIs Evaluation through 5G-PICTURE Demonstrators ............................................................................... 22 3. Railway Demonstration ..............................................................................................................................29 3.1 Introduction .............................................................................................................................................. 29 3.1.1 Rail use case. Evolution to 5G ........................................................................................................... 29 3.1.2 Optional multitenant Network Model .............................................................................................. 29 3.1.3 High Performance Solution Architecture. MmWave RAN ................................................................ 30 3.1.4 High Performance Solution Architecture. G.metro and 100G aggregation ...................................... 30 3.2 Existing Infrastructures in FGC .................................................................................................................. 31 3.2.1 Existing infrastructures KPIs .............................................................................................................. 36 3.2.2 Selected KPIs ..................................................................................................................................... 36 3.2.3 Typical KPIs for existing wireless networks in FGC ............................................................................ 37 3.3 5G-PICTURE Demonstrator. Introduction .................................................................................................. 38 3.4 Demo objectives ........................................................................................................................................ 39 3.4.1 Key objectives ................................................................................................................................... 39 3.4.2 Performance tests general description ............................................................................................. 40 3.5 Demo Location .......................................................................................................................................... 40 3.5.1 Line information ................................................................................................................................ 40 3.5.2 Martorell Enllaç – Olesa Track Section .............................................................................................. 41 3.6 Train equipment description ..................................................................................................................... 43 3.6.1 TCN scheme ...................................................................................................................................... 43 3.6.2 On-board mmWave Units ................................................................................................................. 44 3.6.3 TCN Ethernet Ring ............................................................................................................................. 51 3.6.4 TCN FlowBlaze ................................................................................................................................... 53 3.6.5 Comments ......................................................................................................................................... 53 3.7 Track equipment description ..................................................................................................................... 54 3.7.1 TAN components description............................................................................................................ 54 3.7.2 Track section deployment ................................................................................................................. 54 3.7.3 Components located in a single stanchion ....................................................................................... 57 3.7.4 TAN mmWave AP’s (DN101) ............................................................................................................. 58 3.7.5 TAN Passive WDM Remote Node ..................................................................................................... 58 3.7.6 Actual installation ............................................................................................................................

View Full Text

Details

  • File Type
    pdf
  • Upload Time
    -
  • Content Languages
    English
  • Upload User
    Anonymous/Not logged-in
  • File Pages
    216 Page
  • File Size
    -

Download

Channel Download Status
Express Download Enable

Copyright

We respect the copyrights and intellectual property rights of all users. All uploaded documents are either original works of the uploader or authorized works of the rightful owners.

  • Not to be reproduced or distributed without explicit permission.
  • Not used for commercial purposes outside of approved use cases.
  • Not used to infringe on the rights of the original creators.
  • If you believe any content infringes your copyright, please contact us immediately.

Support

For help with questions, suggestions, or problems, please contact us