A Country Presentation from Nepal Strengthening Rail Transport

A Country Presentation from Nepal Strengthening Rail Transport

Strengthening Rail Transport Connectivity in South and South West Asia A country presentation from Nepal th 15 March 2017 Ananta Acharya 1 TIMELINE 1927: Raxaul Amlekhgunj Railway construction started and continued in operation till 1970AD 1937: Feb 16 Jaynagar-janakpur-Bijalpura (NJJR) 51 km came into operation but in 2000 washout of Bigi Bridge, the service remained limited only to Janakpur (29km) 2 Initiatives 2006: Nepal signed Trans Asian Railways (TAR)Agreement 2008: East West Electrified Railway Project Office Established. 2009: Feasibility study of East-West(945km), Kathmandu - Pokhara(187km), Anbukhaireni-Bharatpur link(72km) completed. 2010 : MoU between GOI and GON signed for cross border railway connectivity at 5 different locations. 3 Contd, 2011 : In June 15 Department of Railways Established. 2012 :Feasibility study of KTM Valley MRT completed 2013 : Detailed Project Report of Simara-Bardibas and Birgunj link completed(136km) 2014 : Construction Began for track bed, RUB and ROB in Bardibas-Lalbandi section 4 Nepal became a member of Trans Asian Railways (TAR) GoN signed on 10 November, 2006 Ratification on 6 March, 2012 ` 5 National Railway Network Plan 6 Railway length as per Feasibility Study Report (2008) Section Length (km) MechI-Mahakali 945 Kathmandu-Pokhara 187 Anbukhaireni-Tamsaria 72 Simra-Birgunj 33 Butwal –Bhairhwa-Lumbini 44 Kohalpur - Nepalgunj 14 Itahari-Biratnagar 22 Total 1317 7 Cross Border Railway Project Progress 1. Jaynagar- Janakpu-Bardibas ( 69km) . 80% of Earthwork and Culverts completed, 50% of Bridge works complete, Station Building works are underway in Jaynagar-Janakpur Section, . 65% of Earthwork and Culverts completed, 20% of Bridge works complete, Station Building works are underway in Janakpur-Bijalpura Section . Construction of Staff’s quarters are in progress 8 Cross border Railway Projects Contd. 2. Bathnaha-Jobbani-Biratnagar (5+13km) . Track bed, bridge and culvert works in progress. Station Building and staff’s quarters in progress. 9 Progress Achieved till date . DPR Preparation : . Bardibas-Butwal – 300 km, Simara-Birgunj 28 km, Butawal –Lumbini 44 km completed. Bardibas-Kakarvitta including Itahari Biratnagar Link (262 km) is underway. Butwal -Mahakali Section (412km) is at the final stage of consultant selection for DPR Preparation . Feasibility Study of Nijgadh-Hetauda-Bharatpur completed in sept.2016 and Kathmandu-Birgunj is under evaluation process 10 Progress Achieved, Contd, . Construction: (East-West Railway) . Construction of Trackbed, RUB and Bridges in the 30 km section of East West Railway (Bardibas-Lalbandi) has already been started. 11 12 13 14 15 16 17 .

View Full Text

Details

  • File Type
    pdf
  • Upload Time
    -
  • Content Languages
    English
  • Upload User
    Anonymous/Not logged-in
  • File Pages
    17 Page
  • File Size
    -

Download

Channel Download Status
Express Download Enable

Copyright

We respect the copyrights and intellectual property rights of all users. All uploaded documents are either original works of the uploader or authorized works of the rightful owners.

  • Not to be reproduced or distributed without explicit permission.
  • Not used for commercial purposes outside of approved use cases.
  • Not used to infringe on the rights of the original creators.
  • If you believe any content infringes your copyright, please contact us immediately.

Support

For help with questions, suggestions, or problems, please contact us