Adarsh Gram MP/Party Village Work Done Work in Progress Whats More

Adarsh Gram MP/Party Village Work Done Work in Progress Whats More

WHO’S WHO - Adarsh Gram MP/Party Village work done work In progress whats more Land development, housing for Urwa 1,UP, Sonia Gandhi 38% 46% the poor, roadside plantation, Phase1 INC President wage employment generation Conctruction of compost pits,- Jagdishpur 2, Rahul Gandhi, INC 40% 36% generation of wage employ- UP, Phase 1 Vice President ment, land development, housing for poor families Manmohan Singh, Paschim Bekeli, 12.8% No 148 projects in two phases- only INC Assam 19 schemes completed. Most proj- Detail ects taken from MNREGA. Gravel roads, toilets, 14 anganwadi cen- tres, one health sub centre Motilal Vora, RS Mohlai, Ch- 90% 4% Aadhar generation, animal health hatisgarh scheme, toilet clusters and run- ningw aters in primary and middle schools Distribution of seeds, toolkits, Ghulam Nabi Azad Barthi,- 55% 6% J&K,Phase 1 incentives of apricots Shashi Tharoor Kottukal, Kerala 54.5% 46.5% Eye screening camp,malaria Mallikarjun Kharge, Konkal, Karna- 50% 50% control, 200 toilets, RO water Lok Sabha taka, Phase 1 Jyotiriditya Kasbarenj,MP, 43% 18% Scindhia Phase 1 Abhishek Manu Mandoli 32% 26% Singhvi Ra jasthan Honouring freedom fighters, Ashok Chavan Rohi Pimpalgaon, 32% 45% Maharashtra, awareness programmes on sex Phase 1 ratio, child marriage Kamal Nath Bisapurkala,MP, 31% 69% Phase 1 P J Kurien Naranamoozhy 29% 33% Ahmed Patel Dumkhal,Gujarat 27% 6% Veerappa Moily Agalakuppe, 31% 100% immunisation,BSNL broad- Karnataka 24% band connection,bus services Capt Amarinder Dhaul Kalan, 19% 32% Construction of anganwadio Singh Punjab, Phase 1 centre,panchayat ghar,school boundary,boys toilet in school Saifuddin Soz Kalayban, J&K 11% A K Antony, INC Thaicattussery, 28% New gravel roads, individual Kerala 8% household toilets, ready to use septic tanks, organic vegeta- ble cultivation Ambika Soni Ghanauli,Pun- jab,Phase 1 7% 36% Oscar Fernandes, Shiruru, Karna- 3% No RS, INC taka Detail Electricfication of 50 house- Bakrana,Guja- L K Advani 50% 50% holds,crematoria installation,- rat,Phase 1 BJP constrcution to support Harijan Bund Murli Manohar Singhpur 57% 7% Panchayat Darpan report Joshi, BJP Kachhar, UP, pending .Artificial insemination Phase 1 and vaccination, seed replace- ment,Kisan credit cards Vocational training for women, Sumitra Mahajan, Potlod,Madhya 60% 36% correction of BPL list, gate for Lok Sabha Speaker Pradesh, middle schools BJP Phase 1 Rajveer Raju Aurangabad,UP, 92% Bhaiya Singh Phase 1 Varun Gandhi, LS Vallipur, UP 71% 7% Electrification, mgnrega, solar lighting, sports facilities, animal vaccination Anurag Thakur Dehlan 65% No Lower,Himachal Pradesh, Detail Phase 1 Maj Gen B C Khanduri Dewali 56% 9% Adventure sports tourism, Bhanigram, agricultural work Uttarakhand Poonam Mahajan Charoti, 28% 5% Maharashtra, Phase 1 Electrification, Chandan Mitra Bhadbadia,MP, 25% 50% Phase 1 anganwadi building Bhupender Yadav, Salemabad, 20% 40% Boundary wall of shamshan, RS, BJP Ra jasthan nala nirman, IT centre Vinay Katiyar Baraon, UP 13% 17% Dushyant Singh, Bhalta,Rajas- 9% No BJP than,Phase 1 Detail Yogi Adityanath, Jangle Aurahi, No No Village development plan and now CM UP UP, Phase 1 Panchayat Darpan report Detail Detail pending Sarbananda Kemi Jelem,As- 3% 25% Cremation ground, 6 computer Sonowal, Former sam, Phase 1 sets, sports tournament for the Sports minister and youth, Rabi crop technology now CM Assam Manohar Parikkar, Barauliya, No 7/ 1 6 Pond renovation, CC road former Defence UP,Phase 1 construction Minister and now Detail Projects CM Goa Sakshi Maharaj Tikargarhi, No No Both Village development plan UP,Phase 1 Detail Detail and Panchayat Darpan plan pending still Hari Manjhi, former Bakraur, 42/341 31/341 CM Bihar Bihar,Phase 1 Sharad Pawar, NCP Enkul,Maharash- 98% No Digging of farm ponds, planta- tra,Phase 1 tions, seperate SHGs for hand- Detail icapped people Supriya Sule,NCP Dapodi, Maha- 46% 38% 100% institutional rashtra,Phase 1 deliveries,24*7 electricity supply,5000 trees planted, biogas for households Praful Patel,NCP Pathari, 31% 10% Construction of 30 dustbins, 2 Maharashtra, dhobhi ghats, 2 funeral places, Phase 1 2 samaj mandirs, 28 well plat- forms Boundary wall for primary Tamauli, Mulayam Singh 50% 20% school,gas connection to all Uttar Pradesh, Yadav, SP families,vaccination of cattle Phase 1 Dimple Yadav, SP Saidpur Sakri, 81% 2% Construction of CC roads, soak UP, Phase 1 pits,women SHGs Mayawati,BSP Mall, UP,Phase 1 69% 31% Kanimozhi, DMK Srivenkatesapuram, 68% 20% Construction of individual Tamilnadu households Shibhu Soren, JMM Ranga,Jharkhand, 18% 49% Computers, road to Phase 1 anganwadi, toilet and soakpit in anganwadi Bhagwant Mann, Benra,Punjab No 13% AAP Detail H D Devegowda, Channangihalli, 52% 35% Animal husbandry, irrigation, JD(S) Karnataka, solar street lights Phase 1 Muzzaffar Hussain Landerwan, J&K 22% 14% Baig, PDP Kavita Kalvakuntla, Kandakurthi, 25% 50% Electrification, TRS Telangana, anganwadi building Phase 1 Anbumani Mottankurichi, 47% 13% Ramadoss, PMK Tamilnadu Dushyant Chautala, Makhand, 49% 36% INLD Haryana Rajeev Mangalore, 13% 3% Chandrashekhar, Karnataka Independent.

View Full Text

Details

  • File Type
    pdf
  • Upload Time
    -
  • Content Languages
    English
  • Upload User
    Anonymous/Not logged-in
  • File Pages
    5 Page
  • File Size
    -

Download

Channel Download Status
Express Download Enable

Copyright

We respect the copyrights and intellectual property rights of all users. All uploaded documents are either original works of the uploader or authorized works of the rightful owners.

  • Not to be reproduced or distributed without explicit permission.
  • Not used for commercial purposes outside of approved use cases.
  • Not used to infringe on the rights of the original creators.
  • If you believe any content infringes your copyright, please contact us immediately.

Support

For help with questions, suggestions, or problems, please contact us