Wembley Growth

Wembley Growth

Water Case Study Wembley Growth Client: Thames Water / Optimise, Brent Council In Brief... Location: Wembley, North London Barhale, on behalf of Thames Water/Optimise, re- laid trunk sewers at Wembley as a result of a number of new developments within the Value: £1.6m catchment surrounding Wembley Stadium. The works were to resolve Duration: 10 Months flooding, which had been occurring and prevent future flood events as a result of 1 in 30 year storms. The scheme, which commenced in May and was completed in December 2015, consisted of the following works: • Pipe laying on Fulton Road and Grove Way, which involved: • Upsizing 300 metres of 300mm to new 450mm/525mm diameter sewers • Installation of 21 metres of 375mm and 140 metres of 300mm diameter sewers • Installation of 22 no. manholes Customer Benefits... The Barhale/Optimise customer relations team met every 2 weeks with all of the major stakeholders to coordinate all interactions with neighbouring surroundings. Stakeholders consisted of: • Quintain the property and investment company (land owner Looking from Olympic Way to Wembley Park Station at Wembley) • Wembley Stadium • Brent Council • Fountain Studios (where X Factor live was filmed every weekend) • Wembley Arena Barhale had to tailor works to satisfy noise and vibration constraint and worked around the Wembley Stadium events, which meant fully demobilising from the area for major football matches, the Rugby World Cup matches and NFL games. To reduce the interface between the works and the Rugby World Cup schedule Barhale provided extra resources on Fulton Road during August to accelerate the programme. Barhale also worked around the Wembley Stadium music events such as Ed Sheeran concerts and the local marathon by reducing the site compound footprints. Technical Features... Looking from Olympic Way to Wembley Stadium Wembley Stadium and its surrounding environment is a very busy pedestrian traffic route. This level of pedestrian traffic proved to be a big challenge facing the project especially as there were numerous events that took place at the Stadium and the neighbouring Wembley Arena. To protect members of the public and minimise disruption to them, strategic planning of the work area was required. This was especially pertinent for the pedestrian crossing location on Olympic Way, as it was the main crossing point for members of the public who departed the Wembley Park Underground Station. The management of the space and the number of the operatives in a confined site was vital to ensure that the programme could be successfully met in a safe way. Barhale, Barhale House, Bescot Crescent, Walsall, West Midlands WS1 4NN www.barhale.co.uk Safety | Communication | Quality | Integrity | TeamSpirit | Caring | Trust | Pride.

View Full Text

Details

  • File Type
    pdf
  • Upload Time
    -
  • Content Languages
    English
  • Upload User
    Anonymous/Not logged-in
  • File Pages
    1 Page
  • File Size
    -

Download

Channel Download Status
Express Download Enable

Copyright

We respect the copyrights and intellectual property rights of all users. All uploaded documents are either original works of the uploader or authorized works of the rightful owners.

  • Not to be reproduced or distributed without explicit permission.
  • Not used for commercial purposes outside of approved use cases.
  • Not used to infringe on the rights of the original creators.
  • If you believe any content infringes your copyright, please contact us immediately.

Support

For help with questions, suggestions, or problems, please contact us