London cable tunnels The project London accounts for 20% of the UK’s electricity demand and this is continuing to grow by 3-5% a year. This compares to the UK average of 1-2% a year. It is National Grid’s responsibility to ensure there is sufficient transmission infrastructure available to support future energy demand in London and, as part of our investment programme, we are planning to build four deep tunnels which will house new 400,000 volt (400kV) cables. The work is essential to ensure London has a safe and secure electricity transmission network into the future. These tunnels will connect existing substations at: • Hackney • St John’s Wood • Willesden • Wimbledon • Hurst • Eltham London cable tunnels Traditional cable laying just below the road surface leads to traffic congestion Why a tunnel? In London most electricity is transmitted through underground cables. They are traditionally located just beneath the road surface and work to maintain these cables is carried out in the road. By housing new electricity cables in tunnels deep below the road surface a number of advantages are achieved compared to traditional methods: • Major disruption to the road network throughout London is avoided as we do not need to dig up the streets to lay the cable • Overall disruption to Londoners and road users during construction is significantly reduced as the majority of the works take place under ground • Future repair and maintenance work can be carried out Traffic congestion in London without disrupting traffic, businesses and residents • Additional cables can be installed in the tunnels to meet future demand London cable tunnels How do you build a tunnel? A shaft, approximately 15m in diameter, is sunk at a large construction site known as a drive site. A tunnel boring machine (TBM) is then lowered down the shaft and starts tunnelling along a pre-determined route at approximately 120m per week. The TBM carries out two main activities. It moves forward cutting through the earth and it also inserts a tunnel lining of concrete segments. The TBM ends its journey at a reception site where another TBM breakthrough shaft is sunk and the TBM is removed. London cable tunnels Cable installation Once the tunnel is complete the high voltage cables are pulled through the tunnel from large drums at the drive site. These lengths are then joined together using specialist techniques. The cables connect to National Grid’s substations at either end of the route via the shafts. A cable drum delivery Once the cables are installed, any shafts which are not required for access or ventilation are backfilled. London cable tunnels Working with the community National Grid is committed to working with local communities and to minimising the impact of its works wherever possible. A community relations programme will be carried out before work begins and before any planning applications are submitted for the headhouses which are required as part of the tunnel route. National Grid will maintain regular contact during construction with local communities in a number of different ways including: • Public exhibitions • Project leaflets • Project updates by letter • Dedicated community relations team • Dedicated community relations phone number 0800 783 2855 • Local media We are keen to support the local communities in which we operate and are interested to hear of any community initiatives we could support. These should be in the areas of: • Education and skills • Environment and energy • Community development London cable tunnels Substation Headhouses Ground level Temporary Works Area Shafts Tunnel Shafts and headhouses Intermediate shafts and headhouses are required at key points along the route of the tunnel. The tunnel boring machine will link these points as it progresses along the routes. The shafts and headhouses are needed for the following reasons: • Health & Safety – It is essential to have access points to ensure the safety of our workforce during construction. Tunnel shaft headhouse The shafts are also used to access the tunnel for maintenance work once the tunnel is commissioned • Ventilation – Ventilation equipment, in the form of fans, is required to cool the cables and regulate the temperature inside the tunnel The headhouses will be designed in order to minimise their visual impact on the local area. For example, the building materials will be chosen to complement the surrounding environment in agreement with the local council. London cable tunnels Who is National Grid? National Grid is an international electricity and gas company and one of the largest investor-owned energy companies in the world. We play a vital role in delivering gas and electricity to millions of people across Great Britain and northeastern US in an efficient, reliable and safe manner. We believe the power of action can play a major role in safeguarding our global environment for future generations and tackling the effects of climate change, providing all our customers with the highest standards of service through network investment and through our talented, diverse workforce. National Grid owns the high-voltage electricity transmission network in England and Wales and operates the system across Great Britain. It also owns and operates the high pressure gas transmission system in Britain and its distribution business delivers gas to 11 million homes and businesses. London cable tunnels Edgware Woodford Green Hainault Woodford Muswell Wood Hill Bridge Finchley Green Tottenham Key Wealdstone Hackney to St John’s Wood Proposed tunnel route Walthamstow 12.5km, 4m diameter 400kV Barkingside Proposed tunnel shaft site Kingsbury cable tunnel (2014) Possible future works Hornsey Wanstead Harrow Chadwell Golders Heath Green Finsbury Cricklewood Highgate Stoke Newington Wembley Hackney Leyton Ilford Hampstead Kentish substation Town Holloway Clapton Highbury Brent Willesden to St John’s Wood Kilburn 7.4km, 4m diameter 400kV Hackney Forest Willesden Gate cable tunnel (2015) Homerton Perivale Camden Stratford Dagenham Town West Islington Barking Harlesden St John’s Ham East Wood Willesden Ladbroke Ham substation St John’s Wood enford Grove substation Kensal Green Bethnal Notting Clerkenwell- Shoreditch Green Hill Finsbury-Barbican Hanwell Shepherd’s Marylebone Mile Creekmouth Bush Paddington End Beckton Ealing City of London thall Holborn-Strand- Tower Hill Poplar Acton Covent Garden North Woolwich Kensington West Thamesmead wood Kensington een South Kensington Bermondsey Walworth Isle of Abbey Rotherhithe Dogs Wood Chelsea Woolwich Lambeth New Cross Kew substation Deptford South Charlton Erith Lambeth Fulham Peckham Isleworth Greenwich Barnes West New Cross Brompton Battersea Stockwell Camberwell w Kidbrooke Blackheath Brixton New Cross to Eltham Eltham substation Welling Richmond Putney Clapham Brockley Herne 10.7km cable tunnel (future) Bexleyheath Hill Lewisham Wimbledon to Kensal Green Wandsworth Eltham Roehampton Hither Crayford Dulwich Forest Green 12.1km, 4 metre diameter Balham Hill Twickenham 400kV cable tunnel (2016) Upper Catford Bexley Tooting New Hurst to Eltham Coldblow West Grove 7.1km, 4m diameter 400kV Norwood Park Hurst Wimbledon Streatham cable tunnel (2014) Teddington substation substation Sydenham North Wimbledon Sidcup Cray Foots ampton Crystal Cray Palace Chislehurst Merton Kingston upon Beckenham Bromley Thames Mitcham East New South Bickley Molesey Norwood Malden Shortlands Petts Swanley Wood Thames Surbiton Eden Park Ditton Morden Thornton Saint Mary Hth Hackney to St John’s Wood Tunnel routes Length: 12.5 km Planned Construction: • The total length of the four tunnels is approximately 40km Autumn 2009 – 2014 • Average depth of the tunnels is between 12m and 60m Willesden to St John’s Wood • The tunnel and shafts are below ground and do not Length: 7.4 km require planning approval Planned Construction: Autumn 2009 – 2015 • Headhouses built on private land require planning approval Hurst to Eltham • Planning applications will be submitted from early 2009 Length: 7.1 km • Total investment will be in the region of £600 million Planned Construction: Mid 2009 – 2014 Wimbledon to Kensal Green Length: 12.1 km Planned Construction: Late 2009/early 2010 – 2016 London cable tunnels Expected timescales Hackney to St John’s Wood Hurst to Eltham • Informing the community Ongoing • Informing the community Ongoing • Planning submission Early 2009 • Planning submission Early 2009 • Start construction Autumn 2009 • Start construction Mid 2009 • Planned completion 2014 • Planned completion 2014 Willesden to St John’s Wood Wimbledon to Kensal Green • Informing the community Ongoing • Informing the community Ongoing • Planning submission Spring 2009 • Planning submission By Spring 2009 • Start construction Autumn 2009 • Start construction Late 2009/early 2010 • Planned completion 2015 • Planned completion 2016.

View Full Text

Details

  • File Type
    pdf
  • Upload Time
    -
  • Content Languages
    English
  • Upload User
    Anonymous/Not logged-in
  • File Pages
    9 Page
  • File Size
    -

Download

Channel Download Status
Express Download Enable

Copyright

We respect the copyrights and intellectual property rights of all users. All uploaded documents are either original works of the uploader or authorized works of the rightful owners.

  • Not to be reproduced or distributed without explicit permission.
  • Not used for commercial purposes outside of approved use cases.
  • Not used to infringe on the rights of the original creators.
  • If you believe any content infringes your copyright, please contact us immediately.

Support

For help with questions, suggestions, or problems, please contact us