Marine Infrastructure Developer Private Limited (MIDPL)

Marine Infrastructure Developer Private Limited (MIDPL)

Marine Infrastructure Developer Private Limited (MIDPL) Executive Summary PROPOSED REVISED MASTER PLAN DEVELOPMENT OF KATTUPALLI PORT December 2020 PREPARED BY C1161303 NABET ACCREDITED Certificate No: NABET/EIA/2023/RA 0175 RP003, Rev. A L&T Infrastructure Engineering Ltd. Client: Marine Infrastructure Developer Private Limited (MIDPL) Project: Proposed Revised Master Plan Project No.: Development of Kattupalli Port C1161303 Title: Document No.: Rev.: Executive Summary RP003 A This document is the property of L&T Infrastructure Engineering Ltd. and File path: must not be passed on to any person or body not authorised by us to receive it l:\ports\2016\c1161303 - ceia kattupalli port nor be copied or otherwise made use of either in full or in part by such person or expansion\outputs\reports\rp003-executive summary\13.12.2020\executive body without our prior permission in writing. summary-14.12.2020.docx Notes: 1. Revision Details: SAP TKS A 13.12.2020 Second Submission SNV BRT S SNV SAP TKS 0 26.10.2020 First Submission Sd/- Sd/- Sd/- IRR BRT S Init. Sign. Init. Sign. Init. Sign. Rev. Date Details Prepared Checked Approved Table of Contents Proposed Revised Master Plan Development of Kattupalli Port C1161303 Executive Summary RP003 rev. A TABLE OF CONTENTS 1 Introduction .....................................................................................................................................1 2 Project Site ......................................................................................................................................1 3 Need and Justification for Revision of Master Plan for Kattupalli Port ....................................1 4 Project Benefits ..............................................................................................................................2 5 Project Description .........................................................................................................................2 5.1 Cargo Mix and Cargo Handling Capacity .................................................................................3 5.2 Salient Features of the Revised Master Plan Development .....................................................3 6 CRZ Compatibility ...........................................................................................................................6 7 Analysis of Alternatives .................................................................................................................6 8 Comprehensive EIA/EMP Study ....................................................................................................6 9 Description of Environment ..........................................................................................................7 9.1 Terrestrial Environment .............................................................................................................7 9.2 Marine Environment ..................................................................................................................9 9.2.1 Three Season Estuarine Study .................................................................................... 10 9.2.2 Marine Biodiversity Assessment .................................................................................. 12 9.3 Socio Economic Conditions ................................................................................................... 13 10 Anticipated Environment Impacts and Mitigation Measures .................................................. 13 10.1 Construction Phase ................................................................................................................ 13 10.1.1 Impacts due to port activities and Infrastructures ........................................................ 14 10.1.2 Material Transport and Construction Activities ............................................................ 14 10.1.3 Land Reclamation ........................................................................................................ 15 10.1.4 Marine Side Construction Activities and Fishing ......................................................... 15 10.1.5 Solid Waste Management including Handling of Hazardous Waste ........................... 15 10.1.6 Water Resource ........................................................................................................... 16 10.2 Operation Phase .................................................................................................................... 16 10.2.1 Hydrodynamic Study .................................................................................................... 16 10.2.2 Spectral Wave Study ................................................................................................... 17 10.2.3 Historical Shoreline Changes ...................................................................................... 17 10.2.4 Shoreline Change Prediction ....................................................................................... 18 10.2.5 Shoreline Management Plan ....................................................................................... 18 10.2.6 Tsunami Modelling ....................................................................................................... 19 10.2.7 Cyclone Modelling ....................................................................................................... 19 10.2.8 Ship Tranquillity Study ................................................................................................. 19 10.2.9 Flood Model Study ....................................................................................................... 19 10.2.10 Sedimentation Study ............................................................................................. 20 10.2.11 Dredge Soil Disposal and Dispersion .................................................................... 20 10.2.12 Recirculation study ................................................................................................ 21 10.2.13 Oil Spill Risk Assessment ...................................................................................... 21 10.2.14 Air modelling .......................................................................................................... 21 10.2.15 Cargo handling/Inland Cargo Movement/Storage/Regasification/ Equipment Operation 21 10.2.16 Aqueous Discharges including Accidental Spills ................................................... 22 10.2.17 Maintenance Dredging .......................................................................................... 22 10.2.18 Water Resource ..................................................................................................... 22 10.2.19 Seawater (Regasification) and Water (Desalination Plant) Withdrawal ................ 23 10.2.20 Solid Waste Management including Handling of Hazardous Waste ..................... 23 10.2.21 Fishing Livelihood .................................................................................................. 24 10.2.22 Reclaimed Backup Area or Bund .......................................................................... 24 10.2.23 Operation of Port ................................................................................................... 25 10.2.24 Proposed use of LNG FSRU and LPG FSO as an Interim Option ........................ 25 11 Additional Studies ....................................................................................................................... 25 Table of Contents Page i C1161303 Proposed Revised Master Plan Development of Kattupalli Port RP003 rev. A Executive Summary 11.1 Risk Analysis .......................................................................................................................... 25 11.2 Traffic and Transportation Study ............................................................................................ 26 11.2.1 Proposed Road Connectivity ....................................................................................... 26 11.2.2 Proposed Railway Connectivity ................................................................................... 26 11.2.3 Proposed Inland Waterway Connectivity ..................................................................... 26 11.3 Social Impact Assessment ..................................................................................................... 27 11.4 Disaster Management Plan .................................................................................................... 27 12 Environmental Monitoring Programme ..................................................................................... 27 13 Environment Management Plan ................................................................................................. 28 14 Budgetary Estimate for Environment Management ................................................................. 28 15 Project completion schedule ...................................................................................................... 28 LIST OF FIGURES FD0101: Location Map FD0202: Master Plan FD0102: Study Area Map LIST OF TABLES Table 5-1: Cargo Mix for Revised Master Plan ....................................................................................... 3 Table 5-2: Salient Features of Proposed Development .......................................................................... 3 Table 9-1: IUCN/IWPA listed Fauna species reported in 10 km buffer area ..........................................

View Full Text

Details

  • File Type
    pdf
  • Upload Time
    -
  • Content Languages
    English
  • Upload User
    Anonymous/Not logged-in
  • File Pages
    44 Page
  • File Size
    -

Download

Channel Download Status
Express Download Enable

Copyright

We respect the copyrights and intellectual property rights of all users. All uploaded documents are either original works of the uploader or authorized works of the rightful owners.

  • Not to be reproduced or distributed without explicit permission.
  • Not used for commercial purposes outside of approved use cases.
  • Not used to infringe on the rights of the original creators.
  • If you believe any content infringes your copyright, please contact us immediately.

Support

For help with questions, suggestions, or problems, please contact us