Vlissingen Rede -> Terneuzen -> Gent

Vlissingen Rede -> Terneuzen -> Gent

Vlissingen Rede -> Terneuzen -> Gent Outer Harbour Terneuzen Presently there are following restrictions for entering the harbour … Vessels with draught less than 9,10 m : -> unrestricted Vessels with draught between 9,10 m and 11,49 m : -> only during their tidal window Vessels with draught of 11,50 m or more : -> only during their tidal window -> only during periods of still water or weak currents Outer Harbour Terneuzen Reasons for these restrictions … -> During every tide there are periods with very strong currents. -> The width of the entrance / Distance between the breakwaters - 280 m at LAT = NAP – 2,69 m - 200 m at LAT – 11,31 m = NAP – 14,00 m CURRENT Outer Harbour Terneuzen The project of the ‘New Lock Terneuzen’ also includes the modification of the Outer Harbour Terneuzen by making the entrance abt. 70 m wider to allow all vessels up till the maximum draught of 12,50 m to pass the breakwaters all ‘around the tide’ West Lock Terneuzen Dimensions of the West Lock : -> length : 290 m between inner doors 355 m between outer doors -> width : 40 m from side to side 38 m between fenders -> depth: outside : NAP – 12,82 m - LAT – 10,13 m inside : NAP – 11,37 m - KP – 13,50 m West Lock Terneuzen Maximum dimensions of vessels : -> length : 265 m -> beam : 34 m with max. length of 265 m or 37 m with max. lenght of 230 m -> draught : 12,50 m West Lock Terneuzen Vessels with a beam of more than 34 m require : -> 2 pilots -> a certified wheelman / quartermaster -> the use of minimum 4 tugboats -> the use of Qastor The “Canel” Ghent - Terneuzen General • Build started in 1823 and opened in 1829 • Present form since 1963 • Both Belgium and Dutch • Dimensions Belgium Netherland Length 7,5 7,5 Depth 13,5 13,5 Width 200/150/125 – 68/50 150 – 62 • Berths The lock on the inside • Exchange from seawater with fresh water in the lock • Surface current is against • Seawater is collected and pumped to the river • Leaving vs entering lock • Interaction Challenges and not only for pilots • Bancking and Suction • Closed and open channel • Interaction between ships • Crossing and overtaking • Meeting points are limited for large vessels • Passing bridges Challenges and not only for pilots • Technical malfunctions (Vessel, Other vessels and bridges) • Speed limits pending on draft • Squat • Damage to others • Path width with strong winds • Weather conditions Changes in the last ten years • Qastor, SNMS • Bigger ships (wider) entering the lock • GTI, no more ratrace to the lock and waiting for several hours • Building a new lock • Priority ships Channel pilot’s from Belgium and Netherlands alway’s are equily involved in all of these changes .

View Full Text

Details

  • File Type
    pdf
  • Upload Time
    -
  • Content Languages
    English
  • Upload User
    Anonymous/Not logged-in
  • File Pages
    42 Page
  • File Size
    -

Download

Channel Download Status
Express Download Enable

Copyright

We respect the copyrights and intellectual property rights of all users. All uploaded documents are either original works of the uploader or authorized works of the rightful owners.

  • Not to be reproduced or distributed without explicit permission.
  • Not used for commercial purposes outside of approved use cases.
  • Not used to infringe on the rights of the original creators.
  • If you believe any content infringes your copyright, please contact us immediately.

Support

For help with questions, suggestions, or problems, please contact us