UPDATED FORM – I FOR INCLUSION OF TITANIUM SLAG IN PRODUCT MIX AND CHANGE IN CONFIGURATION OF 36,000 TPA FERRO ALLOY PLANT In INTEGRATED STEEL PLANT SUBMITTED UNDER CLAUSE 7(ii) OF SO 1533 (E) At TANDWA & KUNDRU VILLAGES, TILDA TEHSIL, RAIPUR DISTRICT, CHHATTISGARH By SHRI BAJRANG POWER & ISPAT LIMITED UPDATED FORM 1 (As per New Notification of Mo.E.F dated 1-12-2009 vide SO 3067 (E) (I) BASIC INFORMATION S. No Item Details 1 Name of the Project/s Integrated Steel Plant Shri Bajrang Power and Ispat Ltd. Inclusion Of Titanium Slag In Product Mix And Change In Configuration Of 36,000 TPA Ferro Alloy Plant (Environmental Clearance under clause 7 (ii)) 2 S. No. in the schedule 3(a) Metallurgical industries (ferrous & nonferrous) 3 Proposed capacity/ area/ SBPIL proposes to include Titanium slag as one of length/ tonnage to be handled/ the product in Ferro Alloy Plant in addition to command area/ lease area/ Silico and Ferro manganese production. Also number of wells to be drilled SBPIL proposes to change the configuration of the second unit by installing 2 X 4.5 MVA furnaces instead of 1 X 9.0 MVA single furnace. The details of proposed changes in Ferro Alloy Plant are given below Proposed change in Ferro Alloys Plant Proposed Total S.No. Products Remarks capacity & Configuration Production of 18000 TPA Silico Silico & 1 x Manganese from 1 Ferro 18000 TPA established (1x9 Manganese MVA) Submerged Arc Furnace (SAF). 2 Installation of 2 x 4.5 MVA Submerged Arc Furnace (SAF) replacing (1 x9 MVA) Titanium 1 x SAF for production Slag 18000 TPA of 18000 TPA Titanium Slag which is a high valued sellable product. By-Product from Titanium Slag Plant which is of high Pig Iron 10,000 TPA grade and is sellable in market/captive consumption in SMS. The project is located in Tandwa & Kundru Villages, Tilda Tehsil, Raipur District, and Chhattisgarh. Area of the Plant 141.19 Ha (348.89 acres). 4 New/ expansion/modernization Modernization Environmental Clearance under clause 7 (ii) 5 Existing capacity/ Area etc. SBPIL has implemented the following units Existing capacities: TOTAL CAPACITY INSTALLED FOR UNITS TOTAL S.NO. PARTICULARS WHICH EC CAPACITY & HAS BEEN CONFIGURATION GRANTED 0.6 MTPA 1st & 2nd Kiln 0.4 Sponge Iron (3 X 600 01 MTPA (2 X 600 Plant TPD X 330 TPD X 330 Days) Days) 2 x 16 MW = WHRB 3 X 16 MW 32MW 02 9 MW Combustor AFBC 42 MW (35 TPH Boiler) 03 Pellet Plant 1.40 MTPA 1.40 MTPA 1 X 17000 Nm3/Hr + 5500 3 X 17000 04 Coal Gasifier Nm3/Hr Nm3/Hr Total = (22,500 Nm3/Hr) Iron Ore 05 Beneficiation 2.0 MTPA 2.0 MTPA Plant 1 x 18000 TPA Ferro Alloys 36,000 (Established) 06 Plant TPA (CTO application under process) Fly Ash Bricks 100,00,000 07 100,00,000 NPA Plant NPA Area: 348.89 acre 6 Category of Project i.e ‘A’ or ‘B’ A 7 Does it attract the general No condition? If yes please specify. 8 Does it attract the specific No condition? If yes please specify. 9 Location The Integrated steel plant is located at Villages: Tandwa & Kundru, Block -Tilda, District- Raipur, and State- Chhattisgarh 493 116. The Area falls in Survey of India, Topo-sheet No. 64 G/10, 64 G/14, 64 G/15 The geographical location of the plant area are given below :- S.No. Latitude Longitude 1 21°29'20.7"N 81° 45'41.0"E 2 21°29'06.1"N 81° 46'11.9"E 3 21°29'06.3"N 81° 46'10.9"E 4 21°29'31.3"N 81° 46'20.8"E Plot/ Survey/ Khasra No 521/44 Village Tandwa & Kundru, Block Tilda Tehsil Tilda District Raipur State Chhattisgarh 10 Nearest railway station/ airport Nearest railway station: along with distance in Kms. Baikunth - 2 Kms, NNE Nearest airport : Swami Vivekananda Airport ~ 33.0 Km, SSW 11 Nearest town, city, district Nearest Town: Tilda Newra~ 6.3 Km, NNE headquarters along with Nearest City: Raipur ~ 45 Km, SSW distance in kms. District HQ: Raipur ~ 45 Km, SSW 12 Village panchayaths, Zilla parishad, Village Panchayat: Gram Panchayat – Villages: Municipal Corporation, Local body Tandwa, Kundru, Tehsil: Tilda, District: (Complete postal addresses with Raipur, Chhattisgarh-493 116. telephone nos to be given) Zila Parishad: Collector Office, Raipur, Chhattisgarh 492 001 Tel: 0771-2426024 Municipal Corporation: Commissioner, Municipal Corporation, Raipur, Chhattisgarh Tel: 0771-2536660 13 Name of the applicant M/s Shri Bajrang Power & Ispat Ltd. 14 Registered address Village: Borjhara, Urla Guma Road, Urla- Growth Center, Raipur 493 221(C.G.) 15 Address for correspondence Kh.No. 521/44, Vill.Tandwa, Dharsiwa- Tilda Road, Tehsil Tilda, Dist-Raipur-493 116 (C.G.) Ph. No.0771 4288025/ 35 Fax No. 0771 4288075 [email protected] Name Mr. S. K. Goyal Designation (Owner /Partner/ Director CEO) Address Village: Borjhara, Urla Guma Road, Urla- Growth Center , Raipur 493221(C.G.) Pincode 493 221 E- mail [email protected] Telephone no. Ph. No.0771 4288019/ 29/ 39 Fax no. Fax No. 0771 4288123 /2323602 16 Details of Alternative sites Not applicable. examined, if any location of EC granted for the project site these sites should be shown on Project site is falling in Topo sheet No. 64 a topo sheet. G/10, 64 G/14, 64 G/15 17 Interlinked projects The present application is for Inclusion of Titanium Slag in Product mix and change in configuration of 36,000 TPA Ferro Alloy Plant Submitted under clause 7(ii) OF SO 1533 (E) 18 Whether separate application of No. interlinked project has been submitted? 19 If yes, date of submission Not Applicable 20 If no, reason The present application is for Inclusion of Titanium Slag in Product mix and change in configuration of 36,000 TPA Ferro Alloy Plant Submitted under clause 7(ii) OF SO 1533 (E) 21 Whether the proposal involves None approval/ clearance under: if yes, details of the same and their status to be given. (a) The Forest (Conservation)Act, 1980 (b) The Wild Life (Protection)Act, 1972 (c) The CRZ Notification, 1991 22 Whether there is any None Government Order/ Policy relevant/ relating to the site? 23 Forest land involved (hectares) None 24 Whether there is any litigation None pending against the project and/or land in which the project is propose to be set up? (a) Name of the court (b) Case No (c) Orders/ directions of the court, if any and its relevance with the proposed project. (II) Activity 1. Construction, operation or decommissioning of the Project involving actions, which will cause physical changes in the locality (topography, land use, changes in water bodies, etc.) Details thereof (with approximate quantities /rates, wherever S.No. Information/Checklist Yes/No possible) with source of confirmation information data 1.1 Permanent or temporary Yes The project was accorded EC for change in land use, land setting up of integrated steel plant. cover or topography including increase in The project is proposed in 348.89 intensity of land use (with acre which is under the possession respect to local land use of M/s Shri Bajrang Power & Ispat plan) Ltd. The project is implemented partially and EC is valid upto 22.05.2022 SBPIL while obtaining the EC validity extension has submitted the Time Schedule for the proposed units which are under implementation SBPIL has obtained EC for installation of 2 X 18000 TPA Ferro Alloy Plant. It is proposed to produce Ferro Manganese and Silico Manganese in the proposed Ferro Alloy Plant as per the EC and CTE obtained. SBPIL has presently installed 1 X 18000 TPA Ferro Alloy Plant with 1 x 9 MVA furnace which is established and Consent to Operate is under process. The second unit of Ferro Alloys Plant is scheduled for installation and commissioning before expiry of Environmental Clearance i.e., as mentioned before September 2021. The subject proposal is request for Inclusion of Titanium Slag in Product mix and change in configuration of 36,000 TPA Ferro Alloy Plant Submitted under clause 7(ii) OF SO 1533 (E) which is under implementation. No additional land will be acquired. No additional land issues/change in land use are involved 1.2 Clearance of existing land, No Not envisaged vegetation and buildings? 1.3 Creation of new land uses? Yes The Land Breakup of the project is S.NO. DETAILS AREA (ACRES ) 1 Area for green belt 115.13 2 Open land & 157.36 Proposed Projects 3 2 x 600 TPD Kilns 41.06 Sponge Iron Division , 32 MW WHRB & 9 MW AFBC Combustor 4 Iron Ore 22.35 Beneficiation Plant 5 Pellet Plant 8.65 6 Ferro Alloys Plant 4.34 Total 348.89 in 348.89 acre is given below 1.4 Pre-construction Yes Pre-construction investigations were investigations e.g. bore done and the project was houses, soil testing? implemented partially. 1.5 Construction works? Yes The construction work will involve installation of balance units of 2 X 4.5 MVA furnaces instead of 1 X 9.0 MVA single furnace in the Ferro Alloy Plant 1.6 Demolition works? No No demolition works involved 1.7 Temporary sites used for Yes Temporary sites for construction construction works or works will be located within the housing of construction existing plant area workers? 1.8 Above ground buildings, Yes Structures will be installed above structures or earthworks ground level including linear structures, cut and fill or excavations 1.9 Underground works No Not envisaged including mining or tunneling? 1.10 Reclamation works? No Not involved 1.11 Dredging? No No dredging is involved 1.12 Offshore structures? No No offshore structures needed.
Details
-
File Typepdf
-
Upload Time-
-
Content LanguagesEnglish
-
Upload UserAnonymous/Not logged-in
-
File Pages20 Page
-
File Size-